Mechanical Engineer
Mapa İnşaat
Irbid Governorate, Jordan
Construction of a (30 MCM / year) Water Treatment Plant with four high lift pump stations, one low lift intake pump station and 25.6 km long Transmission pipeline.The plant includes common water treatment equipment like mixers, sludge collection system,chlorine and chlorine dioxide generation systems, polymer injection system, filter under drain system, UV-system, 1250 HP vertical turbine pumps, sludge treatment systems such gravity thickeners, many pump types such lobe pumps, hose pumps, progressive cavity pumps, centrifugal pumps and vertical turbine pumps, in addition to infrastructure works using many types of piping systems such as Steel pipes, Ductile pipes, Stainless steel, Galvanized, Copper and PVC pipes.The transmission Pipeline is Steel pipe, 25.6 km long and 1200 mm in diameter.Lead Mechanical Engineer fully responsible for the planning, preparation, installing, quality controlling and testing all mechanical works, purchasing project’s water treatment equipment, managing all mechanical works within the site and the office, quantity surveying for all related mechanical materials, technical submittals preparation and monthly Interim Payment Certificate preparation.