Brian Wilkinson Email & Phone Number
@plainsmidstream.com
LinkedIn matched
Who is Brian Wilkinson? Overview
A concise factual answer block for searchers comparing this professional profile.
Brian Wilkinson is listed as Construction Supervisor at Plains Midstream Canada, a with 1007 employees, based in Greater Calgary Metropolitan Area, Canada. AeroLeads shows a work email signal at plainsmidstream.com and a matched LinkedIn profile for Brian Wilkinson.
Brian Wilkinson previously worked as Owner's Site Representative & Inspector at Shell Canada Alberta Light Tight Oil (Ab Lto) and Owner's Site Representative/Inspector at Shell. Brian Wilkinson holds Redseal Pipefitter/Class 1 Gasfitter, Steamfitter/Pipefitter, Honours from Red Deer College.
Email format at Plains Midstream Canada
This section adds company-level context without repeating Brian Wilkinson's masked contact details.
AeroLeads found 1 current-domain work email signal for Brian Wilkinson. Compare company email patterns before reaching out.
About Brian Wilkinson
With 21 years of experience in the upstream oil and gas industry, my objective is to work with a team driven company where my knowledge and experience with pipeline, facility, and integrity construction will contribute to the successful, safe, and timely delivery of projects.
Listed skills include Pipelines, Gas, Project Control, Piping, and 33 others.
Brian Wilkinson's current company
Company context helps verify the profile and gives searchers a useful next step.
Brian Wilkinson work experience
A career timeline built from the work history available for this profile.
Owner'S Site Representative & Inspector
Project: 9 PROJECTS (each project value 1M)Responsible for the oversight of the construction and contract adherence of multi-well , liquids rich gas, well pads, this includes: installation of 1 to 8, 400 barrel condensate and produced water tanks, and associated piping (NPS 1 to 8), tie-ins (NPS 3, 6 and 8) and facilities (separator and meter buildings) on pile foundations as part of a catalogue design. The OSR is responsible to the Shell Construction Superintendent for:… Show more Project: 9 PROJECTS (each project value 1M)Responsible for the oversight of the construction and contract adherence of multi-well , liquids rich gas, well pads, this includes: installation of 1 to 8, 400 barrel condensate and produced water tanks, and associated piping (NPS 1 to 8), tie-ins (NPS 3, 6 and 8) and facilities (separator and meter buildings) on pile foundations as part of a catalogue design. The OSR is responsible to the Shell Construction Superintendent for: • All site reporting (daily meetings, pre-construction meetings, etc.), site walk through(s) work planning, cost management, management of change order process, permit generation, adherence to quality contract requirements (e.g. welding completed as per welding procedure, coating, etc.), requests for information (RFI’s) during construction. • Ensure Shell safety management system is being administered as per contract requirements. • Provides leadership for issue resolution during project construction and non-conformance events with construction and personnel. • Facilitate the final construction walk-down prior to hand over to Commissioning and Operations and reviews “AS BUILT” drawings prior to handover. Show less
Owner'S Site Representative/Inspector
Project: CAROLINE SULPHUR DEGAS (value 5-7M)Responsible for the supervision of construction and contract for the installation of a new sulphur degas system in an operating sour gas facility, this included the ground work preparation and testing; decommissioning and demolition of redundant systems to facilitate the new degas system; coordinated the heavy haul requirements and site installation of new degas tank which required the planned temporary disconnection/reconnection of main… Show more Project: CAROLINE SULPHUR DEGAS (value 5-7M)Responsible for the supervision of construction and contract for the installation of a new sulphur degas system in an operating sour gas facility, this included the ground work preparation and testing; decommissioning and demolition of redundant systems to facilitate the new degas system; coordinated the heavy haul requirements and site installation of new degas tank which required the planned temporary disconnection/reconnection of main incinerator supporting structures; fabrication and installation of additional structural steel and piping tie-ins. This project required a large component of scaffolding to complete various construction activities. Show less
Project Manager
Project: KEYERA DILUENT TERMINAL UPGRADE EDMONTON (Value 800,000)Responsible for the management and oversight of contractual obligations for the installation of a new diluent pumping facility in an operating gas plant environment. This included the fabrication, testing and installation of new piping and pumps, Tie ins to the existing facilities decommissioning and demolition of redundant systems to facilitate the pumping and piping system. • Worked as proposal manager with… Show more Project: KEYERA DILUENT TERMINAL UPGRADE EDMONTON (Value 800,000)Responsible for the management and oversight of contractual obligations for the installation of a new diluent pumping facility in an operating gas plant environment. This included the fabrication, testing and installation of new piping and pumps, Tie ins to the existing facilities decommissioning and demolition of redundant systems to facilitate the pumping and piping system. • Worked as proposal manager with estimating team during bid phase• Wrote awards, contracts and letters of intent to suppliers and subcontractors upon award• Attended Kickoff meeting on behalf of TAHK projects• Managed Microsoft Project schedule and sent out updates on bi weekly basis• Managed change management process and identified contractual concerns early• Interfaced with teams from two locations• Wrote and submitted all timesheets for payroll• Produced and published cost reports detailing earned values for all phases of construction to the Client• Facilitated all weekly safety meetings Show less
Owner'S Site Representative/Inspector
Project: CANADIAN GREEN CORRIDOR (Value 800,000)Installed approximately 1200m of NPS 8” Feed Gas Line from TCPL Tie-in to LPG Bullet Area. Modify existing plant pipe racks, Modification of 292 existing pipe supports, 22- Cast-in-place concrete piles, Modification to the vehicle crossover, Installation of the Steam Condensate Water Line.• Liaison with Plant Operations on a daily and weekly basis.• All site reporting (daily meetings, pre-construction meetings, etc.)• Site… Show more Project: CANADIAN GREEN CORRIDOR (Value 800,000)Installed approximately 1200m of NPS 8” Feed Gas Line from TCPL Tie-in to LPG Bullet Area. Modify existing plant pipe racks, Modification of 292 existing pipe supports, 22- Cast-in-place concrete piles, Modification to the vehicle crossover, Installation of the Steam Condensate Water Line.• Liaison with Plant Operations on a daily and weekly basis.• All site reporting (daily meetings, pre-construction meetings, etc.)• Site walk through(s) multiple times throughout the day, every day.• Work planning, cost management, management of change order process, permit generation, • Verified adherence to contract quality requirements (e.g. welding completed as per welding procedure, etc.),Witness and sign off on hydrotesting.• Managed the request for information process (RFI’s) during construction for multi disciplined construction team (i.e. Civil, Mechanical, Electrical, Instrumentation)• Ensure Shell safety management system is being administered as per contract requirements. • Provides leadership for issue resolution during project construction and non-conformance events with construction and personnel. • Facilitated the final construction walk-down prior to hand over to Commissioning and Operations • reviews “AS BUILT” drawings prior to handover. Show less
Owner'S Site Representative/Inspector
Project: CAROLINE C5+ PROJECT (Value 5M)Oversaw the construction and installation of a new condensate treatment facility in the heart of a operating sour gas plant including ground disturbances for civil earthwork and preparation, concrete building foundation, piles. Installation of structural steel, fabrication installation and testing of piping systems, tie ins to the existing facilities piping, new vapour recovery system installed on condensate tanks.• Surveyed, oversaw the… Show more Project: CAROLINE C5+ PROJECT (Value 5M)Oversaw the construction and installation of a new condensate treatment facility in the heart of a operating sour gas plant including ground disturbances for civil earthwork and preparation, concrete building foundation, piles. Installation of structural steel, fabrication installation and testing of piping systems, tie ins to the existing facilities piping, new vapour recovery system installed on condensate tanks.• Surveyed, oversaw the ground disturbance requirements for the new building foundation. • Surveyed and drove steel piles, erected new structural steel.• Worked with engineering firm to identify pipe routing to tie into existing facility. • Modified the existing 50,000 Bbl condensate storage tanks to accept floating roofs. • Acted as prime contractor with multiple contractors and disciplines including civil, mechanical, electrical Instrumentation as well as process specialists and Floating roof contractor. Show less
Project Manager
Project: FEDERATED CO-OP CARSELAND DISTRIBUTION TERMINAL (Value 50 M)Fabricate install and test all Piping from NPS 24 to NPS 1” (approximately 100,000 diameter inches) Fabricate and install all structural steel for the tank farm (Approximately 150,000 Kgs) , (3) 500,000 gallon diesel tanks, (4) 250,000 gallon regular gas , (2) 50,000 gallon premium storage tanks and all associated piping to the loading stations. All piping associated with firewater system, New Firewater pump building… Show more Project: FEDERATED CO-OP CARSELAND DISTRIBUTION TERMINAL (Value 50 M)Fabricate install and test all Piping from NPS 24 to NPS 1” (approximately 100,000 diameter inches) Fabricate and install all structural steel for the tank farm (Approximately 150,000 Kgs) , (3) 500,000 gallon diesel tanks, (4) 250,000 gallon regular gas , (2) 50,000 gallon premium storage tanks and all associated piping to the loading stations. All piping associated with firewater system, New Firewater pump building and foundation, all stairways and platforms to access the tops of the tanks, railcar loading stations. Install containment berms with leak detection liners around each product cell.Worked as the Proposal Manager with the estimating team during bid phase to define the project strategy and establish productivities for the mechanical portion of fabrication and installation. Prepared the preliminary bid schedule for submission with the proposal. This role transitioned to Lead PM upon award of the project. • Wrote awards, contracts and letters of intent to Suppliers and subcontractors• Worked with project controls group to integrate the schedule and budget• Managed the change management process and identified contractual concerns early• Prepared the Construction Execution Plan• Sourced warehouse and workspace and reviewed and approved rental Terms and Conditions• Interviewed and hired key team members including Safety& Quality personnel. Show less
Project Manager
Project: SHELL CLIFFDALE INFRASTRUCTURE GATERHING SYSTEM (Value 32M)Installed 26 km of 6 inch steel pipeline from Cliffdale to The Shell Peace River Complex, 39 km of 8” HDPE and 3” Steel Pipe in a complex gathering system with multiple road crossings using both Horizontal Directional Drill and Open cut techniques. Multiple line crossings for the gathering system. Worked with the estimating team to define and estimate the facilities portion of the work then assigned as… Show more Project: SHELL CLIFFDALE INFRASTRUCTURE GATERHING SYSTEM (Value 32M)Installed 26 km of 6 inch steel pipeline from Cliffdale to The Shell Peace River Complex, 39 km of 8” HDPE and 3” Steel Pipe in a complex gathering system with multiple road crossings using both Horizontal Directional Drill and Open cut techniques. Multiple line crossings for the gathering system. Worked with the estimating team to define and estimate the facilities portion of the work then assigned as project manager upon mobilization to install 65 km of pipeline in multiple stages over two winter pipeline seasons. Assisted Engineering firm to Plan the location and layout of compression/dehydration facility during the summer season.• Responsible and accountable for Project safety quality, cost and schedule performance• Weekly Cost, Safety, Schedule and Quality reporting to both Client (Shell) and Engineering firm• Managed the change management process and identified contractual concerns early• Prepared and submitted Daily Timesheets for manpower and equipment• Updated Progress daily Show less
Colleagues at Plains Midstream Canada
Other employees you can reach at plainsmidstream.com. View company contacts for 1007 employees →
Rena Castonguay
Colleague at Plains Midstream CanadaCanada
View →
DL
Devin Loeppky
Colleague at Plains Midstream CanadaCanada
View →
SF
Stacy Forsberg
Colleague at Plains Midstream CanadaCalgary, Alberta, Canada
View →
MB
Marcel Biette
Colleague at Plains Midstream CanadaEstevan, Saskatchewan, Canada
View →
AB
Allan Buckingham
Colleague at Plains Midstream CanadaCalgary, Alberta, Canada
View →
BO
Bennett Opheim
Colleague at Plains Midstream CanadaOlds, Alberta, Canada
View →
JM
Jamie Marfleet
Colleague at Plains Midstream CanadaCanada
View →
PF
Peter Fazekas
Colleague at Plains Midstream CanadaStrathmore, Alberta, Canada
View →
SF
Shedrack Fubara, Cro, Pmp
Colleague at Plains Midstream CanadaOlds, Alberta, Canada
View →
AK
Andrea Krsmanovic
Colleague at Plains Midstream CanadaCalgary, Alberta, Canada
View →
Brian Wilkinson education
Frequently asked questions about Brian Wilkinson
Quick answers generated from the profile data available on this page.
What company does Brian Wilkinson work for?
Brian Wilkinson works for Plains Midstream Canada.
What is Brian Wilkinson's role at Plains Midstream Canada?
Brian Wilkinson is listed as Construction Supervisor at Plains Midstream Canada.
What is Brian Wilkinson's email address?
AeroLeads has found 1 work email signal at @plainsmidstream.com for Brian Wilkinson at Plains Midstream Canada.
Where is Brian Wilkinson based?
Brian Wilkinson is based in Greater Calgary Metropolitan Area, Canada while working with Plains Midstream Canada.
What companies has Brian Wilkinson worked for?
Brian Wilkinson has worked for Plains Midstream Canada, Shell Canada Alberta Light Tight Oil (Ab Lto), Shell, Tahk Projects Ltd, and Shell Oil Company.
Who are Brian Wilkinson's colleagues at Plains Midstream Canada?
Brian Wilkinson's colleagues at Plains Midstream Canada include Rena Castonguay, Devin Loeppky, Stacy Forsberg, Marcel Biette, and Allan Buckingham.
How can I contact Brian Wilkinson?
You can use AeroLeads to view verified contact signals for Brian Wilkinson at Plains Midstream Canada, including work email, phone, and LinkedIn data when available.
What schools did Brian Wilkinson attend?
Brian Wilkinson holds Redseal Pipefitter/Class 1 Gasfitter, Steamfitter/Pipefitter, Honours from Red Deer College.
What skills is Brian Wilkinson known for?
Brian Wilkinson is listed with skills including Pipelines, Gas, Project Control, Piping, Construction Safety, Petroleum, Petrochemical, and Epc.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Brian Wilkinson you were looking for.
View similar profiles