Burak Ergen is a Co-Founder at REİ YAPI. He possess expertise in musicians, sports, shotokan karate, microsoft office, autocad.
-
Co-FounderRei̇ YapiIstanbul, Turkey -
Project Coordination EngineerMi̇ller Holdi̇ng A.Ş. Aug 2023 - Presentİstanbul, TürkiyeHead Office -
Co-FounderRei̇ Yapi Mar 2023 - Presentİstanbul, Türkiye -
Project Coordination EngineerYapi & Yapi Feb 2022 - Aug 2023İstanbul, TürkiyeHead Office -
Head Of Technical OfficeTürkcan Yapı Oct 2021 - Feb 2022İstanbul, TürkiyeEmployer: Istanbul Metropolitan MunicipalityProject: Umraniye - Atasehir - Goztepe Metro Project -
Planning And Cost Control EngineerMet-Gun Group Company Jul 2020 - Oct 2021Kocaeli, TürkiyeEmployer: Republic of Turkey Ministry of Transport and InfrastructureProject: Gebze - Darica Metro ProjectThis metro project with a length of 15,400 m is built with NATM (New Austrian Tunneling Method) method. It consists of 6 switch tunnels and 5 open-close tunnel and 6 stations to be created by NATM method.Responsibilities;• Cost control, Unit price analysis, Progress payment control of subcontractor,• NATM main work program planning (excavation, final covering and molding),• Daily, weekly, monthly planning, realization and deviation analysis,• Subcontractor's performance follow-up, analysis works and presentation. -
Planning And Cost Control EngineerAdvanced Construction Technologies Jun 2018 - Jul 2020KatarEmployer: Qatar Armed ForcesProject: Dukhan Airbase ProjectProject is under design & build delivery method, and scope of the contract is including but not limited to;Runway & apron, taxiway, control tower, roads, special systems, precast facilities, steel structures, concrete structures, boundary wall (length: 26,750 m), external fence (26,714 m), internal fence (31,998 m), 4 - star hotel (100 rooms), VIP Villa, Guest Villa (7 nos.), Hotel, Mosque, Staff House, Officer Guest House, Dormitories (3 nos.), Dining Facility, Clinic, Social Centre, Mosque, Commander Residence, Sports Hall, NCO/Soldier Barrack (5 nos.), Mess Hall, Tank Hangar, Workshop, Quarter Master Store, Mosque, Ammunition Stores (5 nos.), Officer Club, Headquarters, Signal Building, Ammunition Stores (8 nos.), Workshops (5 nos.), Loading/Unloading Area, Typhoon Hangar, Hawk Hangar, Forward Shelters (2 nos.), Hawk Sun Shelters (2 nos.), Other Support Facilities (21 nos.), Rafale Hangar, Forward Shelters, Aircraft Sunshade, Other Support Facilities (9 nos.), ATC Tower, Fire Fighting & Rescue Building, Headquarters, Multi Type Aircraft Hangar, Cargo Store, Ground Support, Other Support Facilities (20 nos.), External Entrance Gates (5 nos.), Access Control Points (10 nos.), Electrical Substations (26 nos.), Fuel Farm & Fuel Station, Other Services & Utilities.Total Plot Area: 41,214,493 m²Total Apron Area: 863,031 m²Total Built-up area: 325,692 m² (211 nos.), separated as follows;Responsibilities;• Cost control and realisation follow-up, Unit price analysis,• Workmanship follow-up and analysis, machinery, Workmanship follow-up and reporting,• Specifical reporting (personnel, machinery, concrete),• Productivity analysis of personnel and machinery,• Wastage analysis and reporting (concrete, formwork, rebar). -
Site EngineerMakyol İnşaat Sanayi Turizm Ve Ticaret A.Ş. Feb 2018 - Jun 2018Istanbul, TurkeyEmployer: Istanbul Metropolitan MunicipalityProject: Dolmabahce – Levazim – Baltalimani Highway Tunnel ProjectThe project consists 42 m shaft with 2 main tunnels.Responsibilities;• Undertaking leader role for excavation supporting activities for 4 tubes with adverse soil conditions (C class).• Coordination of work effort and subcontractor administration. -
Site SupervisorArmağan İnşaat San. Mühendislik Ve Dış Tic. Ltd. Şti. Aug 2017 - Nov 2017Istanbul, TurkeyFlorya Residential ProjectTotal built-up area; 2,445 m², residential area; 1,466 m²• Taking responsibility at all the phases of rough works including but not be limited to execution of projects on site, coordination of work gang, provision of material, subcontractor administration etc.
-
Control EngineerEmay Uluslararasi Muhendislik Ve Musavirlik A S Jun 2016 - Aug 2017Istanbul, TurkeyEmployer: Istanbul Metropolitan MunicipalityProject: Libadiye – Camlica Highway Tunnel ProjectNATM Scope: 3,177 m total main line (T1-T2-T3 tubes), 683 m connection tunnel and 293 m open-close tunnel. Responsibilities;• Tunnel production with bernold sheet method.• Taking precaution for collapse, overbreak etc.• Studies for excavation supporting.• Studies to avoid deformation (reverse arc, consolidation, and contact injection app.).• Invert and internal pavement works.• Deep pile and pile cap applictions. -
TraineeYapı Merkezi Jun 2014 - Jul 2014Istanbul, TurkeyEurasia Tunnel Project -
TraineeAvrasya Consult Jul 2013 - Aug 2013Istanbul, TurkeyMarmaray Railway Project
Burak Ergen Skills
Burak Ergen Education Details
-
Yüksek Lisans (Master) -
Lisans
Frequently Asked Questions about Burak Ergen
What company does Burak Ergen work for?
Burak Ergen works for Rei̇ Yapi
What is Burak Ergen's role at the current company?
Burak Ergen's current role is Co-Founder.
What schools did Burak Ergen attend?
Burak Ergen attended Beykent Üniversitesi, Beykent Üniversitesi.
What skills is Burak Ergen known for?
Burak Ergen has skills like Musicians, Sports, Shotokan Karate, Microsoft Office, Autocad.
Not the Burak Ergen you were looking for?
-
-
-
-
Burak ERGEN
Fmcg Professional & Mba & Professional Coach (Icf Certified) - "Bugün Için Yaşayın, Yarın Için Hayal Kurun, Dünden Öğrenin."Istanbul, Türkiye1lcwaikiki.com -
Burak Ergen
Web3 Marketing | Research Analyst | Web3 | | Marketing | | Business Development | | Partnership |Cryptocurrency |Istanbul, Türkiye
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial