Construction Manager Ii
• Perform Preconstruction Walks with Customer and GC to identify the following: constructability, crane or man lift access when needed, existing equipment and if it matched the structural analysis, power/backhaul resources etc;. Responsible for writing SOW while on site and identifying out of scope work with the GC. Also approved all redlined changes with customer while on site.• Managed multiple GC’s through construction of the above mentioned technologies which consisted of many different configurations depending on what was existing at the site. Remove/replace or just add antennas. Remove/replace or just add RRU’s. Installation of Hi-Cap Fiber Cables and OVP. Installation of System modules within identified cabinets while on preconstruction walks. Ground to tower installations etc;. • Performed daily CX site visits to check progress as well as to make sure that safety and CX protocol was being followed• Managed GC’s through Commissioning/Integration• Performed Punch Walks in the event that virtual punch walks could not be performed.• Reviewed GC COP within EAMS/CAM tool