Project Engineer
CurrentDesign and Fabrication: Streamlined the verification processes for fabrication and installation tasks related to high-quality CAD model creation.Maintained Facilities: Investigated recurring structural concerns related to facility equipment and established solutions detailing necessary improvements.Cost Optimization: Minimized project expenses by optimizing existing materials usage, reducing BOM costs by at least 75%. Maintenance Systems: Developed effective maintenance systems by assessing equipment usage and maintenance needs, reducing the risk of injuries to 100% over 3 years.Technical Problem Solving: Engineered innovative solutions using power tools and welding technology, which contributed directly to completing complex tasks ahead of schedule on four major projects without compromising safety protocols. Preventative inspections: Achieved successful implementation of preventive maintenance schedules — leading directly to zero reported incidents concerning machinery malfunctions over twelve months.