Barry Cronin Email and Phone Number
Barry Cronin work email
- Valid
Barry Cronin personal email
Senior Rail Engineering Surveyor : Currently a lead Surveyor supporting a resurfacing crew on Ballast Cleaning Project. Providing guidance to a 09-3X Tamper with the use of the Gedo Vorsys Dual Trolley System. Ensuring Track Geometry is achieved each day and the track is returned in a safe condiditon with appropiate speed restrictions applied. In 2010 I graduated from Cork Institute of Technology with a BSc Honours Degree in Construction Management.Since graduating I have accumulated over 8 years experience working as Surveyor in Australia. I have worked on large scale projects across WA, Queensland and Victoria.Some of the projects I have worked on include:Perth City Link: Sinking Fremantle Rail LineSolomon Mine: Kings Valley Ore Processing PlantRoy Hill: Track control Network and Track Set outPerth Underground Bus PortBayswater Level Crossing Removal (Victoria)Rosanna Level Crossing Removal (Victoria)RIO Tinto Major Rail RenewalsKoodaideri Tie in Project to main lineBallast Cleaning along RIO Tinto NetworkMost of my experience above is on Rail projects however I have covered most aspects of Surveying over the 8 years. Everything from Rail, Road, Building, Cadastral, Earthworks, Concrete, SMP, Holding down bolts, steel structures, bridges, tunnels, services and drainage
-
Senior Rail Engineering SurveyorRail & Engineering Surveys Apr 2021 - PresentEast Pilbara, Western Australia, Australia -
Senior Rail Engineering SurveyorMc Donald Surveys Jan 2019 - Apr 2021
-
Engineering SurveyorHeading & Associates Feb 2016 - Jun 2018Melbourne, Victoria, Australia -
Engineering SurveyorOracle Surveys Pty Ltd Apr 2015 - Jan 2016 -
SurveyorGeo-Metric Surveying Pty Ltd Jan 2014 - Apr 2015Pilbara WaFlinders Highway Flood Recovery, Charters Towers, Jan 2014 to June 2014:Road repairs, Stabilisation works, Culvert Re-construction and Concrete Margins.Worked alone and responsible for my own designated area of site. Worked with Excavators and Graders using Trimble Machine Control (GPS and UTS) to achieve 25mm tolerance for excavation and 15mm tolerance for final trim.Used Trimble S8 Total Station along with Trimble Access and SCS 900 Software, and also Trimble GPS equipment.Set-out surveys for culvert re-construction and concrete margins. All as-built surveys along with compilation of conformance reports and volume reports using 12D Model.Royhill Rail Project Package 2, Port Hedland, July 2014 to Date.Responsible Surveyors for installing Horizontal and Vertical Control Network.Levelling and Traversing of all installed control points and appropiate checks onto primary control.Using Leice DNA03 Level and Leica 1500 Total Station for Networking.Rail centre line set-out using Trimble GPS.
-
Engineering SurveyorBce Surveying May 2013 - Nov 2013Kings Valley Ore Processing Facility, Solomon Ore Project.A member of a hard working Survey team consisting of 12 Surveyors.Responsible for all SMP Survey works on site. Including alignment for crusher’s conveyor’s and pulleys, positioning and levels for all Steel Modules.Used Trimble S8 Robotic Total Station with TSC3 Controller and DiNi Digital Level.Reported to Head Engineer daily with all my Survey results.Hard consistent worker, working 77 hours per week on a 3:1 FIFO roster.
-
Engineering SurveyorSurex Surveyors Jan 2012 - Apr 2013Perth City Link Project, Perth.A member of a hard working Survey team consisting of 8 Surveyors.Responsible for carrying out a number of levelling and 3D surveys each day, as part of a monitoring procedure, in accordance with the survey manager’s instructions. I was assisted on these surveys by my own trainee. Monitoring was large and important aspect on this project, its purpose was to show any settlement on site or in nearby buildings due to on-going construction works. Results were vitally important each day and may have affected construction works.Carried out as-built surveys and assisted senior Surveyors with setting out surveys using a Leica Total station 1200 (with Viva Controller) and GPS. I reduced the data from each survey and checked for errors using a program called Star Net. All our as built surveys were shown using Terramodel.Proving to be a hard dedicated and consistent worker, showing excellent punctuality and the ability to work 55 hours per week.
Barry Cronin Skills
Barry Cronin Education Details
-
Construction Management
Frequently Asked Questions about Barry Cronin
What company does Barry Cronin work for?
Barry Cronin works for Rail & Engineering Surveys
What is Barry Cronin's role at the current company?
Barry Cronin's current role is Senior Rail Engineering Surveyor at Rail & Engineering Surveys.
What is Barry Cronin's email address?
Barry Cronin's email address is ba****@****.com.au
What schools did Barry Cronin attend?
Barry Cronin attended Cork Institute Of Technology.
What skills is Barry Cronin known for?
Barry Cronin has skills like Project Management, Engineering Surveys, Microsoft Excel, Microsoft Word, Microsoft Project, Terramodel, Star Net, Cad, Leica Total Station, Trimble Gps, Trimble Total Station, Estimating.
Not the Barry Cronin you were looking for?
-
Barry Cronin
Morwell, Vic -
-
-
James Barry Cronin
West End, Qld
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial