Survey Work
CurrentT.S Operating,Auto Level Operating,,ALL HIGHWAY & SURVEY WORK.Borrow Area Measurement, Stock Measurement, Center Line, Line Offset,Or Stake Out Point Lay Out, All Level Data Entry In Ms ExcelSixt Laning Of Varanasi –Aurangabad Section Of NH-2 From Km 786.000to 978.400(Length 192.400 Km) In The State Of Uttar Pradesh And Bihar On Design,Build, Finance, Operate and Transfer (DBFOT) Toll Basis under NHDP phase-v.