Dir. Network Execution And Transformational Projects
Coca-Cola Refreshments Usa Inc
• Large project ideation, design and execution ($5MM to $200MM); includes line, manufacturing, distribution, utility system design and executiono Responsible for the design and execution of a 1 million sq/ft Production and Distribution facility in Texas. Facility design included 700,000 sq/ft warehouse and 300,000 sq/ft production area. Production spaced was designed for 10 production lines and the warehouse was completely racked out with future expansion for ASRS and LGVs as demand increases. Initial facility design capacity is 80MM cases/annually with future expansion to 120MM cases/annually.• Warehouse automation project ($10MM – $50MM) design and execution for picking at the case and pallet levelso Completed 3 automated case and pallet picking automation projects in California, Michigan and Connecticut. Projects ranged in size from 30,000 sq/ft to 80,000 sq/ft with new and existing facility upgrades. Case & pallet conveyor, palletizers, depalletizers, auto case picking, PLC and PC control systems were all included in the project scope. System design capacities ranged from 2,000 to 6,000 cases/min. o Lead engineer with project design and execution responsibilities for ASRS and AGV system capacity upgrades at the Louisiana PC/DC. Case and pallet conveyor systems, AGV to LGV conversion, ASRS expansion and controls upgrades were all included in the project scope. • Responsible for NA Supply Chain manufacturing system design improvements; packaging, processing and integration• Strategy, R&D, Innovation and Infrastructure Planning team liaison evaluating existing and new processes and acquisitions • Reliability team lead; improved manufacturing and processing equipment reliability / capability via 6 Sigma principles• Assess facility expansion capability and develop infrastructure improvement plans to increase capacity and flexibility