Sr. Manager Npi Operations
Santa Clara, Ca, Us
• Orchestrated 50+ chambers builds concurrently from 8 different projects (Centris, Radion, Integra, Olympia, Volga, Gershwin, Napa & Sonoma)• Hired, trained and supervised 100+ employees to support the steepest ramp in 13 years• Planned and executed ramp readiness by analyzing material availability, capacity, and high volume manufacturing transition plan • Leaded cross-functional team (planning, logistic, engineering, quality, project, program) to achieve project objectives• Restructured BOM plus build sequence by identify critical path, constraints, contingencies and mitigations• Initiated module build to simplify manufacturing process, shorten training time and reduce BOM complexity • Implemented Lean manufacturing/5S/Kaizen to NPI operation and reduced cycle substantially (ALD 51%, CMP 59% & ETCH 86%) • Introduced inline quality check to increase 1st pass yield from 42% to 98% during final test• Led Olympia NPI manufacturing team to grant AMPS certification in 10 months• Achieved Black Belt 6 Sigma certification requirement in 12 months