Mechanical Engineer
Currentproject: construct of desalination and power plaint( 3100MW) - yanbu phase 3
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
Beshri Kamel is listed as Mechanical Engineer at Fichtner Consulting Engineers, a with 1107 employees, based in Saudi Arabia. AeroLeads shows a matched LinkedIn profile for Beshri Kamel.
Beshri Kamel previously worked as YANBU POWER AND DESALINATION PLANT -PHASE 3 at Fichtner Gmbh & Co. Kg and field mechanical engineer at Poyry. Beshri Kamel holds Bachelor Of Engineering (B.E.), Mechanical Engineering from B.Sc. Mechanical Engineering.
This section adds company-level context without repeating Beshri Kamel's masked contact details.
Review company-level records connected to Beshri Kamel before choosing the right outreach path.
Experience Summary:Mechanical Engineering with (16) years of experience in Power Generating Stations and Water Treatment Projects from Construction to Commissioning, Start up, Operation and Maintenance works. Expertise in Mechanical Engineering and Mechanical Rotating Equipments inspection.
Listed skills include Engineering, Embedded Systems, Manufacturing, Electronics, and 27 others.
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
Saline Water Conversion Corporation
project: construct of desalination and power plaint( 3100MW) - yanbu phase 3
Shoaiba Ll Ccpp (Saudi Electicity Company)
Work Experience From 20-10-2012to - 30-3-2015: field mechanical engineer at POYRY in shoaiba ll CCPP (SAUDI ELECTICITY COMPANY). Responsible for the Mechanical over-all Plant Construction, Erection, Testing & Commissioning of 10 X 80 MW simple cycle Gas Turbine Generators of SIEMEINS MAKE (STGT6- 2000E), 2 UNITS STEAM TURBINE SIEMENS and 10HRSG along the BOP with its accessories for water Treatment Plant, Cooling water System, Water Pump-House, closed cooling water system, Demineralization water plant,, and Diesel Fuel tank Yard as well Crude Oil Storage Tank Yard with capacity of 75,000 M 3. The plant composed of Balance of plant equipment such as Air compressors (service air & instrument air), Crude Oil Treatment Plant, and Water conversion from sea water to useful cooling water for power plant supplied.Job Description:• Supervision & control of construction works in respect of drawing, design and work schedule (gas turbine – steam turbine -HRSG, boiler and auxiliaries).• Review all the P&ID’s drawing for proper inspection as requested by the EPC QA/QC discipline.• Attended all the RFI –Request for Inspection raised by the contractors for all mechanical works.• Prepare the punch list that is not compliance from the SEC PTS requirements.• Attended/witnesses all the test and commissioning activities as per RFI issued.• Prepare and submit reports to my Lead Engineer if found unacceptable that are inspected for EPC action.• Coordinate with EPC discipline to resolve some of the pending issues.• Inspected/Witnessed the hydro test/commissioning of all mechanical works as required.• Submit technical reports to my Lead Engineer at least in daily basis for every rejected RFI issues along with photos.• Coordinate with my colleague for everyday outcome of our observation/inspection for proper work planning schedule to be carried out. :
PROJECT: YANBU POWER AND DESALINATION PLANT – PHASE3. [Power plant 620MWX5 UNIT – 3,100MW] -- 550,000m³ / day or 121 million imperial Gallons per day (MIGD) of desalinated water, which will be enough to meet the daily water requirements of approximately 1.8 million people. CLIENT : SWCC (Saline Water Conversion Corporation)[ 1/ May 2015 TO Till Date]MECHANICAL Engineer &QA/QC WELDING
Shoaiba Ii Ccpp --Saudi Electricity Company
Responsibility includes the following activities: 1.Supervising the construction of Gas Turbines, Approval of all installation work protocols, witnessing & supervising the commissioning and operation activities and participate in performance test evolution and approval.. 2Coordinating with Gas turbine and Water Treatment Plant contractors to implement the contract specifications and requirements and to ensure that the contractors are working to meet Project Mile - stone deadlines. 3.Assuring that the contractors are working to the latest revisions of drawings, providing Technical assistance to the construction supervision engineers to ensure that all mechanical equipments are installed according to the approved codes and standards, inspection and reviewing the supplied materials and approving the material receiving reports. From 25/10/2006 to 1/12/2011 - Saudi Electricity Company (southern operating area : Generation Technical Support ( Generation projects execution division (extension of Sharourah Power Plant by 51 MW Gas Turbine Generation Units 1, 2 & 3)-----Quality & Performance Section). From 1/6/2004 to 5/9/2006 - Supervision Engineer for PGESCO – Power Generation and Engineering Services Company and it is the branch of Bechtel Overseas Corporation in Egypt & supported by Bechtel staff. Description of the work : Site Engineer of Nubaria Combined Cycle Power Plant, The Plant Comprising of 2 modules, each containing two Gas Turbine Generators of 250MW each manufactured by M/s. Siemens (Germany), two Heat Recovery Steam Generators manufactured by M/s. ALSTOM (France), one 250MW Condensate Steam Turbine manufactured by M/s. Mitsubishi Heavy Industries, Japan. The plant includes Balance of plant equipment such as Circulating Water Pump-House, Service water, closed cooling water pump House, Air compressors and Water Treatment facilities.
Other employees you can reach at fichtner.de. View company contacts for 1107 employees →
Karsten Schrader
Colleague at Fichtner Consulting EngineersBerlin Metropolitan Area, Germany
View →
SW
Steffen Wolff
Colleague at Fichtner Consulting EngineersStuttgart, Baden-Württemberg, Germany
View →
MG
Mary Gopalakrishnan
Colleague at Fichtner Consulting EngineersBengaluru, Karnataka, India
View →
AA
A.Nil Acharya
Colleague at Fichtner Consulting EngineersThane, Maharashtra, India
View →
JE
Jacky Etienne
Colleague at Fichtner Consulting EngineersUnited States
View →
CS
Colina Smith
Colleague at Fichtner Consulting EngineersGermany
View →
AS
Aman Shrivastava
Colleague at Fichtner Consulting EngineersNew Delhi, Delhi, India
View →
MT
Mkrtich Tadevosyan
Colleague at Fichtner Consulting EngineersArmenia
View →
SK
Smail Kapetanovic
Colleague at Fichtner Consulting EngineersUnited States
View →
KL
Karl-Joachim Linder
Colleague at Fichtner Consulting EngineersStuttgart Region, Germany
View →
Quick answers generated from the profile data available on this page.
Beshri Kamel works for Fichtner Consulting Engineers.
Beshri Kamel is listed as Mechanical Engineer at Fichtner Consulting Engineers.
Beshri Kamel is based in Saudi Arabia while working with Fichtner Consulting Engineers.
Beshri Kamel has worked for Fichtner Consulting Engineers, Fichtner Gmbh & Co. Kg, and Poyry.
Beshri Kamel's colleagues at Fichtner Consulting Engineers include Karsten Schrader, Steffen Wolff, Mary Gopalakrishnan, A.Nil Acharya, and Jacky Etienne.
You can use AeroLeads to view verified contact signals for Beshri Kamel at Fichtner Consulting Engineers, including work email, phone, and LinkedIn data when available.
Beshri Kamel holds Bachelor Of Engineering (B.E.), Mechanical Engineering from B.Sc. Mechanical Engineering.
Beshri Kamel is listed with skills including Engineering, Embedded Systems, Manufacturing, Electronics, Power Generation, Electrical Engineering, Inspection, and Commissioning.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial Search contactsCheck these profiles if this is not the Beshri Kamel you were looking for.