Construction Manager
Bahrain
Execution of Civil works & Marine works A) Installation of GRP and HDPE Pipe Line (Dia.-2800mm) 2.5 KM Length, including Casting of concrete Ballast & Intake Tower, Welding work of HDPE Pipe line, dredging work of Trench, Sinking work of HDPE Pipe Line.B) Execution of all Civil works (Marine works) of Wharf including - reclamation works, rock revetment, combi-pile wall with capping beam, four-legged mooring dolphin, stone piling, substation, guard room & Immigration… Show more Execution of Civil works & Marine works A) Installation of GRP and HDPE Pipe Line (Dia.-2800mm) 2.5 KM Length, including Casting of concrete Ballast & Intake Tower, Welding work of HDPE Pipe line, dredging work of Trench, Sinking work of HDPE Pipe Line.B) Execution of all Civil works (Marine works) of Wharf including - reclamation works, rock revetment, combi-pile wall with capping beam, four-legged mooring dolphin, stone piling, substation, guard room & Immigration building, fencing etc. c) Dredging work with Marine equipments like dredgers, backhoes, and amphibious excavators to maintain the required depth of the navigation channel and berth pocket.D) Construction of Breakwater using precast concrete blocks, rock armour layer, and geotextile fabric.E) Installation of Navigation Aids like buoys, beacons, and lights to guide the ships safely to the berth.F) Construction of Jetty including piling work, installation of fenders and bollards, and construction of access bridge and gangway.G) Installation of Cathodic Protection System to protect the steel structures from corrosion in the marine environment.H) Construction of Shore Protection Works like revetments, gabion walls, and beach nourishment to protect the shore from erosion and wave action.I) Installation of Marine Fendering System to absorb the energy of the berthing ships and protect the jetty and wharf structures from damage. Show less