Staking Technician
Current- Designed 30+ miles of distribution line, including 3 miles of double circuit three phase, for multiple cooperatives.
- Inventoried an existing distribution system on Eglin Air Force Base consisting of multiple substations and circuits, both three and single phase. Checked poles for NESC code violations. Entered data into software.
- Inspected a private distribution line for Cox, Inc. that connected the New River Clean Energy Facility to AEP’s electric system.