Environment, Health And Safety Manager
Abu Dhabi Emirate, United Arab Emirates
Retail Facility Management is service company which provides a full range of property management services for Aldar Asset Management. Facility management contract components cover Hard ( CCTV system, Access System, Air Conditioning, Fire Safety, Structural maintenance, Heating & Ventilation System, Mechanical & Electrical Services, Gas Facility & Soft (Pest control, cleaning services, ground maintenance, waste management, Concierge & Reception services) facility management. Facility HSE Personnel: 2 HSE engineer, 1 Fire Marshal, 2 paramedics. Develop an Emergency Response procedures and all safety procedures for facility management of the Aldar . Part of the developed procedures: Facility HSE Management Plan, Emergency Response and Crisis Management Plan, Covid-19 Contingency Plan, Lock out & Tag Out Procedure, Facility Permit to Work Procedure, Fire & Life Safety Phasing Strategy, Waste Management Procedure, Procedure for Working at Height & Rope Access, Incident Investigation Procedure, Evacuation Response and Fire Management Plan. Participate commissioning and hand over process of the Abu Dhabi Plaza utility system and snagging of safety related items . Testing and Commissioning of entire building a fire suppression system ( a foam, gas, sprinkler system, stand pipe & hose system, a firefighting pump), according to NFPA-101, 13, 72, 10, 25, 3, 16 ,17. Testing and commissioning of the fire alarm system, a fire alarm system cause and effect testing for entire building. This test includes the shutting down of air supplies, opening of vents, closure of dampers, relocate the elevator to the designated recall floor, shutting down of fuel supplies, unlocking of access-controlled doors, closing of held open fire doors, signaling to the fire authorities, phased evacuation operation of sounders and visual indicators or voice alarm speakers.