Site Engineering
Current-Konya Mutluer Energy 19 MW Hybrid Solar Power Plant installation and commissioning.-Installation, testing, and commissioning of the medium voltage power cables, control and communication cables, signal cables, grounding cables, and fiber optic cables for a total of 5 wind turbines with a capacity of 4.8 MW each at the Denizli Wind Plant