AeroLeads people directory · profile

Austin Davis Email & Phone Number

Project Manager - BHDM Additions and Renovations at Barton Malow
Location: Newburgh, Indiana, United States 13 work roles 2 schools
1 work email found @bartonmalow.com 2 phones found area 248 LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email · 2 phones

Work email a****@bartonmalow.com
Direct phone (248) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Project Manager - BHDM Additions and Renovations
Location
Newburgh, Indiana, United States
Company size

Who is Austin Davis? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Austin Davis is listed as Project Manager - BHDM Additions and Renovations at Barton Malow, a with 1315 employees, based in Newburgh, Indiana, United States. AeroLeads shows a work email signal at bartonmalow.com, phone signal with area code 248, and a matched LinkedIn profile for Austin Davis.

Austin Davis previously worked as Senior Project Engineer - Vanderburgh County Jail Expansion & Coroner's Office at Barton Malow and Senior Project Engineer - Missouri University Children's Hospital at Barton Malow. Austin Davis holds Bachelor'S Degree, Architecture from Texas Tech University College Of Architecture (Ttu Coa).

Company email context

Email format at Barton Malow

This section adds company-level context without repeating Austin Davis's masked contact details.

{first}.{last}@bartonmalow.com
89% confidence

AeroLeads found 1 current-domain work email signal for Austin Davis. Compare company email patterns before reaching out.

Profile bio

About Austin Davis

Austin Davis is a Project Manager - BHDM Additions and Renovations at Barton Malow. He possess expertise in revit, autocad, rhino 3d, sketchup, photoshop and 15 more skills.

Listed skills include Revit, Autocad, Rhino 3D, Sketchup, and 16 others.

Current workplace

Austin Davis's current company

Company context helps verify the profile and gives searchers a useful next step.

Barton Malow
Barton Malow
Project Manager - BHDM Additions and Renovations
southfield, michigan, united states
Website
Employees
1315
AeroLeads page
13 roles

Austin Davis work experience

A career timeline built from the work history available for this profile.

Project Manager - Bhdm Additions And Renovations

Newburgh, In, Us

Senior Project Engineer - Vanderburgh County Jail Expansion & Coroner'S Office

Evansville, Indiana, United States

Jail Expansion:The project consists of a 160 bed, 39,067 square foot addition to the existing jail. This consists of a two-story jail pod (34,986 sqft) and a single-story secure walkway (4,080 sqft) that connects it to the other pods and booking/intake. The jail expansion will include twelve (12) beds for male juvenile, four (4) beds for female juvenile, sixteen (16) beds for administrative segregation, one-hundred twenty-eight (128) beds for general populace (male or female), and support spaces as required. The first level will contain spaces for classrooms, consultation, video arraignment, video arraignment holding, and two (2) padded cells. The second level will contain a new mental health unit, building support spaces, and local control with support spaces.Coroners Office:The project is a replacement building for the existing Vanderburgh County Coroner’s Office and will be located on the Vanderburgh County Jail Site adjacent to the Sheriff’s Operation Center. The new building will be a pre-engineered metal building (PEMB) of approximately 8,863 square feet. The Pre-engineered Metal Building basis will be a straight-column clear span, single slope frame. Roof slope will be 1/2:12. The building will have office spaces, associated support spaces, autopsy space that includes a walk-in freezer and cooler, a DNA lab, and locker room, a vehicle sallyport, and mechanical and electrical spaces.

Senior Project Engineer - Missouri University Children'S Hospital

Columbia, Missouri, United States

As part of a campus wide effort to centralize its facilities, University of Missouri Health Care is on track to relocate its Children’s Hospital to a new $232-million facility after it completes in summer 2024. Under construction since March 2021, the 323,000-sq-ft hospital in Columbia, Mo., is one of the largest and most ambitious projects in the university’s history. The nine-level concrete structure—which is being built by a joint venture of PARIC and Barton Malow—is located directly adjacent to an existing patient care tower. The two structures will connect to allow MU Health Care to integrate critical services for women and children in a single location. When it opens next year, the new facility will include inpatient services, an intensive care unit, pediatric surgery suites and the Children’s Cancer and Blood Disorders Unit. Additionally, women’s services will include a labor and delivery unit and a neonatal intensive care unit.The final design concept called for a building that rises three stories above ground, then cantilevers out on two facades to create larger floor plates on the upper levels. At the ground level, crews excavated a basement level that was designed to hold a loading dock, mechanical spaces and back-of-house services. The foundation is set on piers that extend between 15 ft and 63 ft down to limestone. The piers range in diameter from 3 ft wide to 8 ft wide. For the basement spaces, an upturned beam system was used to share the load and allow more distance between columns near the loading dock

Aug 2023 - Feb 2024

Senior Project Engineer - Baptist Health Deaconess Madisonville - Chiller Replacement

Madisonville, Kentucky, United States

Project includes selective demolition, renovation and addition of approximately 80,312 SF on the First, Second and Sixth Floor of the Hospital. The First-Floor projects include an expanded Cancer Center, Emergency Department, Surgery Department, CEP Renovations and MEP room additions. The Second Flood projects include the renovation to the Sterile Processing Department and reconfiguration of the Loading Dock. The Sixth-Floor project will include a renovation of an existing unit to provide a new Geriatric Behavioral Health Unit and Outpatient Behavioral Health Unit on a portion of the Sixth Floor.In addition to the projects mentioned above, various infrastructure improvements throughout the facility will occur to support existing and new hospital areas.

Aug 2022 - Aug 2023

Project Engineer Ii - Domo Development

Evansville, Indiana, United States

Demolition and Implosion of the Old National Bank Building in downtown Evansville.

Aug 2021 - Aug 2022

Project Engineer Ii - Deaconess Gi Specialty Clinic

Newburgh, Indiana, United States

140,000 square-foot facility that will allow patients with digestive disorders to receive care from GI experts in one centralized location at Deaconess Gateway Hospital.Services will include diagnostic and interventional endoscopic procedures, diagnostic imaging and lab services, GI* specialist consult care, along with nutritional and surgical consultation.The building will include:- An endoscopy suite with 9 procedure rooms and 48 pre/post procedure bays.- A GI Quick Care, offering same/next day appointments for patients with urgent digestive issues- GI Clinic for pediatric and adult patients with a research Institute at Deaconess Clinic for clinical trials.- A GI Specialty Clinic dedicated to complex GI conditions.- Medical Weight Loss Clinic.- Conference/education room for patient education and support groups.- Radiology and lab services.

Jan 2021 - Aug 2021

Project Engineer - University Of Pittsburgh Medical Center - Vision & Rehabilitation Tower

Greater Pittsburgh Area

The UPMC Vision and Rehabilitation Tower is designed for the many patients in the Pittsburgh region and beyond who need physical rehabilitation and those who have diseases of the eye or vision impairment. The space is carefully planned to welcome all patients and visitors with the thoughtful placement of physical cues that will help navigate from the point of entry throughout the entirety of the hospital. - Designed by HOK.- 410,000 sq. ft., 9 stories.- Designed for patients with limited mobility and vision impairment.- Collaborative space for clinicians, researchers, educators and industry partners.

Mar 2019 - Jan 2021

Project Engineer - Beaumont Hospital

Farmington Hills, Michigan

New construction at the hospital will total more than 193,000 square-feet and renovations will be made to more than 61,500 square-feet of existing space.Construction of the new East Pavilion and South Tower is expected to run through 2018. Once completed, older areas of the hospital will be renovated.Expansion and Renovation of the East Pavilion:- Expanded emergency and level II trauma center with 58 treatment and evaluation bays, including three trauma rooms, increasing capacity by nearly 40 percent.- Expanded surgical services department with nine operating rooms, 27 private patient rooms and a large, comfortable family waiting area- New 20-bed critical care unit- Relocation of the hospital’s helipadNew Five-story Tower:- 80 new private rooms- A new lobby and reception area to welcome patients, families and visitors- A 29-bay observation unit- Dedicated unit for orthopedic, oncology and respiratory care patientsSixty-five patient rooms in the existing hospital will also be renovated into private rooms as part of the project. In addition, 45 semi-private rooms will be updated. When construction is complete, the hospital will have 165 private rooms and 165 semi-private rooms, for a total 330 beds, which is the same number of beds that existed prior to construction. https://www.beaumont.org/giving/campaigns/farmington-hills-campus-expansion

Jun 2018 - Mar 2019

Project Engineer - Deaconess Gateway Hospital

Evansville, Indiana Area

Deaconess Gateway Hospital $135 million project includes:Orthopedic/Neuroscience Specialty Hospital- 215,000 square foot, six-story tower built on the North side of Deaconess Gateway Hospital.- The new tower is designated as a specialty hospital providing a complete range of care for orthopedic and neuroscience patients. This includes interventional, medical, and surgical services as well as diagnostic imaging, therapy, research, and education.Medical Office Building- A five-story, 100,000 square foot medical office building will be constructed on the Gateway campus adjacent to the Gateway Professional Building. Deaconess Clinic physician offices and related services such as laboratory and imaging will be located in this building. Attached Parking GarageEnhanced Energy CenterNICU RenovationLab & Pharmacy RenovationMRI Replacementhttp://www.deaconess.com/gatewayexpansion

Dec 2016 - Jun 2018

Project Intern - Facility For Rare Isotope Beams - Michigan State University

Southfield, Michigan

Nov 2015 - Jan 2016

Project Engineer / Project Manager / Superintendent Intern

Royal Oak, Michigan

May 2014 - Aug 2014

Mason Laborer

Muirhead Construction

Milford, Michigan

May 2008 - Sep 2008
Team & coworkers

Colleagues at Barton Malow

Other employees you can reach at bartonmalow.com. View company contacts for 1315 employees →

2 education records

Austin Davis education

FAQ

Frequently asked questions about Austin Davis

Quick answers generated from the profile data available on this page.

What company does Austin Davis work for?

Austin Davis works for Barton Malow.

What is Austin Davis's role at Barton Malow?

Austin Davis is listed as Project Manager - BHDM Additions and Renovations at Barton Malow.

What is Austin Davis's email address?

AeroLeads has found 1 work email signal at @bartonmalow.com for Austin Davis at Barton Malow.

What is Austin Davis's phone number?

AeroLeads has found 2 phone signal(s) with area code 248 for Austin Davis at Barton Malow.

Where is Austin Davis based?

Austin Davis is based in Newburgh, Indiana, United States while working with Barton Malow.

What companies has Austin Davis worked for?

Austin Davis has worked for Barton Malow, Barton Malow Company, Kasco Construction Inc., Haselden Construction, and Muirhead Construction.

Who are Austin Davis's colleagues at Barton Malow?

Austin Davis's colleagues at Barton Malow include Ann Garrison, Elizabeth Davis, William Barber, Ben Maibach, and May Smith.

How can I contact Austin Davis?

You can use AeroLeads to view verified contact signals for Austin Davis at Barton Malow, including work email, phone, and LinkedIn data when available.

What schools did Austin Davis attend?

Austin Davis holds Bachelor'S Degree, Architecture from Texas Tech University College Of Architecture (Ttu Coa).

What skills is Austin Davis known for?

Austin Davis is listed with skills including Revit, Autocad, Rhino 3D, Sketchup, Photoshop, Illustrator, Archicad, and Autodesk Inventor.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Austin Davis you were looking for.

View similar profiles