Vice President
CurrentCurrently serves as the Project Manager for the design of two segments of the Honolulu light rail project (Airport Segment and City Center Segment). The combined two sections account for over 9 mile of elevated the light rail. The elevated alignment runs from Aloha Stadium, Pearl Harbor, the Honolulu Airport, China Town, downtown and terminates at Ala Moana (adjacent to Waikiki). The project is composed of a segmental viaduct constructed in the span-by-span method. To accommodate the elevated guideway, the design also includes: widening of portions of Kamehameha Highway, Dillingham Blvd and other streets to accommodate the guideway columns; improvements to sidewalks and medians; revise traffic signals; address environmental mitigation concerns, and other related improvements. Twelve stations are located along the alignment; however the design of the stations is not of this contract.Previously, served as the Design Manager on the SH161 project from the proposal phase thru the design phase and into design services during construction. The project was under the authority of the North Texas Tollway Authority (NTTA), and was their first design-build project. SH161 (Phase 4) was a new 415 million dollar, 6.5-mile extension of the President George Bush Tollway located west of Dallas. The extension runs between Interstates 20 and 30. The project has complete direct connector build out connections at both interstate connections. The project has 45 bridges and over a million square feet of retaining walls. The four-lane divided facility is being built between two existing frontage roads.