Bobby Han work email
- Valid
Bobby Han personal email
Civil, Architecture, Structure Steel, MEP, Febrication and Erection of Machinary, Survey, Planning, Designing, Scheduling, PERT, Q/A, Q/C, Q/S, Safety, Environmental protection, Interfacing, Procurement, Tunneling, Febrication/Errection of Concreted/Steel Bridges, Febrication and Errection of Container Craning, Railing work, Management of High Speed Rail Way works, Management for Construction of Seaport and Airport, Management of Greenhouse with Solar system, Management /Designing for Solar Power plant/Fire Power Plant/Thermal Power plant/Hydraulic Power Plant/Subterrarean Power Plant/Renewable Power Plant, Cement Plant, Steel Plant, Mining management, Oil $ Gas Mining management, Damming work, Sea work, Land Development, Method Statement for evry item, Inspection paper work, Commissioning, Calibration, Project Management, Business management, Crissis Management, Engineering Sales management, Business Develop Management, ...etc..Second Expertise: ferro and non-ferro materials.
Self-Employed
-
Project ManagerSelf-Employed Jun 2017 - PresentBejing, Shanghai, Lanzhou City, Quezhou City In China
-
Senior Engineering Technoligy, Sales & R/D ConsultantZhong Long Construction & Engineering Co.,Ltd. Oct 2016 - PresentYinkou City, Liaoning Province China1. To be responsible to every cases in China with Sales sept. 2. To support the Sales sept. with all the technology of Enginering/Construction/Structture Steel/MEP3. To support the Best/Special/Low Cost/The Fastest way/Green Arti. Method Statement for sales dept . to get 4 cases.4. To be responsible to design the device in accordance with my method statement to Engineering dept. to comence the job.5. To support the Engineering dept. to complish the QA Plan, Safety Plan.
-
Mananging DirectorGolden Vista International Developement Corp. Jan 2013 - May 2015Taoyuan County, Taiwan
-
Project ManagerGuehua Construction Company Jan 2012 - May 2012TaidongTaidong College new 4 buildings project.There are 4 buildings must make the big modification and a lot of paper work which have to be finished before end of June. I made quick accomplishment of a lot of works. It is finished by end of May. A lot of paper works, such as self checking lists for Architecture and MEP. Scheduling and a lot of modifications.
-
Project DirectorVsap Builders Holding Corp. Jul 2007 - Nov 2010Hong KongProject director of the project of Thermal Power Plant and land development in Lanzhou GanSu province in China.
-
Project ManagerDa Jang Zhou Industry Co., Ltd. May 2005 - Apr 2007Kaoxiong CountyTaiwan Power Company Xingda Power Plant, Connecting steel bridge (2.1 Km long) with the coal storage and habor oversea. There are 38 sets of girders. Each one is welding assembled by 20 pieces, like making a ship.
-
Construction ManagerTaiwan High Speed Rail Aug 2001 - Sep 2005Construction manager for Civil work, Train Station and Main Maintenance Shop of Taiwan High Speed Rail Co. Ltd., encharge: 105 method statements, scheduleing for civil, structure steel, electricity,piping, railing, piling, buildings, Siding, fabrication and erection of turn table for Trains, guiding bridge, fans, piping for water, piping for gasline(HDPE), Conduiting, roads..etc.
-
G.M. Of Engineering Dept. For Petrochemical Industrial Area(3000 Hectares)Zheng Jeng Steel Factory Co., Ltd. Mar 1994 - Jun 2000Chiayi TaiwanThis is the biggest project invested by "Formosa Petrochemical Co. Ltd.," in Taiwan. I'm the General Manage of Engineering Dept. of Zheng Jeng Steel Factory Company. The project includes; dredging work for the land if 3000 hectares, Seaport build-up, Connecting Steel Bridge, warehouse, Fire Power Plant, Tanks, Piping works, Erection of Machinaries, Road Paving, Intake piping(dia. 4.1 m) work, intake head for Fire Power Plant. Silo(240m) X 4, Landscape, Steel Pipe Piles. For years, From nothing to accomplishment of the whole industrial Area.
-
Project Director Of Stailess Steel PlantYeh Long Group Apr 1991 - Apr 1993Kaoxiong CountyTo build up a new Stainless Steel Plant including 6 production line, Budge: USD1B
-
Project Manager Of Linkou Fire Power PlantYeh Long Group May 1991 - Mar 1992
Bobby Han Skills
Bobby Han Education Details
-
Civil & Physics & Business Affairs -
Physics And Civil Departments
Frequently Asked Questions about Bobby Han
What company does Bobby Han work for?
Bobby Han works for Self-Employed
What is Bobby Han's role at the current company?
Bobby Han's current role is Project Director of VSAP Builders, Construction & Development Corp..
What is Bobby Han's email address?
Bobby Han's email address is a8****@****.com.tw
What schools did Bobby Han attend?
Bobby Han attended Tamkang University, Tamkang University.
What skills is Bobby Han known for?
Bobby Han has skills like Construction, Civil, Primavera P6, Construction Management, Cost Estimating, Cost Control, Project Planning, Contract Management, Scheduling, Ms Project, Cost, Procurement.
Not the Bobby Han you were looking for?
-
1ut.edu
-
1msn.cn
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial