Senior Industrial Engineer
- Managed factory development of Virgin’s second site in Long Beach with a budget of $500,000 while working cross-functionally with operations, procurement, facilities, contractors, and vendors to develop and execute the future state layout under - Led waste elimination initiative in bottlenecked area (propulsion component testing work cell) by identifying and developing an action plan resulting in a 22% increase in technician efficiency and 14% increase in deliveries- Performed capacity analysis in lamination work center to identify takt time, cycle times, capacity constraints (tooling, equipment, labor) at various rocket delivery rates and led kaizen improvements around constraints to increase deliveries by 40% in lamination work center- Utilized BasicMOST time measurement system to develop Virgin Orbits standard process for determining labor standards in order to measure efficiency and productivity of a work center