Mechatronics Engineering Intern
Current• Identified & resolved discharge faults by replacing faulty pneumatic cylinders with air-over-oil cylinders => Increased overall equipment effectiveness (OEE) by 6% for 3 internal bore grinders, saving 7.2 hours of downtime per week and $7,400/year.• Installed 2 new routes for an Autonomous Guided Vehicle in the plant: o Increased AGV moving utilization from 13.1% to 25% by doubling daily trips. o Partnered with Stantec for Health and Safety Review, ensuring compliance with safety standards. o Conducted 3 plant walkthroughs to simulate AGV speed and route timing, considering wall proximity and trip duration.• Scanned air leaks and analyzed data with machine learning: o Identified 38 air leaks across the plant in May 2024, coordinated with mechanics to save $5,300 in energy cost. o Aggregated data from 2023-2024 scans, achieving total annual savings of $15,600 by addressing recurring issues.