Extensive and varied experience in the field of civil engineering design. Have designed a multitude of projects, including roads, highways, railroad facilities, utilities, drainage appurtenances, sanitary sewers, water systems, plant site facilities and grading plans. In addition, I have a background in drafting support for civil engineering operations, and understand and can coordinate C.A.D.D. support services. I have supervised the efforts of other designers and draftsman on certain projects, and understand the importance of planning, organizing, directing, and controlling a design team.
Retired
-
Major RetiredRetired Jan 2020 - Present
-
Sr. Civil DesignerTsiouvaras Simmons Holderness, Inc. Aug 2014 - Present5690 Dtc Blvd, Suite 345W, Greenwood Village, Co 80111Responsibilities include the CADD of highways, utilities, bridges, traffic and hydraulic appurtenances. Representative clients are the Colorado Department of Transportation, local cities, counties, municipal districts, transit agencies and airports.
-
Sr. Civil DesignerCh2M Hill 2011 - 2014INTREPID POTASH-NEW MEXICO LLC, HB Process Plant Project, Carlsbad, New Mexico USAThe project consisted of two major facilities. The HB Flotation Mill Site and the Dump and Reclaim Facility. Responsibilities for the project on both facilities was site layout grading and drainage. The project included a fire water main and loop from the tank storage to both facilities. An On-site sewerage disposal system was also designed. The many pipeline corridors designed included slurry, brine water… Show more INTREPID POTASH-NEW MEXICO LLC, HB Process Plant Project, Carlsbad, New Mexico USAThe project consisted of two major facilities. The HB Flotation Mill Site and the Dump and Reclaim Facility. Responsibilities for the project on both facilities was site layout grading and drainage. The project included a fire water main and loop from the tank storage to both facilities. An On-site sewerage disposal system was also designed. The many pipeline corridors designed included slurry, brine water, tailings and process water.SILVER STAR OPERATIONS LLC, Revenue-Virginius Mine—Ouray, Colorado, USASenior Civil Designer for a 300 ton per day silver Mine. Coordinated civil site work for above ground and underground mine systems.FMC CORPORATION—Westvaco, Wyoming, USASenior Civil Designer on a milled trona facility project for the FMC Corporation, with a scope encompassing engineering, design, and draft work. Responsibilities included final design of access roads, mill, loading silo, and beneficiation process facilities, and utilities (gas, potable water, firewater, and storm sewer systems).CLIMAX—Freemont Pass, Colorado, USASenior Civil Designer on water treatment plant project, with a scope encompassing engineering, design, and drafting. Responsibilities included final design of access roads, Water treatment process facility, final grading and drainage, excavation plans, erosion and sediment control, storm water pond, events pond, utilities routing (firewater, sanitary sewer and storm sewer systems). Show less -
Sr. Civil DesignerUrs Corporation 2007 - 2011Western Lithium Corporation, King’s Valley Lithium Project, Humbolt County, Nevada Prepared all civil related documents and deliverables. General design features include site grading, storm drainage/pond, storm water management/Best Management Practices (BMPs), erosion and sediment control, underground utilities, vehicular circulation and surfaces for staging or parking areas. The layout included items such as a plant access road, inter-plant roadway networks, haul roads, tailings… Show more Western Lithium Corporation, King’s Valley Lithium Project, Humbolt County, Nevada Prepared all civil related documents and deliverables. General design features include site grading, storm drainage/pond, storm water management/Best Management Practices (BMPs), erosion and sediment control, underground utilities, vehicular circulation and surfaces for staging or parking areas. The layout included items such as a plant access road, inter-plant roadway networks, haul roads, tailings storage/impoundments, truck maintenance shop, fuel storage area, open pit mine, waste rock dump pad, and lithium process type facilities with related equipment. Various Projects, ExxonMobil, LaBarge Shute Creek facility in Wyoming Responsibilities included civil designs for access roads, SCR, selective catalytic reactor, and cross country pipelines. Work included grading, drainage and ammonia storage containment facility. ADCO 1.8 bpd Project, Abu Dhabi Company for Onshore Oil Operations (ADCO). United Arab Emirates of Abu Dhabi: Prepare FEED for Qusahwira, Bab and northeast Bab fields. Responsible for grading and drainage for process facilities, Work included material take-off, containment and storm water ponds and drainage study. NorthMet Project, PolyMet Mining Corp. EPCM of a copper mine. Responsibilities included preliminary design of access roads, Floatation pad, Hydromet Facility, SX-EW process facilities, process and storm water ponds and drainage report. Show less -
Sr. Civil DesignerSamuel Engineering 2005 - 2007Alumina Copper- Northern Peru Copper, El Galeno Project, Cajamarcha, Peru, S.A. For Pre-feasibility Study of a copper mine. Responsibilities included preliminary design of access roads, crusher pad, conveyor alignment, plant site process facilities, thickener pad, process and fresh water ponds and water pipeline with booster pump stations.Formation Capital Corporation, Idaho Cobalt Project, Idaho, U.S.A. Senior Civil Designer for the preparation of a preliminary engineering and… Show more Alumina Copper- Northern Peru Copper, El Galeno Project, Cajamarcha, Peru, S.A. For Pre-feasibility Study of a copper mine. Responsibilities included preliminary design of access roads, crusher pad, conveyor alignment, plant site process facilities, thickener pad, process and fresh water ponds and water pipeline with booster pump stations.Formation Capital Corporation, Idaho Cobalt Project, Idaho, U.S.A. Senior Civil Designer for the preparation of a preliminary engineering and feasibility study level cost estimate for a high grade primary cobalt deposit unique to North America, located near Salmon, Idaho, with a design production rate of 1,500 tonnes of super-alloy grade cobalt metal and cobalt chemicals per year. The project consists of a grass roots 800 tpd concentrator and a hydrometallurgical refinery major expansion with product output representing the equivalent of 3.3% of global cobalt supply.Bureau of Reclamation, Santa Ana Dam, Santa Ana Indian Reservation, New Mexico, U.S.A. Civil Designer involved in the rehabilitation of an existing flood control dam, project included plan and profile drawings and details for a new 6000 foot long dam with RCC emergency spillway and improved drainage channel to drainage basin.River Clay, Multi Family and Commercial Space Mixed-Use Development Project Denver, Colorado, U.S.A. Civil Designer work included drainage report and drainage design of an underground detention system, site grading and surface drainage, new curb and gutter with sidewalk, roadway improvements and utility design and coordination with local utility companies.Anadarko Petroleum Corporation (Kerr McGee), Greater Natural Buttes Processing Plant, Vernal, Utah, U.S.A. Senior Civil Designer for a new 138 kV substation for a natural gas processing facility.XTO Huntington and Orangeville Gas Compressor Stations, Utah, U.S.A. Lead Civil Designer responsible for site grading and drainage, access roads, and underground utilities Show less
-
Sr Civil DesignerJacobs Sverdrup 2001 - 2005• 78th Avenue Roadway Improvements, Denver International Airport/City and County of Denver Design of improvements along 78th Avenue at DIA, including widening to a four-lane roadway • I-25 Southeast Corridor Reconstruction (T-REX Project), CDOT – “Design Build”; Denver, CO Utility manager for Segment 1.1, known as “the Narrows”. Services on the project included design of interstate highway, drainage, utilities relocation, signals, signing, striping, two complex braided ramps… Show more • 78th Avenue Roadway Improvements, Denver International Airport/City and County of Denver Design of improvements along 78th Avenue at DIA, including widening to a four-lane roadway • I-25 Southeast Corridor Reconstruction (T-REX Project), CDOT – “Design Build”; Denver, CO Utility manager for Segment 1.1, known as “the Narrows”. Services on the project included design of interstate highway, drainage, utilities relocation, signals, signing, striping, two complex braided ramps, frontage roads, CD roads, lighting, and construction phasing MHT, urban design, landscaping, and irrigation. As utility manager, responsible for relocating more than 150 complex utility systems for this segment. Several utilities were designed in bridges. Tunneling/directional drilling (boring and jacking) with casing was completed for a 36” water conduit and major fiber-optic line. Responsibilities included coordinating and implementing individual utility standards, along with the design of utility systems that included water conduits 24” and up, water distribution lines, gas, electric, telephone, cable television, drainage, irrigation, 911 lines, and fiber optic lines (including NORAD).• Southbound Buchtel Parkway Improvements, City and County of Denver, CO Conceptual, preliminary, and final design of 1.1 miles of Buchtel Boulevard from Logan Street to High Street along I-25 in Denver.• Suncor Odyssey Project, Denver Refinery, Suncor Energy; Commerce City, CO Design of perimeter access road with drainage structures and utility corridor routing. Also prepared new design for petrochemical storm sewer system for Gasoil HDS area, Unit 17, and design of tank farm containment dike for Tank T-774.• Zone 4 Mining Conveyor Route, Zarafshan-Newmont Joint Venture; Zarafshan, Uzbekistan Senior civil designer for this project, routing a 2200-meter-long mining conveyor. Show less
-
Sr. Civil Designer (Mining & Metals)Bechtel Corporation 1994 - 2001• SX-EW copper plant facilities: Particular attention was given to process gravity systems and material handling equipment. Developed an interconnecting roadway system between the Plant Site, Leach Pad and the Oxide Tailings Disposal area. The Project consisted of: Solvent Extraction Settlers; Electrowinning Bldg.; Tank Farm; Acid Storage Containment; On-Off Leach Pad; Primary and Secondary Crushers; Counter Current Decant System; Acid Plant w/ Sulfur Storage and Water Storage Tanks. The… Show more • SX-EW copper plant facilities: Particular attention was given to process gravity systems and material handling equipment. Developed an interconnecting roadway system between the Plant Site, Leach Pad and the Oxide Tailings Disposal area. The Project consisted of: Solvent Extraction Settlers; Electrowinning Bldg.; Tank Farm; Acid Storage Containment; On-Off Leach Pad; Primary and Secondary Crushers; Counter Current Decant System; Acid Plant w/ Sulfur Storage and Water Storage Tanks. The Project was completed and 3D modeled by using "InRoads" and “Microstation” software.• Crushing Facility and Conveyor Corridor w/ Drive ends. Developed overall site grading. Designed Underground utilities (water and sewer) and an above ground cross country water line. Designed a 20 ft. high Geogrid retaining wall. I extracted plan and profile drawings using "InRoads" and “Microstation” software.• Gold Plant Facilities: Site grading and earthwork balance for facility, that included storage ponds, fire water loop, drain line system, sanitary sewer line, EWT lines, raw waterlines, treated water lines, well lines and tailings Impoundment. The Project was concluded by the use of "InRoads" and “Microstation” software.• Dabhol Phase II Power Project India. (Gaithersburg/Fredrick, Maryland Office Assignment) Solely designed and modeled the entire civil site development effort. Work included grading and underground utilities, including circulating water for two 800-mw-power blocks. Prepared drawings and wrote a detailed Hydrology report with calculations. Prepared earthwork take-off. Designed and CAD modeled the existing plant and expansion using InRoads. The plant facilities included a switchyard, Power blocks, cooling towers, haul road realignment and chilled equipment/water treatment areas. Due to increased runoff I designed a storm water detention pond with spillway to handle the two annual monsoons that occur in the region. Show less -
Lead DesignerUnited Engineers Formerly Stearns Roger 1980 - 1994• Power: Designed storm drain systems for cogeneration projects and prepared a comprehensive drainage studies for the projects, which were reviewed and accepted by the local governmental authorities. (Intergraph software).• Petroleum & Petrochemical: Gas Plants; Designed site grading and earthwork balance for gas plant facilities that included storage ponds and tank farm containments using AutoCAD software. Experienced in North Slope Petroleum Projects. Design of module/drill site access… Show more • Power: Designed storm drain systems for cogeneration projects and prepared a comprehensive drainage studies for the projects, which were reviewed and accepted by the local governmental authorities. (Intergraph software).• Petroleum & Petrochemical: Gas Plants; Designed site grading and earthwork balance for gas plant facilities that included storage ponds and tank farm containments using AutoCAD software. Experienced in North Slope Petroleum Projects. Design of module/drill site access roads, drill sites, methanol and central plant facility pads using both AutoCAD and Intergraph software; Oil Shale; 10,000 B/D Plant, Parachute CO.• Roadways: As part of a design team, designed an eighteen-mile stretch of county road including horizontal and vertical alignment, drainage and traffic control. • Government/Military: Department of Energy Projects; Space Launch Complex’s, Vandenberg AFB and Cape Canaveral; Designs included grading and drainage; earthwork; and an interconnecting roadway systems.• Mining: Copper Project: Underground room & pillar ore reserve project, White Pines, Michigan. Show less
-
Civil Designer/DrafterCentennial Engineering, Inc. 1978 - 1980Broadened experience in infrastructure and municipal projects. Representative projects include: Major street improvements; Floodplain studies; Traffic improvements; Sanitary sewers; Storm drainage and Planned unit developments. Performed design, manual drafting, plan checking, surveying and inspection on projects -
Military Mos 81-B20 Construction DraftsmanUs Army Corps Of Engineers 1970 - 1972Vietnam Veteran
Bob Gorecki Skills
Bob Gorecki Education Details
Frequently Asked Questions about Bob Gorecki
What company does Bob Gorecki work for?
Bob Gorecki works for Retired
What is Bob Gorecki's role at the current company?
Bob Gorecki's current role is RETIRED.
What is Bob Gorecki's email address?
Bob Gorecki's email address is bo****@****ing.com
What schools did Bob Gorecki attend?
Bob Gorecki attended Harper College, University Of Colorado Denver.
What skills is Bob Gorecki known for?
Bob Gorecki has skills like Civil Engineering, Microstation, Road, Water, Drainage, Engineering, Mining, Energy, Cad, Petrochemical, Sewer, Earthworks.
Not the Bob Gorecki you were looking for?
-
Robert Daniel Gorecki
Life Is Energy! Energy Is Life! Massage/Health/Wellness - Luxury/Leisure ProfessionGreater Chicago Area -
-
-
2deloitte.com, bni.com
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial