At Fluor Corporation, my role as the Senior Cost Engineer blends a rich understanding of systems with a sharp focus on cost and progress reporting. Leveraging a robust skill set in Microsoft Office, I've streamlined processes that bolster business management functions. These include manpower planning and labour man-hour capture, crucial for project success.My competencies extend to developing sophisticated database applications that enhance organizational efficiency. With my hands-on experience, I've contributed to the expansion projects at Tengizchevroil, harnessing technology to support project controls, finance, and human resources. As I continuously evolve my expertise in Microsoft 365 power tools, I remain committed to driving technological solutions that advance project outcomes.

Cassie Nel's Current Company Details

Senior Cost Engineer - Systems | Cost Reporting Expert
Cassie Nel Work Experience Details
  • Fluor Corporation
    Senior Cost Engineer - Systems
    Fluor Corporation Oct 2013 - Sep 2023
    Atyrau Region, Kazakhstan
    Assigned to the FGP project in 2013 by the EPCM contractor KPJV Limited, which is a Joint Venture consisting of Fluor, WorleyParsons, Kazakh Institute of Oil and Gas JSC (KING) and Engineering Company Kazgiproneftetrans (KGNT).The same JV also performed the FEED for the project. The project entails the design and construction of a major expansion of Tengizchevroil (TCO) existing facilities in Tengiz, Atyrau Oblast, Republic of Kazakhstan. Initially based in Atyrau to develop a very… Show more Assigned to the FGP project in 2013 by the EPCM contractor KPJV Limited, which is a Joint Venture consisting of Fluor, WorleyParsons, Kazakh Institute of Oil and Gas JSC (KING) and Engineering Company Kazgiproneftetrans (KGNT).The same JV also performed the FEED for the project. The project entails the design and construction of a major expansion of Tengizchevroil (TCO) existing facilities in Tengiz, Atyrau Oblast, Republic of Kazakhstan. Initially based in Atyrau to develop a very sophisticated data base application for management most of the aspects of the business management functions, including:1. Manpower planning2. Recruitment and Mobilization3. Personnel approvals4. Labor man hour capture and processing for cost reporting, forecasting, invoicing, Control Package estimating including assignment expenses and other miscellaneous planned and ad hoc reporting requirements.These systems were transferred to the Fluor Farnborough office in 2016 for support and future development.I was then transferred to Tengiz construction group in 2017 to setup and support the progress and performance measurement system, MileMarker. The FGP project was split into 5 areas (projects) with MileMarker Coordinators and Technicians in every area. My role was the coordination of all areas and to do summarized reporting for FGP. Main application developed is the Daily Force Report to capture actual manpower and manhours by day for all subcontractors per area/discipline/craft and load the summaries to MileMarker for productivity calculations. Show less
  • Fluor Corporation
    Lead Cost Engineer
    Fluor Corporation Dec 2011 - Sep 2013
    Novorossiysk, Russia
    Fluor provides project services for Chevron Neftegaz, one of the three project managers engaged by theCaspian Pipeline Consortium for the expansion (CPE) project in Kazakhstan and Russia. Fluor providesoversight assistance for the deepwater marine terminal expansion in Novorossiysk as well as expanding thesupervisory control and data (SCADA) telecommunications at the marine terminal and 15 pump stations. Theexpansion includes adding six 100,000 cubic meter tanks, adding a 5 km… Show more Fluor provides project services for Chevron Neftegaz, one of the three project managers engaged by theCaspian Pipeline Consortium for the expansion (CPE) project in Kazakhstan and Russia. Fluor providesoversight assistance for the deepwater marine terminal expansion in Novorossiysk as well as expanding thesupervisory control and data (SCADA) telecommunications at the marine terminal and 15 pump stations. Theexpansion includes adding six 100,000 cubic meter tanks, adding a 5 km 42-inch loading line and single pointmooring system.Assigned to the project as lead cost engineer to provide support to the main sub-contractor,Koksokhimmontazh (KXM), to control the cost of their lump sum project for the tank farm and onshorefacilities. Part of a small project controls implementation team responsible to setup systems and controls forscheduling activities, measuring progress, calculating value of work done, cash flow forecasts, invoicing, actsof acceptance documents. Kildrummy® Project Cost Management system is used for cost of sales by paymentmilestone to Chevron. Developing a Project Milestone Manager system (PMM) as a data warehouse forproject activities, manpower and procurement. The system interface to Primavera P6, MilemarkerSM andKildrummy®. Show less
  • Fluor Corporation
    Information Systems Specialist
    Fluor Corporation May 2010 - Oct 2011
    Jwaneng, Botswana
    Fluor provided engineering, procurement and construction management (EPCM) for expansion of the current open pit diamond mine to facilitate access to the Kimberlite ore at a greater depth. This expansion includes the relocation and reconstruction of portions of the existing surface infrastructure that are impacted by the pit expansion. Assigned to the project to provide primary support to the human resources, project controls and construction information systems. Responsible to develop,… Show more Fluor provided engineering, procurement and construction management (EPCM) for expansion of the current open pit diamond mine to facilitate access to the Kimberlite ore at a greater depth. This expansion includes the relocation and reconstruction of portions of the existing surface infrastructure that are impacted by the pit expansion. Assigned to the project to provide primary support to the human resources, project controls and construction information systems. Responsible to develop, implement and support the daily manpower return system to record contractor activity, employee strength & time by occupation code using different templates from subcontractors. Responsible for the development and support of the project Asset Register for all site purchased assets. Created a system for asset management with an interface to the material management system (MatManSM). Developed a change management system for project controls that is event driven and creates early warnings identifying potential impacts to project schedule and cost. Supported the in-house developed HR / Camp Management system. Performed measurement of the performance and progress for electrical cables and equipment using MileMakerSM with weekly progress reporting. Show less
  • Fluor, Nizhnekamsk
    Information Systems Specialist
    Fluor, Nizhnekamsk Feb 2009 - Mar 2010
    Oao Tatneft And Ojc Taneco, Nizhnekamsk, Tatarstan, Russia
    Fluor provided project management services for a refinery complex which was expected to have the capacity to refine up to 7 million metric tons of crude oil per year.Assigned to the project as database integrator - a position designed to facilitate the flow of data captured and reported throughout project execution. Prior to my assignment, data was recaptured and managed by groups in isolation from others. My main focus was analysing, developing and improving the project data workflows,… Show more Fluor provided project management services for a refinery complex which was expected to have the capacity to refine up to 7 million metric tons of crude oil per year.Assigned to the project as database integrator - a position designed to facilitate the flow of data captured and reported throughout project execution. Prior to my assignment, data was recaptured and managed by groups in isolation from others. My main focus was analysing, developing and improving the project data workflows, as well as in designing the database interfaces and integrations to create a more seamless and portable workflow. While providing specialist support for project and enterprise applications for Project Controls and Project Business Services (FDCost, CODA Financials, 1C Russian Payroll, SAP, MileMarker, MatMan, etc.), this project allowed for the development of database systems and integration tools in quality management, materials management, quantity survey, asset inventory management and staff planning. Show less
  • Fluor, Mongolia
    Information Systems Specialist
    Fluor, Mongolia Apr 2006 - Apr 2008
    Oyu Tolgoi Project - Mongolia, Shanghai
    100,000 tons per day copper concentrator project, Mongolia.Assigned to the Project Controls Department with main function in cost management. Updated the cost management system (FDCost) with commitments and expenditures from SAP financials. Maintained budgets with change management in FDCost. Developed FDCost / SAP cost reporting module. Monthly reconciliation of FDCost and SAP expenditures. Matman procurement system administration. Created PO material receipt status reporting subsystem… Show more 100,000 tons per day copper concentrator project, Mongolia.Assigned to the Project Controls Department with main function in cost management. Updated the cost management system (FDCost) with commitments and expenditures from SAP financials. Maintained budgets with change management in FDCost. Developed FDCost / SAP cost reporting module. Monthly reconciliation of FDCost and SAP expenditures. Matman procurement system administration. Created PO material receipt status reporting subsystem to produce monthly cost accruals. Show less
  • Fluor, Kuwait
    Information Systems Specialist
    Fluor, Kuwait Sep 2005 - Apr 2006
    Kuwait Oil Company (Koc
    Dedicated to convert Coda Financials to the SAP Chart of Accounts (CoA) structure, loading legacy balances mapped to the new CoA, conversion of all the Coda Reports and Interfaces to the new structure. Developed the FACT timesheet and labor distribution system with interface to Timberline for payroll and Coda Financials for labor distribution.
  • Fluor, Shanghai, China
    Cost / Administration Systems Specialist
    Fluor, Shanghai, China Mar 2005 - Oct 2005
    Shanghai Isocyanates Jv, Caojing, Shanghai, China
    Fluor as managing partner of consortium project with process units for DNT, nitric acid, nitrobenzene, aniline, toluenediisocyanate, and MDI.Assigned to the project for implementation and support the Coda Financials system and Project Controls systems. Developed and implemented the following systems:1. Purchase Order commitment module with dual currencies for commitments and expediture by contract and actual exchange rates.2. Coda / FDCost interface for commitments and… Show more Fluor as managing partner of consortium project with process units for DNT, nitric acid, nitrobenzene, aniline, toluenediisocyanate, and MDI.Assigned to the project for implementation and support the Coda Financials system and Project Controls systems. Developed and implemented the following systems:1. Purchase Order commitment module with dual currencies for commitments and expediture by contract and actual exchange rates.2. Coda / FDCost interface for commitments and expenditures3. Coda / Material Management (MatMan) interface for equipment and bulk material4. Cost allocation for bulk materials to plant and joint venture based on requirement (not by pro-ratable area)5. Monthly reconciliations of Coda / CMS / MatMan / FDCost6. Cost Reports with budget, commitments and expenditures7. MatMan / CompleteIT turnover system interface Show less
  • Fluor, Nanjing, China
    Cost / Administration Systems Specialist
    Fluor, Nanjing, China Jun 2001 - Dec 2004
    Basf-Ypc Co. Ltd. (Byc), Nanjing, Jiangsu, China
    Fluor provided Program Management Services as part of the Integrated Management Team from Fluor, BASF, and Yangzi Petroleum for the Integrated Petrochemical Site, comprising nine production plants, supporting utilities, and auxiliary facilities including a 600,000 ton/year ethylene cracker.Developed and supported the following information systems:1. Coda Financials and Reports2. Purchase Order commitment module using Coda callable link3. Material Management interfaces for… Show more Fluor provided Program Management Services as part of the Integrated Management Team from Fluor, BASF, and Yangzi Petroleum for the Integrated Petrochemical Site, comprising nine production plants, supporting utilities, and auxiliary facilities including a 600,000 ton/year ethylene cracker.Developed and supported the following information systems:1. Coda Financials and Reports2. Purchase Order commitment module using Coda callable link3. Material Management interfaces for cost alignment.4. Cost Reports in dual language (English, Chinese).5. Estimating suite of programs that interfaces to the Icarus system and China pricing code books.6. Interface from Coda Financial Accounts Payable and Purchase Order module to the client SAP system. Show less
  • Fluor, Moscow
    Project Controls System Specialist
    Fluor, Moscow May 2000 - May 2001
    Cpc Pipeline Project, Moscow, Russia
    Fluor provided engineering, procurement and program management for refurbishment and new construction of Phase I (28.2 million tons per annum) of a crude oil pipeline system from Tengiz, Kazakhstan, to Novorossiysk, Russia, which included 930 miles of 40 and 42-inch pipeline; several HDD river crossings including a 1.5 km HDD of the Volga River; 5 pump stations; a tank farm with five 120,000-cubic-meter tanks and an 8 km 56-inch gravity loading line; a marine terminal with metering, surge tanks… Show more Fluor provided engineering, procurement and program management for refurbishment and new construction of Phase I (28.2 million tons per annum) of a crude oil pipeline system from Tengiz, Kazakhstan, to Novorossiysk, Russia, which included 930 miles of 40 and 42-inch pipeline; several HDD river crossings including a 1.5 km HDD of the Volga River; 5 pump stations; a tank farm with five 120,000-cubic-meter tanks and an 8 km 56-inch gravity loading line; a marine terminal with metering, surge tanks and small boat harbor; two 5-km 42-inch offshore loading lines and two SPMs; and a new SCADA and telecommunication system. Developed and supported the following information systems on the CPC Caspian pipeline project:1. Coda Financials and Reports;2. Purchase order commitment module;3. CPCost data warehouse and reporting on financial and labor data;4. Time Tracker labor system;5. Contracker labor and equipment costing for lump sum, cost reimbursable and unit price subcontractors;6. Statements of employee earnings for tax purposes. Show less
  • Fluor Corporation
    Business Analyst / Project Leader
    Fluor Corporation Nov 1996 - Apr 2000
    Sunninghill, Johannesburg, South Africa
    1. Developed EDAS – Engineering Document Activity Status system for project management2. Developed PMM – Project Manpower Management System3. Installed Coda Financial software4. Supported Coda Financials for projects located in South Africa, Russia, Asia (Jakarta, Singapore, Shanghai, Beijing, Seoul)5. Developed standard financial reporting system for general ledger, trial balance, employee receivables, accounts payable, accounts receivable, project cost.6. Developed… Show more 1. Developed EDAS – Engineering Document Activity Status system for project management2. Developed PMM – Project Manpower Management System3. Installed Coda Financial software4. Supported Coda Financials for projects located in South Africa, Russia, Asia (Jakarta, Singapore, Shanghai, Beijing, Seoul)5. Developed standard financial reporting system for general ledger, trial balance, employee receivables, accounts payable, accounts receivable, project cost.6. Developed sub-systems for the Coda Financial system for bank electronic payments (CATS), purchase order module, labor interface, salaries interface, RSC levies, APC - Advanced Profit Calculation, OMR - Overhead Management. Show less
  • Randgold & Exploration
    Systems Analyst, Project & Information Systems Manager
    Randgold & Exploration Aug 1981 - May 1996
    Harmony Gold Mine, Virginia, South Africa
    1. Management - Formulated IS strategic plan, maintained IS facilities infrastructure, performed application development, support and training, disaster recovery planning, capital & departmental budgeting, maintained adequate IS skills availability, communication forums for users and vendors.2. Systems Development - Developed, implemented and supported the following applications:Survey Contract Measurement, Survey Statistics and GME reporting, Production Forecast, Daily Production… Show more 1. Management - Formulated IS strategic plan, maintained IS facilities infrastructure, performed application development, support and training, disaster recovery planning, capital & departmental budgeting, maintained adequate IS skills availability, communication forums for users and vendors.2. Systems Development - Developed, implemented and supported the following applications:Survey Contract Measurement, Survey Statistics and GME reporting, Production Forecast, Daily Production Blasting Statistics, Production Bonus, Contractors Costing, Area Costing Interface to Financial System, Sampling Photogrammetry, Geostatistical Grade Evaluation, Mineral Resource Management, Ore Reserves, Time and Attendance, Industrial Relations Attitude Interviews, Planned Equipment Maintenance.3. Application Support - First line help-desk function on the following packages:Masterpiece Finance, Costing and Material Management, Datamine Geostatistical evaluation and draughting, FilePlus Document Image Processing, RMS2000 Time & Attendance, Qpac Payroll4. Downsizing - Implemented new IS strategy with the emphasis on decentralization, package solutions, open systems in a client server environment. Performed joint application development (JAD) sessions were conducted with all the disciplines using the Informet methodology and case tools. Installed new network backbone, hardware and software infrastructure. Show less
  • Jci
    Programmer
    Jci Apr 1977 - Jul 1981
    Rustenburg Platinum Mine
    Received extensive training on all aspects of the systems development life cycle. Developed two medium sized systems for dust particles control and house maintenance & allocation. Also provided payroll support and development..

Cassie Nel Education Details

Frequently Asked Questions about Cassie Nel

What is Cassie Nel's role at the current company?

Cassie Nel's current role is Senior Cost Engineer - Systems | Cost Reporting Expert.

What schools did Cassie Nel attend?

Cassie Nel attended University Of South Africa/universiteit Van Suid-Afrika, Rustenburg Commercial High.

Not the Cassie Nel you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.