Joined DP Engineering in January 2008 and have developed Electrical design modifications at a variety of Nuclear Power Plants across the United States including ANO, Palo Verde, River Bend Station, FitzPatrick, and Comanche Peak. During the Fire Safe Shutdown Analysis implementation at Comanche Peak, I trained to become a qualified Test Engineer and performed Post Modification Testing during 3 Plant Refueling Outages. Additionally, I have led multi-discipline projects as a Project Engineer with budgets ranging from $200k to $800k. My skillset and diverse experience in Nuclear Power led me to become the Supervisor over the Electrical, I&C, and Digital Modification Team personnel. In 2019, I joined ENERCON Services and have continued to lead a team of Electrical and I&C personnel in the Baton Rouge and Fort Worth offices. In 2021, I took on a Project Management role for Columbia Generating Station and was then promoted to Engineering Manager for the Entergy Division.
Listed skills include Electrical Engineering, Electricians, Project Engineering, Engineering, and 27 others.