Manager, Vver (Russian) Functional Design And Analysis
Greater Pittsburgh Area
• Directed the design team for 4 key elements of a turnkey, $250 million instrumentation and control replacement project for a Russian nuclear power plant under construction. Areas were: functional design of reactor control and limitation systems, specification and procurement of all plant instrumentation, design and supply of chemistry monitoring system, and I&C system startup testing and commissioning.• Drove development of comprehensive I&C project plan (WBS, schedule, scope definition between client and vendor) for the VVER turnkey project described above. Included I&C design and supply, safety analyses, licensing, FSAR re-write and defense before local regulator based on US licensing practices, control room HFE design, control board supply, installation design, commissioning, interface with Russian plant designers, and management of installation craft.• Successfully negotiated cost-effective design changes that improved quality, reduced costs, and lessened design cycle time by 30%, despite internal company resistance and by the customer to changes in expensive Russian design plans and with an unfamiliarity of alternative Western technology.