Engineer Ii
CurrentJoin Mammoet after ALE acquisition. Perform calculation analysis and presentation drawing for technical tender document for various heavy lift work such as SPMT operation, ballasting operation (load out, load in, transshipment), weighing, jacking (climbing jack, jack & pack, JS500), skidding ( skid beam, skid shoe) and lifting.Prepare procedure, calculation (Stability, beam analysis, load spreader) & packing list for awarded job (client and MWS approval).Attend operation meeting, JHA and assist operation team on site.Project involve:-1. Thai Oil Clean Fuel Project - Load out/in, Transhipment, SPMT operation and jacking (JS500) for UJV, Thailand (2020-Now)2. Bukit Tua Phase 2B Project - Load out of Jacket and Topside for Pt Meindo, Bintan, Indonesia (2020)3. NFE Qatar Gas Project - Load out of 4 Jacket for PT. McDermott, Batam, Indonesia (2020)4. Cambodia Apsara Project - Load out of Jacket and Topside for NOV, Batam, Indonesia (2020)5. Jawa-1 CCPP IPP Project - Load out of modules for Pt Meindo, Bintan, Indonesia (2020)6. Formosa 2 OWF Jacket - Proposal for 15 jacket load out for SMOE, Batam, Indonesia (2020)