Industrial Engineer Ii
Current• Project Management - Acting IE PM for two process modules across three sites focused on equipment installation planning, factory layout design, and process flow to enable high factory performance on time and under budget• Equipment Installation Planning - Planned for and executed over 100 equipment installations and relocations from a capacity/capability need identification all the way through production release. This includes developing and owning the overall project plan in MS Project while engaging over a half dozen functional groups and facing shifting priorities• Factory Layout Design - Created and modified manufacturing layouts for the world’s largest 200mm silicon carbide materials factory by incorporating OEM equipment drawings with move-in-move-out paths, first of a kind automated systems, and all furniture, fixture, and equipment (FF&E) needs in AutoCAD• Process Flow - Met with multiple technical groups throughout Wolfspeed, the architectural firm, and other parties to help standardize new and existing processes during a large expansion effort such as the FF&E process, Tool Relocation Approval Form, and Building Information Modeling (BIM) coordination in Excel and Word