AeroLeads people directory · profile

Ayman Maher Email & Phone Number

LEED V4 GA , Mechanical Construction Manager Hassan Allam Construction at Hassan Allam Construction
Location: New Cairo, Cairo, Egypt 7 work roles 2 schools
1 work email found @baytur.com.sa LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email a****@baytur.com.sa
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Hassan Allam Construction
Role
LEED V4 GA , Mechanical Construction Manager Hassan Allam Construction
Location
New Cairo, Cairo, Egypt

Who is Ayman Maher? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Ayman Maher is listed as LEED V4 GA , Mechanical Construction Manager Hassan Allam Construction at Hassan Allam Construction, based in New Cairo, Cairo, Egypt. AeroLeads shows a work email signal at baytur.com.sa and a matched LinkedIn profile for Ayman Maher.

Ayman Maher previously worked as Mechanical Construction Manager at Hassan Allam Construction and Mechanical Construction Manager at Hassan Allam Technologies (Hat). Ayman Maher holds Bachelor, Mechanical Engineering from Cairo University.

Company email context

Email format at Hassan Allam Construction

This section adds company-level context without repeating Ayman Maher's masked contact details.

{first}.{last}@baytur.com.sa
86% confidence

AeroLeads found 1 current-domain work email signal for Ayman Maher. Compare company email patterns before reaching out.

Profile bio

About Ayman Maher

• Ayman Maher brings 14 years of experience in HVAC, Plumbing, and Fire fighting systems, Infra structure mainly in newly constructed buildings and also in renovation of existing buildings • Systems for different kind of applications In Office buildings , high rise hotels Hospitals , Banks, Commercial buildings , tunnels ,Stadiums• Installations, testing commissioning, supervision & Design for all aspects of HVAC systems (Manual load estimation E20 sheet &computerized withHAP4.3), Central (chilled water) air conditioning, parking ventilation, tunnel ventilation, Water chillers, district cooling plants, Fans, jet fans, AHUs, Fcus, pumps, heat exchangers (ETS.)• Waste, Drainage, water supply networks (hot, cold & grey water, tanks, Boilers, clean steam generators, pumps, valves piping networks, lifting stations, sanitary fixtures).in and around buildings• Fire suppression systems (sprinklers, foam , FM-200 systems, Novec1230) • Infrastructure work storm water, sewage& domestic pipe lines. All aspects of design conforming to ASHRAE, NFPA, SMACNA, UPC, HTM-2022 and Certified European Quality Standards

Listed skills include Engineering, Autocad, Mep, Hvac, and 20 others.

Current workplace

Ayman Maher's current company

Company context helps verify the profile and gives searchers a useful next step.

Hassan Allam Construction
Hassan Allam Construction
LEED V4 GA , Mechanical Construction Manager Hassan Allam Construction
7 roles · 23 years

Ayman Maher work experience

A career timeline built from the work history available for this profile.

Mechanical Construction Manager

Current
Hassan Allam Construction

Egypt

Soul Luxury Beach Resort , Emaar Miser/ EA , North Coast , Egypt

Aug 2023 - Present

Mechanical Construction Manager

Egypt

RHMP, Reviving Humanity Memorial Sharm El sheik , Egypt Suez Authority Stadium , Ismailia , Egypt AAIB One Ninety LEED GOLD Project , Cairo , Egypt

May 2019 - Nov 2023

Mechanical Site Cheif

Makkah

Mechanical site chief reporting to M.E.P. Manager:Job description (HVAC, Plumbing, Firefighting) • JODP : Jabal Omar Development Project (Phase-2 - Zone S3/S4) (Sheraton / Westin 5 stars Hotels) High Rise , KSA, MakahHigh rise 34stories (200,000M ²) building with common 10 stories podium & four 24 stories towers Building cooling capacity is ( 10000 TR ) served by district cooling plant through 10 plate heat exchangers ,AHUs, APUs, FCUs ,Pumps .Fresh air through Heat Recovery units, Exhaust fans, Parking ventilation, Kitchen hoodsSprinkler system, F M-200, Domestic water, drainage systems, BMS.

Aug 2014 - May 2019

Senior Mechanical Site Engineer

Saudi Arabia

Senior Mechanical Supervision Engineer / reporting to the project Resident Engineer:Job description (HVAC, Plumbing, Firefighting) 1. Reviewing shop drawings as per design, Reviewing the submitted materials as per project specs and codes 2. Reviewing the pre-construction phase documents such as builders work , structural coordination drawings with beams and hollow core slabs , Block work drawings ,slab embedded drainage3. Coordinate between the heights in drawings and the actual constructed ceiling heights to avoid any discrepancies in the false ceiling heights, mechanical coordination drawings4. Checking any materials received at site as per approved suppliers and country of origin , witnessing mechanical installations , coordination and testing 5. As built drawing, testing & commissioning, snag list preparation and follow up.Projects:-• King Saud University Endowment Project Riyadh, (KSUE) Hilton Residential suites. High Rise(SDC / Drake & Scull )• King Saud University Endowment Project Riyadh, (KSUE) 100 Bed Hospital (Inter Health Canada).• King Saud University Endowment Project Riyadh, (KSUE) Office Building High Rise (Al-Aamody building).• HRH ARQA Palace Firefighting system renovation • King Abdullah Financial district (KAFD) - Skywalk project - (Saudi Diyar Consultants).

Mar 2010 - Jul 2014

Mechanical Site Engineer

Saudi Arabia

2007 – 2010: Fressenit Saudi Arabia Jeddah (STS AL Taafuf Electromechanical contractor), KSA (Mechanical Site Engineer / Reporting to the Project Manger):Job description (HVAC, Plumbing, Firefighting) 1. Study the project specifications and approvals, Material take off as per site condition and approved submittals, prioritizing areas for work according to civil casting schedules. 2. Estimation of the required manpower and equipment, storage facilities 3. Organize the work priorities as per the planning schedule.4. coordination of mechanical work with all other disciplines in site and proceed with installation 5. follow procurement/suppliers for material delivery dates and any required data or documents e.g. pump test curves ,CFD analysis ,control sequence requirements 6. do pre test for the installed application before inspected by the consultant 7. submit the inspection request to the consultant , 8. preparation for commissioning process (pre-design phase , design phase, construction phase ,occupancy and operation phase )Projects:-• Bay la sun-KAEC, KSA. • Jeddah Gate, Jeddah, KSA.• Eidaby 50-bed hospital Jazan, KSA.

Dec 2007 - Feb 2010

Mechanical Site Engineer

Ipec

Egypt

MECHANICAL ENGINEER / FITTER TO SUPERVISOR 2006 – 2007: IPEC Cairo, Egypt (Mechanical Site Engineer / Reporting to the General manger ) :• National telecommunication institute smart village, Egypt : HVAC, Firefighting.• Service complex smart village Egypt: HVAC, Firefighting. • Al-Ahly bank kenna branch: HVAC-(Design and build). .

Aug 2006 - Nov 2007

Mechanical Design Engineer

Egyptian Consulting House( Ech)

Egypt

2004 – 2006 ECH. Egyptian Consulting House, Cairo, Egypt (Mechanical Design Engineer/ Reporting to the Head of Department):• Safwa Towers Makah, KSA. : HVAC7000 TR Chilled water system, 32 storey High rise project on Haram, Mekkah, KSA.Comprising of twenty two floors of hotel rooms, 7 floors of commercial, praying halls, food courts, mechanical floor And car parking. Responsibilities/Tasks: Team Leader for acknowledging the owner requirements setting the preliminary design , dividing the building into zones and spaces the proceeding with the cooling load estimation using HAP, Selection For required equipment, determine the ventilation requirements & exhaust system, duct and pipe size design, air outlets distribution, selecting the appropriate control method based on the activity on each zone . Stair case pressurization fans, elevator shafts pressurization smoke evacuation fans. • Sheraton, Al Maddinah, KSA: HVAC.3000 TR Chilled water system, Responsibilities/Tasks: Design of Hvac. System• CIB Nile Hilton branch, Cairo: HVAC.180 TR DX air systems, Responsibilities/Tasks: Design of Hvac. System

2004 - 2006 ~2 yrs
2 education records

Ayman Maher education

High School, English Language And Literature/Letters

Orman Experimental School
FAQ

Frequently asked questions about Ayman Maher

Quick answers generated from the profile data available on this page.

What company does Ayman Maher work for?

Ayman Maher works for Hassan Allam Construction.

What is Ayman Maher's role at Hassan Allam Construction?

Ayman Maher is listed as LEED V4 GA , Mechanical Construction Manager Hassan Allam Construction at Hassan Allam Construction.

What is Ayman Maher's email address?

AeroLeads has found 1 work email signal at @baytur.com.sa for Ayman Maher at Hassan Allam Construction.

Where is Ayman Maher based?

Ayman Maher is based in New Cairo, Cairo, Egypt while working with Hassan Allam Construction.

What companies has Ayman Maher worked for?

Ayman Maher has worked for Hassan Allam Construction, Hassan Allam Technologies (Hat), Sa Baytur Construction Co, Saudi Diyar Consulting, and Freyssinet Saudi Arabia.

How can I contact Ayman Maher?

You can use AeroLeads to view verified contact signals for Ayman Maher at Hassan Allam Construction, including work email, phone, and LinkedIn data when available.

What schools did Ayman Maher attend?

Ayman Maher holds Bachelor, Mechanical Engineering from Cairo University.

What skills is Ayman Maher known for?

Ayman Maher is listed with skills including Engineering, Autocad, Mep, Hvac, Construction, Cad, Project Estimation, and Project Engineering.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Ayman Maher you were looking for.

View similar profiles