AeroLeads people directory · profile

Bin Ma Email & Phone Number

Senior Project Engineer at BESIX at BESIX
Location: United Arab Emirates 8 work roles
LinkedIn matched
✓ Verified July 2026 2 data sources Profile completeness 71%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Project Engineer at BESIX
Location
United Arab Emirates
Company size

Who is Bin Ma? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Bin Ma is listed as Senior Project Engineer at BESIX at BESIX, a with 2585 employees, based in United Arab Emirates. AeroLeads shows a matched LinkedIn profile for Bin Ma.

Bin Ma previously worked as PROJECT ENGINEER at Six Construct Llc and Project Engineer at Six Construct Llc.

Company email context

Email format at BESIX

This section adds company-level context without repeating Bin Ma's masked contact details.

BESIX

Review company-level records connected to Bin Ma before choosing the right outreach path.

Profile bio

About Bin Ma

Bin Ma is a Senior Project Engineer at BESIX at BESIX.

Current workplace

Bin Ma's current company

Company context helps verify the profile and gives searchers a useful next step.

BESIX
Besix
Senior Project Engineer at BESIX
brussels, brussels hoofdstedelijk gewest, belgium
Website
Employees
2585
AeroLeads page
8 roles

Bin Ma work experience

A career timeline built from the work history available for this profile.

Project Engineer

Current
Six Construct Llc
May 2007 - Present

Project Engineer

Six Construct Llc

Qatar

The project consists of roadway improvements for an approximately 4-kilometer corridor of the existing thoroughfare along Al Rayyan Road between Al Wajbah Street and Al Diwan Street. It consists of 2 underpasses, 3 power cable tunnels, 6 substations, 13 micro-tunnel shafts, etc.

Feb 2014 - Nov 2014

Project Engineer

Six Construct Llc

Uae

This project is the office tower for ADNOC with 2B+G+75. Total area is 2,045,143 SQFT. Total height of the tower is 343m- Helipad level. The highest Floor level is 300 m. The structure of this tower is Core with Shell .The post tensioning slabs are applied for all the floor slabs. The Outrigger wall are located at level 20, level 34, level 49 to increase the stiffener of the Tower. Mechanical floor arte also located at level 20, level 34, level 49. PERI-ACS system are used for the form work of the core wall.

Apr 2011 - Feb 2014

Project Engineer

Six Construct Llc

Uae

Cleveland Clinic, Abu Dhabi (CCAD) is a 21 storey high-end hospital. This building consists of Center Utility Plant-CUP, Clinic, Diagnosis & Treatment ( D& T) , Patient Tower, ICU & SWING , Gallary, Parking Garage, etc. CUP & Parking Garage is full Post-tensioning slab, other structure are metal deck & concrete topping.

May 2010 - Apr 2011

Project Engineer

Six Construct Llc

Uae

This project is designed to have the waste water treatment capacity of 430,000 m3 per day enough to serve 1.5 million people. It contains W10-Inlet Work, W20-Pre Treatment, W30- Buffer Tanks, W40-Primary Lamellar Settlars, W50-Activated Sludge Tanks, W55-Air Production, W60-Deareator/ Splitter, W70-Clarifiers, W80- Granular Medium Filters, S10-Sludge thickening, S20- Primary Digesters, S30- Secondary Digesters, S40- Drying Beds, S50- Gas Holder, S60- Gas Flare, C10-Odour Control, C20- Hypochlorite Production, 5 Substations, and Administration buildings.

Feb 2009 - Apr 2010

Project Engineer

Six Construct Llc

Uae

Civil Works Details: Ferrari Theme Park: The biggest indoor Theme Park in the world covering 300m x 300 m area with three cast-in-situ floors-ground, Mezzanine, Plaza; Large steel structural Roof slab& Facade; 4 pre-cast Car Parks, etc.  Shahama Sadiyat Freeway : 20 Post-Tensioned Bridges , 68 K.L. Highway

Dec 2007 - Feb 2009

Project Engineer

Six Construct Llc

Uae

The project includes the construction of new seven lane dual carriageway Replacement Bridge over the Dubai Creek. The new Bridge consists of twin decks to support the North Bound Deira and South Bound Bur Dubai carriageways. The span configuration of the new bridge is 60+80x5+60 meters resulting in an overall length of 520 meters. Each deck consists of post-tensioned varying depth concrete box girder with an overall width of 35.4 meters to support seven traffic lanes and a 3.0 m wide pedestrian walkway at outer edge.

May 2007 - Dec 2007

Senior Project Engineer

Current

Dubai, United Arab Emirates

May 2007 - Present
Team & coworkers

Colleagues at BESIX

Other employees you can reach at besix.com. View company contacts for 2585 employees →

FAQ

Frequently asked questions about Bin Ma

Quick answers generated from the profile data available on this page.

What company does Bin Ma work for?

Bin Ma works for BESIX.

What is Bin Ma's role at BESIX?

Bin Ma is listed as Senior Project Engineer at BESIX at BESIX.

Where is Bin Ma based?

Bin Ma is based in United Arab Emirates while working with BESIX.

What companies has Bin Ma worked for?

Bin Ma has worked for Six Construct Llc and Besix.

Who are Bin Ma's colleagues at BESIX?

Bin Ma's colleagues at BESIX include Yenefoli Silue, Tahir Naeem, Azmatullah Mohammed, Raveen Dsouza, and Philip Skariachan.

How can I contact Bin Ma?

You can use AeroLeads to view verified contact signals for Bin Ma at BESIX, including work email, phone, and LinkedIn data when available.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Bin Ma you were looking for.

View similar profiles