Bala Murugan Email and Phone Number
Summary of Experience: 15 years in Construction:8 YEARS- Oil & Gas Refinery Industrial Structures like Longitudinal storage hall(LSH),Substation building, Instrument Building ,Sulphur pits ,Geotechnical investigation & Settlement monitoring works etc.,,7 YEARS- Water Supply &Treatment projects/ Reverse Osmosis Plant.
Gas & Oil Fields Services Company " Gofsco "
View- Website:
- gofsco.com
- Employees:
- 127
-
Site Civil EngineerGas & Oil Fields Services Company " Gofsco " Feb 2018 - PresentKuwaitName of the project: CFP Stand by Contract for Pre-Commissioni&Commissioning Support Works for MAB2 EPC package.Client:- KNPC(Kuwait National Petroleum Company)• Geotechnical Investigation & Settlement Monitoring work 1650nos of DPH(Dynamic Probing Heavy Test),10nos of BH(Borehole test),02nos of Trial Pit excavation(5.5m deep excavation to examine Soil strata) for control test.•Name of the project: EPF-50 Upgrade to 210 MMSCFD Phase – III, KOC – North Kuwait Client : KOC(Kuwait Oil Company)• Revamp of 50 MBOPD Early Production Facility in North Kuwait, The project envisages enhancing of production capacity of the plant from 175 MMSCFD & 50 MBOPD to 210 MMSCFD & 80 MBOPD. JURASSIC PRODECTION FACILITIES (JPF) PROJECT Construction of Sulphur pit at Sabriya & East Raudhatain NORTH KUWAIT.(Feb2018 To Feb2019)Client:- KOC,SCHLUMBERGER• Construction of New Sulfur pits for JPF-1&2 Sabriya & East Rawdatain –Schlumberger.• Sulphur pit 23m length, 9m wide & 6.5 m depth(Under ground pit) total -4nos.• Pit Build with Concrete walls M30 mix concrete supplied by Alkoraf ready mix.• Inside sulphur pit covered with Acid resistance brick (S 50 HF STEULER) 25mm thk Fire lite 2300 VLI and joint pointing filled with( Acid cement AE) 4mm thk and Furadur cement 2mm.• Roof bottom of slab covered with Epoxy 3layer primer plus 2 cover layer(KCH VE)STEULER• Construction of degassing box covered with SS lining inside the pit. Keraflake 6H insulation board 40mm thk filled between wall and SS plate.• Construction of Hydraulic seal pit size(10mx2.5mx1.5m)300mm thk wall.• Schlumberger Reservoir Products FZE entrusted Siirtec Nigi to design and supply two modular Sulphur Recovery Units at Sabriya and East Raudhatain Gas Treatment Plants of the Kuwait Oil Company. The two SRUs will produce 200 t/d of liquid Sulphur each with a recovery of 99.9% -
Civil EngineerDaelim Industrial Co., Ltd. Jan 2015 - Jan 2018Kuwait Company : DAELIM INDUSTRIAL CO(Jan2015 - Feb2018)Name of the project :SHFP(SULPHUR HANDLING FACILITIES(REVAMP & NEW) at MAA refinery (KUWAIT)- Project value : 147,309,710.00 KD Client:- KNPC(KUWAIT NATIONAL PETROLEUM COMPANY) Responsibilities: CIVIL/BUILDING INSPECTOR. Quantity surveying. Construction of Civil structures like LSH(LOGITUDINAL STORAGE BUILDING-26880Sq.m. Preparing of Sub grade using grader to maintain slop like a V-shape (one side 5degree and another side 11degee). Every 100sq.m area conducting FDT(field density test) for sub grade compaction with 95% of proctor value. Sloped reinforced paving inside the Longitudinal storage hall 60mx 280m filled with M30 grade concrete supplied by NBTC ready mix concrete. Civil structural column erections prior to fixing of shim plate with non shrink grout. Installation of side bracing, purlin, Roof cladding sheets, Roof rain water drain line etc. Conducting bolt torque test prior to start cladding work. Construction of Civil structures like ELECTRICAL SUBSTATION, INSTRUMENT BUILDING, CONVEYOR PEDESTALS, ROAD, DITCH, STRUCTURAL PEDESTALS WITH BOLT. Performed well under my supervision working inside cellar area(confined space permit required) for substation and instrument building for cable pulling and tray installation work. All the substation and instrument building build with concrete walls For Insulation inside the building covered with brick wall 115mm thk and 40 mm thk thermal insulation board fixed anchor support. Floor covered with 3layer primer and 2coat of thick layer epoxy coating gray green colour. -
Civil EngineerLarsen & Toubro Mar 2013 - Jan 2015India Company : LARSEN & TOUBRO LTD (L&T)- (Mar2013 - Dec 2014) Designation : Engineer (Water Pipeline)Name of project: TCMC (Thoothukudi City Municipal Corporation Water Supply Project Package-1&2 (Funded by JICA). Project value : 108 Crores.Responsibilities:• Laying of DI & MS pipe for Internal Transmission Main(ITM)• Total 35km (10.85 km 1100mm dia, 24.15km 1200mm dia)• Checking of Trench formation level.• Checking of Bedding 300mm thick with sieved soil.• Laying & fitting of MS pipeline parallel to National highway.• Excavation & Blasting for the entire 35km stretch.• Construction of Thrust Block, Valve chambers, Pump Houses & Sumps.• Hydro Testing of MS pipe line – Also Air test for MS pipe line every lap joint using Pressure Gauge. -
Assistant EngineerIvrcl Infrastructures And Projects Ltd Jun 2007 - Mar 2013India Company : IVRCL LIMITED (Jun2007 - Apr2013)- Assistant Engineer – Civil Execution As a Junior Engineer (Execution& QS) from June 2007 to July 2009(In Industrial Project)Name of project : 100 MLD Sea water Desalination Plant at Minjur, Chennai. Client : Chennai Metro Water.Responsibilities : Execution of civil structure of sand filter Features of sand filterType of sand filter : Rapid sand filter Project value : 510 Crores.Specialization of sand filter:• Key Focal point for all the levels should be monitor as a micro level error and alignment of filter water distribution pipe and also maintaining the top level of grouting while casting.• Execution of Civil structures of sand filter,Nozzle sleeve mounting should be properly tighten, Filters hydro testing,Distribution pipe clearances & hand over to process team.• After getting the clearance from process team, Conducting BUBBLE TEST for checking of bubble formation uniformly in all the nozzels in a bed. As an Asst. engineer (Execution& QS) July 2009 - June 2010.Name of project : TSUNAMI HOUSING PROJECT.Responsibilities : Construction of Tsunami house of 1463 nos, Internalroads,Drainage,Sewerage line.Project value :80.00 Crores. As an Asst. engineer (Execution & QS) from June 2010 to Dec 2011.Name of project : Hoggenakkal water Supply & Fluorosis Mitigation project Package-1 for TWAD Board (Funded by JICA).Project value : 220 Crores.Responsibilities:Laying of 600mm dia & Up to 150mm dia – 60 KM Ductile Iron pipe line for treated water transmission up to Sump and OHT. Also MS Pipeline 1500 dia –12 KM from Intake to Water treatment Plant,Water Treatment Plant to Booster Pumping station,BPS to Master Balancing reservoir (240LL). As an Asst. engineer (Execution & QS) Dec 2011 to Mar 2013Name of project : Hogenakkal water Supply & Fluorosis Mitigation project - Package-2 for TWAD Board (Funded by JICA).Project value : 220 Crores.Responsibilities:
Bala Murugan Education Details
-
First Class(Cgpa:-7.613) -
First Class(71.54%) -
E.C.I Matriculation Higher Secondary SchoolCivil Engineering
Frequently Asked Questions about Bala Murugan
What company does Bala Murugan work for?
Bala Murugan works for Gas & Oil Fields Services Company " Gofsco "
What is Bala Murugan's role at the current company?
Bala Murugan's current role is Civil Project Engineer at Gas & Oil Field Services Company.
What schools did Bala Murugan attend?
Bala Murugan attended Srm University, Jaya Polytechnic College - India, E.c.i Matriculation Higher Secondary School.
Who are Bala Murugan's colleagues?
Bala Murugan's colleagues are Tongged Andres, Rajab Ali, Zain Uddin, Jaidev Vaishnav, Francis Machado, Sufyan Alwellani, Patrick Freifer.
Not the Bala Murugan you were looking for?
-
-
-
1yahoo.co.in
-
1yahoo.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial