Gis Engineer
CurrentDesigning of workflow process for GIS data conversion from non GIS compatible data into GIS format data and to create new GIS data:Detail facilities Dataset,- Geophysical, Geotechnical, Meteocean Dataset,- Three Dimensional (3D) Pipelines Dataset,- Cultural, Societal and Environmental Dataset,- Detail Facilities Dataset,- Offshore Platform NWD to 3D GIS Format.Updating spatial data in Total E&P Indonesie GeoDatabase:- Conversion the data CAD to GIS, to… Show more Designing of workflow process for GIS data conversion from non GIS compatible data into GIS format data and to create new GIS data:Detail facilities Dataset,- Geophysical, Geotechnical, Meteocean Dataset,- Three Dimensional (3D) Pipelines Dataset,- Cultural, Societal and Environmental Dataset,- Detail Facilities Dataset,- Offshore Platform NWD to 3D GIS Format.Updating spatial data in Total E&P Indonesie GeoDatabase:- Conversion the data CAD to GIS, to Updating SIGEO Spatial Dataset,- Updating Hidrographic Dataset (Bathymetric contour/depth, channel feature, SBNP, etc).- Upload backlog GIS data conversion result (data up to 2012) to TEPI GeoDatabase,- Upload Inshore Nearshore survey campaign 2013 result to TEPI GeoDatabase,- Upload Bathymetric campaign 2014 result to TEPI GeoDatabase,- Convert Facilities non Pipeline from Topographic Pipeline Survey (ROW boundary, Land marking, Protection Pile, etc) to TEPI GeoDatabase and/or APDM Personal GeoDatabase.- Conversion Backlog Company Topographic CAD Drawings to Company Standard of GIS Geodatabase (SSDM).- Manage Point Into Grid Topographic Database same patterns as grid of Bathymetric.- Store GCP Point (GPS POINT) in GIS format as per GS-EP-401.- Updating Spatial Data Land Parcel of Status Acquitted, Rectification (map image land parcel aqcuitted),- Create Geodatabase and Relationships Data Spatial for the Land Parcel Information System which contains link to scanned pdf document from SDS, land attribute for SKK MIGAS (format 23 columns),- Create 3D Pipelines (Additional),- Create Cartographic of Senipah site base on ESRI Mapping Format,- Mosaicking, Orthorectification, and Color Balancing: Multibeam raster before 2014 (data supplied), Multibeam raster after 2014 include result inspection PL 2015/2016 (data supplied), Magneto raster before 2014 (data supplied), Magneto raster of result inspection PL 2015/2016 (data supplied), - Update facilities (pipelines, protection piles, etc). Show less