İlker Kara Email & Phone Number
Who is İlker Kara? Overview
A concise factual answer block for searchers comparing this professional profile.
İlker Kara is listed as Civil Engineer - Wind Power Projects at Enerjisa Üretim, a company with 514 employees, based in İzmit, Kocaeli, Turkey. AeroLeads shows a matched LinkedIn profile for İlker Kara.
İlker Kara previously worked as Saha Şefi at Enerjisa Üretim and Wind Farm Site Chief at Cengiz Enerji A.Ş.. İlker Kara holds Bachelor'S Degree, Civil Engineering from Karadeniz Teknik Üniversitesi.
Email format at Enerjisa Üretim
This section adds company-level context without repeating İlker Kara's masked contact details.
Review company-level records connected to İlker Kara before choosing the right outreach path.
About İlker Kara
Experienced in construction, installation, and commissioning phases of the #WindFarm ProjectI am currently working at the construction of the Ihlamur Wind Power Project (Ihlamur RES), Balikesir,TR as a Site Chief.I worked before at,-Cerkes WPP-(36 MWe), Cankiri as a Site Chief (extension phase, Goldwind 5xGW182)-Karamursel WPP-(30MWe), Kocaeli as a Site Chief;-Kandira WPP-(49MWe), Kocaeli as a Site Manager; -Bozuyuk WPP-(90MWe), Bilecik as an Assistant Site Manager, (from the permitting and construction stages to the ministry acceptance).I am one of the stronger runners in renewable energy marathon for better future. My first target is to reach 500 MW of wind energy project portfolio in brief time, then 1000 MW.I discover new things and continue to develop myself in the field of professional, technical, and intellectual, thanks to my passion for continuous learning.I am also interested in fishing, camping, and bird-watching.#RES #WPP #RenewableEnergy #WindEnergy #ProjectDevelopment #Onshore #Offshore #WindFarm #CleanEnergy #RüzgarEnerjisi #YenilenebilirEnerji #RüzgarTürbini #RüzgarEnerjiSantrali #İnşaatMühendisliği #CivilEngineering #Construction #İnşaat #PowerPlants #Structures #ŞaltSahası #Highvoltage #Switchyard
İlker Kara's current company
Company context helps verify the profile and gives searchers a useful next step.
İlker Kara work experience
A career timeline built from the work history available for this profile.
Wind Farm Site Chief
- Karamursel WPP, KOCAELI - Total Installed Capacity: 30 MWe; Units: (5 x 5.8 MW, GE-Cypress-v2, RD: 158m, HH: 101m and 1x4.2 MW Enercon E-138 EP3 RD:138m, HH: 110m "previously installed" )https://cengizenerji.com.tr/
- Monitoring all construction and installation phases,
- Following up on the transport plans of WTG’s components,
- Controlling of wind tower foundation works,
- Tracking of blade lifter transport operations (30km)
- Controlling daily site construction reports,
Site Manager
- Kandira WPP, KOCAELI - Total Installed Capacity: 49 MWe; Units: (10 x 5.3 MW, GE-Cypress, RD: 158 m)https://kandirares.com/Bozuyuk WPP, BILECIK - Total Installed Capacity: 90 MWe; Units: (11 x 5.3 MW, GE-Cypress, RD.
- Following up preliminary and final electrical /civil design and approval stages of Wind Power Plant,(forest permits, public display period, zoning and expropriation permits, EIA report, construction permit etc.),
- Establishing and managing relationships with the third parties involved in projects development:governmental offices, regulatory authorities, elected officials, public services, consultants, suppliers, subcontractors.
- Analyzing survey reports, maps, and other data to plan site access roads,
- Designing site access roads to facilitate turbine component transportation acc. to GE Technical Book,
- Revising of road and crane hardstanding by identifying alternative routes (over 30% reduced in costs),
Engineer Lieutenant
- AIR FORCES COMMAND, 1ST MAIN JET BASE COMMAND, ESKISEHIRCivil Engineer CorpsDuties
- Preparation of detailed engineering drawings of maintenance and repair works,
- Renovation of wet floors,
- Preparation of bill of quantities, technical specifications and bid documents,
- Controlling asphalt and concrete pavement on take-off, taxiway and emergency pist, (41600m² asphalt, 40000m² concrete)
- Keeping records of daily job site activities in Excel,
Site Engineer
- Construction of High School/Alacam (with 21 classrooms) and Industrial Vocational High School, Bafra, SAMSUN
- Controlling of rough and fine construction works,
- Calculating and ordering the required amount of materials,
- Daily management of up to 40 project staff,
- Preparing and tracking monthly based progress payments,
- Preparing attendance sheet,
Site Civil Engineer
- Construction of Atatürk Anatolian High School Indoor Sports Hall (seating capacity of 411), ORDU
- Inspection of finishing construction works,
- Quantity surveying and attendance sheet in Excel,
- Material quantity calculation and ordering
Intern Engineer
The Northern Marmara Motorway and The 3rd Bosphorus Bridge Project, ISTANBUL
Intern Engineer
Quasar Istanbul Project
Colleagues at Enerjisa Üretim
Other employees you can reach at enerjisauretim.com.tr. View company contacts for 514 employees →
Hüseyin Kalayci
Colleague at Enerjisa Üretim
Kahraman Maras, Türkiye, Turkey
View →
AE
Anıl Erduran
Colleague at Enerjisa Üretim
Istanbul, Türkiye, Turkey
View →
CÜ
Cevdet Ülgen
Colleague at Enerjisa Üretim
Antalya, Türkiye, Turkey
View →
EK
Elif Kılıf
Colleague at Enerjisa Üretim
Kayseri, Türkiye, Turkey
View →
VY
Veli Yumuk, Cfa
Colleague at Enerjisa Üretim
Istanbul, Türkiye, Turkey
View →
AK
Abdullah Karaaslan
Colleague at Enerjisa Üretim
Kahraman Maras, Türkiye, Turkey
View →
FA
Faruk Avci
Colleague at Enerjisa Üretim
Türkiye, Turkey
View →
HS
Hakan Sarıboğa
Colleague at Enerjisa Üretim
Adana, Türkiye, Turkey
View →
Eİ
Emre İnan
Colleague at Enerjisa Üretim
Kahramanmaraş, Kahraman Maras, Türkiye, Turkey
View →
EK
Emre Karbeyaz
Colleague at Enerjisa Üretim
Ataşehir, Istanbul, Türkiye, Turkey
View →
İlker Kara education
Bachelor'S Degree, Civil Engineering
High School, Science
Frequently asked questions about İlker Kara
Quick answers generated from the profile data available on this page.
What company does İlker Kara work for?
İlker Kara works for Enerjisa Üretim.
What is İlker Kara's role at Enerjisa Üretim?
İlker Kara is listed as Civil Engineer - Wind Power Projects at Enerjisa Üretim.
Where is İlker Kara based?
İlker Kara is based in İzmit, Kocaeli, Turkey while working with Enerjisa Üretim.
What companies has İlker Kara worked for?
İlker Kara has worked for Enerjisa Üretim, Cengiz Enerji A.Ş., Rt & Turkerler Jv, Tsk (Türk Silahlı Kuvvetleri), and Emre Terzioglu-Terzioglu Construction Contracting Co..
Who are İlker Kara's colleagues at Enerjisa Üretim?
İlker Kara's colleagues at Enerjisa Üretim include Hüseyin Kalayci, Anıl Erduran, Cevdet Ülgen, Elif Kılıf, and Veli Yumuk, Cfa.
How can I contact İlker Kara?
You can use AeroLeads to view verified contact signals for İlker Kara at Enerjisa Üretim, including work email, phone, and LinkedIn data when available.
What schools did İlker Kara attend?
İlker Kara holds Bachelor'S Degree, Civil Engineering from Karadeniz Teknik Üniversitesi.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the İlker Kara you were looking for.
View similar profiles