Bobby Mccracken

Bobby Mccracken Email and Phone Number

Engineering | Project Management | Facility Planning | Budget Management | Process Modeling | Facility Optimization @ Enduring Resources, LLC
Bobby Mccracken's Location
Denver, Colorado, United States, United States
Bobby Mccracken's Contact Details
About Bobby Mccracken

A forward-thinking and dedicated engineer with extensive experience in the energy industry. Additionalstrengths in project management, facility planning, budget management/cost control, business development, process modeling, and facility optimization. Makes effective design decisions driven by safety, economics, and operability. Adaptable and positive personality. Works efficiently throughout multiple levels inside and outside of an organization while motivating team members to exceed expectations.

Bobby Mccracken's Current Company Details
Enduring Resources, LLC

Enduring Resources, Llc

View
Engineering | Project Management | Facility Planning | Budget Management | Process Modeling | Facility Optimization
Bobby Mccracken Work Experience Details
  • Enduring Resources, Llc
    Facilities Engineer
    Enduring Resources, Llc 2020 - Present
    Denver, Colorado, Us
  • Jagged Peak Energy
    Senior Facilities & Infrastructure Engineer
    Jagged Peak Energy 2018 - 2020
    Denver, Colorado, Us
    Managed facility and infrastructure projects/budgets, increased facility safety/environmental standards while optimizing designs, forecasting production and process modeling existing systems to find and resolve choke points for future development.Facilities Program: Worked in conjunction with team to manage facilities development and budget. Planned out facility completion from fluid drill schedule. Reduced cost per well by average of 12% over 2019 fiscal year while increasing facility safety standards and gas capture. - Reviewed third-party consulting designs for facilities. Implemented P&ID documentation into field and facilitated use. Collaborated with construction and operations to improve and optimize designs. - Worked closely with land and regulatory teams to combine multiple well leases where feasible to increase capital efficiency. Infrastructure Program: Managed infrastructure budget of $33,000,000 for various power distribution, salt water pipeline/disposal, and fresh water pipeline projects. Implemented AFE development to provide accurate accruals for overall spend. - Forecasted power supply, salt water takeaway capacity, and fresh water supply. Worked in conjunction with team to ensure appropriate infrastructure projects in place to keep up with development plan. - Retrofitted and designed new SWD/water transfer-handling facilities to increase water takeaway/transfer capacities. Increased SWD utilization by 20% with new pipeline and facility installations. - Managed 50MW substation project to increase power reliability in field, requiring design and material approvals in addition to consistent communication with utility and third-party engineering/construction to achieve accelerated project timeline. - Managed recycle and fresh water use for frac jobs throughout the field. Collaborated with field team to determine most suitable water transfer routes and potential use for recycle water in job.
  • Halker Consulting Llc.
    Process Engineer
    Halker Consulting Llc. 2012 - 2018
    Centennial, Colorado, Us
    Responsible for P&ID development of various wellpad facility standard designs. Completed process modeling (VMG or HYSYS), line sizing, vessel sizing, vessel specification, reviewing vendor quotations and control valve sizing. Provided conditions of service for various instruments and pieces of equipment.Assisted in three optimization studies for transmix facilities as well as several PSV studies. - Tansmix facility optimization: set up the HYSYS model based on current operating conditions and determined what changes in operating conditions would optimize production. - PSV studies: gathered field data and coordinated work with a team of 1-5 engineers. Project management and project engineering: Coordinated project completion, created project schedules, managed internal resources and reviewed/approved documents prior to client transmittal.
  • Colorado School Of Mines
    Research Associate, Chemical & Biological Engineering Department
    Colorado School Of Mines 2012 - 2012
    Golden, Co, Us
    Producing a scintillator made of a polystyrene and PPO/POPOP mixture. Scintillator is produced using an extruder and proper parameters are experimentally determined to produce a clear material. Scintillator is tested against a cast sample. Side projects: computer restoration (required the use of MS-DOS programming) and load cell testing (required the use of reading wire diagrams).
  • Polynew Inc
    Intern
    Polynew Inc 2011 - 2012
    The goal of this research facility is to produce bioplastics that are able to be frozen and heated without shattering or melting, respectively.For this company I did the following:• Produced cellulosic nanowhiskers utilized within bioplastic production• Determined the most suitable procedure to maximize the nanowhisker yield from experimental processes• Revised the standard operating procedure for nanowhisker productionHowever, during my work, I also was taught how to use various machines, such as: Differential Scanning Calorimeter (DSC), Dynamic Mechanical Analyzer (DMA), Inferred Spectroscopy (IR), and Forman Press Injection Molding
  • Colorado School Of Mines
    Research Assistant, Chemistry Department
    Colorado School Of Mines 2010 - 2010
    Golden, Co, Us
    As an assistant, I worked under a graduate student. Her main goal was to produce algae or cyanobateria that would produce alkanes by utilizing carbon dioxide, sunlight, and water. In order to produce such organisms, many transgenic techniques were used.My responsibilities included:• Using Polymerase Chain Reaction (PCR) to amplify gene sequences used for gel-electrophoresis• Performing transgenic plasmids transfers using electroporation• Performing lipid extraction on algae• Producing TAP solution and solid plating for cell culture dishes• Growing liquid cultures of algae with use of cell count

Bobby Mccracken Skills

Chemical Engineering Engineering Microsoft Office P&id Chemistry Data Analysis Thermodynamics Aspen Hysys Aspen Plus Polymers Microsoft Excel Microsoft Word Energy Polymath Solidworks Research Piping And Instrumentation Drawing Spartan Software Research Experience Project Engineering

Bobby Mccracken Education Details

  • Colorado School Of Mines
    Colorado School Of Mines
    Chemical And Biochemical Engineering

Frequently Asked Questions about Bobby Mccracken

What company does Bobby Mccracken work for?

Bobby Mccracken works for Enduring Resources, Llc

What is Bobby Mccracken's role at the current company?

Bobby Mccracken's current role is Engineering | Project Management | Facility Planning | Budget Management | Process Modeling | Facility Optimization.

What is Bobby Mccracken's email address?

Bobby Mccracken's email address is rm****@****nes.edu

What schools did Bobby Mccracken attend?

Bobby Mccracken attended Colorado School Of Mines.

What skills is Bobby Mccracken known for?

Bobby Mccracken has skills like Chemical Engineering, Engineering, Microsoft Office, P&id, Chemistry, Data Analysis, Thermodynamics, Aspen Hysys, Aspen Plus, Polymers, Microsoft Excel, Microsoft Word.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.