Şantiye Şefi
PS3 Site / Site Manager 120 m³/hour capacity concrete batching plant installation and management 4800 m² Pump House Building Construction 1100 m² Elektrical Building Construction 500 m² Transformer Building Construction 500 m² VSD Building Construction 150 m² Fire Figthing Building Construction 1100 m³ capacity 4 pieces Surge Vessel Foundation construction and installation Ps3 Pump Station 64 inches carbon steel pipe line installation, pressure relief line installation and valve shafts construction. Ps3 Pump Station Storm Water Line, Irrigation Line, Sewer Line, Fire Figthing Line installation, construction and installation of manholes and pump stations which are belong the mentioned pipe lines. HV, MV, Site Lightining, ICT Electrical cables installation Ps3 Pump Station Road Construction and Landscaping HPT Site / Lead Engineer 170.000 m³ capacity 7 pieces steel water tank foundation construction and installation 80 inches carbon steel pipe installation, Thrust Boring application, connection to Riyadh City Feeder Line and valve shaft construction. MV, LV, Site Ligthing cable installation Tank Farm İnernal Asphalt Road Construction and Landscaping Works 300.000 m³ Excavation-Backfilling Works