Pre-Commissioning | Engineering Intern
CurrentEPCI Bacalhau Project | Equinor• Responsible for implementing a valve tracking system to monitor and track valves.• Developing pre-commissioning operational maps to illustrate all phase 1 & 2 operations.• Procedure issuance for mobilization loadout, umbilcal transport/monitoring and HIRA reports.• Review of onshore and offshore operational procedures within pre-commissioning scopes.• Assistance to Hazard Identification/Risk Assessment (HIRA) and Hazard/Operability Study (HAZOP).• Preparing tasks plans for activities such as lifting, disassembly, cleaning and maintenance of equipments.• Overseeing rigging, equipment and material for pre-commissioning mobilization at Triunfo Port for 7Pacific