Carlos Pena

Carlos Pena Email and Phone Number

Sr. Project Control Specialist @ Caterpillar Inc.
Newnan, GA, US
Carlos Pena's Location
Newnan, Georgia, United States, United States
About Carlos Pena

A highly skilled and talented hands-on engineer with vast expertise in project management, construction, renovations, equipment repairs, data analysis, maintenance, architectural glazing, technical reports, risk management, budget management, and regulatory compliance. Proven capabilities in visualizing, establishing, implementing, and monitoring metrics, statistics, and key performance indicators (KPIs) to generate management decision reports. Utilizes excellent interpersonal skills to engage with both external and internal customers, effectively communicating across all organizational levels. Serves as a key contributor to the on-going success of an organization.

Carlos Pena's Current Company Details
Caterpillar Inc.

Caterpillar Inc.

View
Sr. Project Control Specialist
Newnan, GA, US
Website:
caterpillar.com
Employees:
58910
Carlos Pena Work Experience Details
  • Caterpillar Inc.
    Sr. Project Control Specialist
    Caterpillar Inc.
    Newnan, Ga, Us
  • Caterpillar Inc.
    Project Control Specialist
    Caterpillar Inc. Nov 2024 - Present
    Irving, Texas, Us
  • Duracell Inc.
    Engineering Project Manager
    Duracell Inc. Dec 2018 - May 2024
    Chicago, Illinois, Us
    • Led CAPEX engineering and construction projects valued up to US$3M.• Applied engineering, finance, and project management knowledge and technical expertise to develop innovative approaches to problem-solving.• Supervised project scope, cost, and schedule to ensure all success criteria were met.• Oversaw cross-functional team by communicating clearly, building collaborative relationships, and fostering healthy team culture.• Managed the project from conception to roll-out, analyzing the scope, objectives and understanding the unique needs of each project.• Set personal direction, prioritized multiple tasks, and continuously enhanced personal knowledge and capabilities to meet business needs and deliver expected results. • Provided direction for project team members, stakeholders, and contracted resources.• Adhered to and leveraged established engineering and project management tools and processes.• Sought out cost reduction opportunities.• Managed various projects, including:o 2019: Installation of lead line for new laser cleaner and oriented buffer equipment for AA battery line. (US$2M)o 2020: Roll out laser cleaner and buffer unit for all AA lines. (USD$8M)o 2020 to 2023: Construction improvement for new warehouse building. New roof, interior paint, new fire alarm system, additional CCTV, Storage racks, in-fill of pits, new LED illumination system, floor resurface, and fire sprinkler system modifications. (USD$8.5M).o 2023: Replacement of obsolete consol feed system for AA4 battery line for new upgrade gauge roller system. (USD$1.2M).
  • Duracell Inc.
    Engineering Project Manager
    Duracell Inc. Dec 2018 - May 2024
    Chicago, Illinois, Us
  • Duracell Inc.
    Project Manager
    Duracell Inc. Dec 2018 - May 2024
    Chicago, Illinois, Us
  • Jackson Health System
    Project Manager
    Jackson Health System Jan 2016 - Nov 2018
    Miami, Fl, Us
    • Developed detailed technical scopes of work for renovation and equipment repair projects using tools such as Google Earth, PowerPoint, Word, field tests, and measurement tools.• Identified sources of failures through root cause analysis and recommended design or process modifications utilizing CAD, blueprint reading, technical catalogs, 3D modeling, and engineering calculations.• Resolved moderately complex technical and operational issues by applying standard procedures.• Designed and implemented new methods and processes to enhance existing operations.• Coordinated contractors, architects, and other project team members to deliver high-quality projects within specified timeframes.• Delivered timely and accurate oral and written technical reports regarding assigned engineering activities.• Reviewed quotes, prepared budgets, and matched requirements with regulatory codes, including RFI.• Ensured compliance with AHCA, JCT, NFPA, OSHA, and other regulatory requirements applicable to hospital operations. • Updated preventive maintenance programs according to regulatory agencies.• Operated in a highly regulated environment, performed risk assessments, and implemented interim life safety measures for projects.• Made data-driven decisions by collecting, reviewing, and graphing preventive maintenance information to present trends, problems, and solutions to upper management. • Supported technical decisions with data using Excel tools such as pivot tables, filters, and VLOOKUP.• Utilized lean tools and maintenance management software to improve quality outcomes.• Compiled data from multiple sources to create meaningful reports for various audiences.• Supervised performance and quality of 14 supervisors and two superintendents.• Collaborated closely with Six Sigma Black Belts on Sigma projects, utilizing KPIs, Yoke Poke, 5S, 5 Whys, and other methodologies.
  • Jackson Health System
    Stationary Engineer
    Jackson Health System Jun 2015 - Jan 2016
    Miami, Fl, Us
    • Offered technical support to A / C department and central control system.• Supervised on-site jobs for critical support equipment like boilers and chillers.• Maintained daily log of chiller and boiler parameters.• Supported preventive maintenance program.
  • Insurance Services Office
    Field Representative
    Insurance Services Office Nov 2010 - Jun 2015
    Jersey City, Nj, Us
    • Functioned as risk data analysis collector for commercial and big residential complexes.• Evaluated fire protection and conducted wind mitigation surveys.• Applied NFPA and OSHA codes to customer surveys.• Provided risk analyst recommendations.• Self-scheduled and budgeted business trips.• Analyzed fire sprinkler protection and confirmed compliance with NFPA requirements.• Used multi-layer pictures to provide a clear description of risk.• Used Google Sketch-up to provide a clear view of risks associated with property.
  • Chubb
    Loss Control Engineer
    Chubb Mar 2009 - Aug 2010
    Ch
    Performs and evaluates a survey of risk conditions in clients’ facilities. Thisrequires to conduct formal interviews with various departments within the facilitythat included safety and security follow-ups of their compliance. • Elaboration of a written report stating the controlled and uncontrolled issues ofthe facility and providing such report to the underwriter for further evaluationand following NFPA and OSHA standards• Consequent quarterly follows ups and suggests modifications to the currentprocesses to lower client’s risks• Evaluation and implementation of new loss control services according toclients’ needs.
  • Tecnoglass
    Project Manager
    Tecnoglass Mar 2004 - Mar 2009
    Barranquilla, Atlántico, Co
     Project Manager (Project value from US$100,000 up to $1.5millions)• Develop project objectives by reviewing project proposals and plans; and conferring with management.• Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.• Assisting in product development and performance tests.• Determines project schedule by studying project plan and specifications; calculating time requirements; and sequencing project elements.• Maintains project schedule by monitoring project progress; coordinating activities; and resolving problems.• Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.• Prepare project status reports by collecting, analyzing, and summarizing information and trends; and recommending actions.• Maintains product and company reputation by complying with federal and state regulations.• Contributes to team effort by accomplishing related results as needed.• Performs AUTOCAD detailed architectural drawings of window solutions for specific clients. Implementation of dynamics block to save drawing editing time. Use of multiple layers and object libraries to increase edit timing. • Link Bill of Material (BOM) to Autocad using Excel. • Create manufacturing instructions and installation documents. Provide additional layouts required for railings before concrete pouring. • Field supervision for railing and windows installation. Provide on-field solutions to unexpected problems related to installation. • Follow up and troubleshoot installation issues and provide detailed Excel reports• Knowledge of assembly solutions, and troubleshooting in cooperation with RC Aluminum, a business partner of Tecnoglass.• Achievement: Create a dynamic CAD library using AUTOCAD dynamic block to edit fast the assembly blueprints for the most common system used.
  • Universidad Del Norte
    Project Engineer
    Universidad Del Norte Sep 2002 - Nov 2003
    Barranquilla, Atlantico, Co
    In charge of collecting the data required for the calculation of the co-generation. This project consisted of installing a gas-powered electric generator, using the fumes from the internal combustion engine, and redirecting to a part of the manufacturing process to recover the waste heat. Data collection was related to the amount of heat required in the process, gas consumption of the engine, electrical consumption of the plant, CAD design. Provide a detailed graphic report to members of the board.

Carlos Pena Education Details

  • Universidad Del Norte
    Universidad Del Norte
    Mechanical Engineering

Frequently Asked Questions about Carlos Pena

What company does Carlos Pena work for?

Carlos Pena works for Caterpillar Inc.

What is Carlos Pena's role at the current company?

Carlos Pena's current role is Sr. Project Control Specialist.

What schools did Carlos Pena attend?

Carlos Pena attended Universidad Del Norte.

Who are Carlos Pena's colleagues?

Carlos Pena's colleagues are Kenneth Gutiérrez, Bas Timmers, Leema Rose, Lloyd Huntington, Mingzhe Liu, Leticia De Paula, Phil Meyer.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.