AeroLeads people directory · profile

Christopher Barnas Email & Phone Number

Project Manager / Senior Scheduler George Washington Bridge Program at MBP (McDonough Bolyard Peck) at MBP (McDonough Bolyard Peck)
Location: New York, United States 10 work roles 2 schools
1 work email found @mbpce.com 7 phones found area 908, 734, 570, 919, and 703 LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 86%

Contact Signals · 1 work email · 7 phones

Work email c****@mbpce.com
Direct phone (908) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Project Manager / Senior Scheduler George Washington Bridge Program at MBP (McDonough Bolyard Peck)
Location
New York, United States
Company size

Who is Christopher Barnas? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Christopher Barnas is listed as Project Manager / Senior Scheduler George Washington Bridge Program at MBP (McDonough Bolyard Peck) at MBP (McDonough Bolyard Peck), a with 331 employees, based in New York, United States. AeroLeads shows a work email signal at mbpce.com, phone signal with area code 908, 734, 570, 919, 703, and a matched LinkedIn profile for Christopher Barnas.

Christopher Barnas previously worked as Project Manager at Mbp (Mcdonough Bolyard Peck) and Project Manager / Senior Scheduler George Washington Bridge Program at Mbp (Mcdonough Bolyard Peck). Christopher Barnas holds Bs, Construction Engineering from Lawrence Technological University.

Company email context

Email format at MBP (McDonough Bolyard Peck)

This section adds company-level context without repeating Christopher Barnas's masked contact details.

{first_initial}{last}@mbpce.com
89% confidence

AeroLeads found 1 current-domain work email signal for Christopher Barnas. Compare company email patterns before reaching out.

Profile bio

About Christopher Barnas

Manager project controls with over thirty years of experience working for both client and engineering / contractor based companies. I have a proven track record in project control techniques and tools, project management skills, negotiation, customer service, team building and interpersonal communications for engineering, procurement, construction and commissioning projects. Multi-disciplinary skills are in the areas of client and contractor liaison; project monitoring, cost control, change control and forecasting, project planning and scheduling; design, procurement and construction coordination and supervision; auditing, process improvement and administrating procedures and policies; empowering team building, employee development and communication. Well versed in project estimating, coordinating and manpower planning, and efficient with computer applications.

Current workplace

Christopher Barnas's current company

Company context helps verify the profile and gives searchers a useful next step.

MBP (McDonough Bolyard Peck)
Mbp (Mcdonough Bolyard Peck)
Project Manager / Senior Scheduler George Washington Bridge Program at MBP (McDonough Bolyard Peck)
fairfax, virginia, united states
Website
Employees
331
AeroLeads page
10 roles

Christopher Barnas work experience

A career timeline built from the work history available for this profile.

Project Manager / Senior Scheduler George Washington Bridge Program

Greater New York City Area

Senior Lead Project Scheduler for the Port Authority of New York & New Jersey on the 10-year Rehabilitation Construction Program of the George Washington Bridge.

Jun 2017 - Jan 2019

Senior Project Scheduler (Claims Analyst)

New York, New York

Senior Scheduler for Arcadis Contract Solutions Division. Providing a service for clients in Avoiding, Mitigating and Resolving Construction Disputes and Claims. Expert in schedule/delay analysis, cause and effect impact analysis, productivity analysis, schedule development and change order evaluation and management.

Jun 2016 - May 2017

Project Controls Manager

Long Island City, Ny

New York City Department of Design and Construction (November 2015 –Present) Project Controls Manager for NYC Department of Design and Construction (NYCDDC). Assisting the Executive Director and Deputy Commissioner in establishing an Agency-wide program for governance and control of cost, schedule, and scope management in capital project delivery through the implementation of industry best practices, standard processes.Achieving the objectives of the Bureau of Project Controls by… Show more New York City Department of Design and Construction (November 2015 –Present) Project Controls Manager for NYC Department of Design and Construction (NYCDDC). Assisting the Executive Director and Deputy Commissioner in establishing an Agency-wide program for governance and control of cost, schedule, and scope management in capital project delivery through the implementation of industry best practices, standard processes.Achieving the objectives of the Bureau of Project Controls by assisting in the development of standardized project controls approach in managing projects; establishing and monitoring changes to baseline cost and schedule; accurately recording cost and schedule performance; managing risk effectively; effectively managing change and delay claims; and efficiently providing accurate project and program reports. Standard Operating Procedures and processes for scheduling, cost control, risk management, and estimating; developing performance metrics to track organizational success; ensuring consistency with the company Agency’s strategy, commitments and goals Show less

Dec 2015 - May 2016

Manager Of Project Controls Department

Ppl Generation, Allentown, Pennsylvania Area

PPL Generation, Manager Project Controls (2011 – October 2014) Manager of Project Controls for PPL Generation, Engineering and Construction group for capital projects. Responsibilities include control processes that encompass all aspects of financial management, business planning and reporting, financial reporting, project cost reporting, and Sarbanes Oxley compliance, including, but not limited to, contract administration, change management, purchase-to-pay cycle, and cost control; all… Show more PPL Generation, Manager Project Controls (2011 – October 2014) Manager of Project Controls for PPL Generation, Engineering and Construction group for capital projects. Responsibilities include control processes that encompass all aspects of financial management, business planning and reporting, financial reporting, project cost reporting, and Sarbanes Oxley compliance, including, but not limited to, contract administration, change management, purchase-to-pay cycle, and cost control; all designed to ensure the authorized use of and accurate reporting of corporate assets consumed on capital projects. Insure that processes are in place to effectively collect, evaluate, analyze, process and report, in a coordinated environment, all aspects of project development, engineering, construction, startup, controls and any other of the projects relative to cost, scope, quality, schedule and corporate compliance objectives. Show less

Jul 2011 - Nov 2014

Project Controls Manager

Ppl Generation, Allentown Pa

PPL Generation, Project Controls Manager (2005 – 2011) Rainbow Redevelopment and Great Falls Interconnection – Great Falls MT – Developed and monitored project budgets and schedules for a 60 MW hydroelectric project and replacement of twenty three miles of 100 KV power lines with substation improvements and a new 230 KV switchyard with a total combined project site, cost of $259M with a under run of $36M for both projects. Managed change order requests, risks, schedule and progress… Show more PPL Generation, Project Controls Manager (2005 – 2011) Rainbow Redevelopment and Great Falls Interconnection – Great Falls MT – Developed and monitored project budgets and schedules for a 60 MW hydroelectric project and replacement of twenty three miles of 100 KV power lines with substation improvements and a new 230 KV switchyard with a total combined project site, cost of $259M with a under run of $36M for both projects. Managed change order requests, risks, schedule and progress variances with assistance of two employees assigned at the project site provided invoice reviews and audits. Prepared monthly reports to senior PPL management.  Holtwood Redevelopment – Holtwood PA. Developed the initial project schedules, project estimates, and budgets with project director on a 60 Mw hydroelectric project. Obtained project authorization from senior management. Montour LLC, Scrubbers – Washingtonville PA. Site assignment and oversight for the EPC contractor project controls group, provided technical expertise related to the integration of scope, resource requirements, WBS, and cost estimating relative to the project plan. Provided technical expertise related to the integration of schedule, milestones, progress measurement and level three schedule monitoring. Provided technical expertise related to risk identification, evaluation and mitigation planning. Ensured accurate progress and schedule reporting from EPC contractor and monitored / audited invoices for proper progress payments. Project cost $565M. Show less

Nov 2005 - Jun 2011

Project Controls Manager

Fpl

Long Island Ny, Marcus Hook Pa, Thode Island

FPL Energy, Project Control Manager (2001 – 2005) Marcus Hook, PA - 1,750Mw Cogen – 3x1; 3-CT’s - GE 7 FA’s, 1-STG - Toshiba Extraction STG, 3-FW HRSG’s, 4-FW Aux Boilers. Assisted the owner in determining the project forecast cost which included the cost of the EPC, gas and electrical interconnection costs, commissioning/start-up costs and owner expenses. Developed with the owner start up manager a detailed start up and commissioning schedule to determine when plant systems needed to be… Show more FPL Energy, Project Control Manager (2001 – 2005) Marcus Hook, PA - 1,750Mw Cogen – 3x1; 3-CT’s - GE 7 FA’s, 1-STG - Toshiba Extraction STG, 3-FW HRSG’s, 4-FW Aux Boilers. Assisted the owner in determining the project forecast cost which included the cost of the EPC, gas and electrical interconnection costs, commissioning/start-up costs and owner expenses. Developed with the owner start up manager a detailed start up and commissioning schedule to determine when plant systems needed to be turned over in a cost optimized mode. Assisted in the auditing of subcontract and material invoices. Project cost in excessive of $750M. Jamaica Bay Peaking Facility, NYC, Project Control Manager – Provided detailed scheduling support and accurate cost forecasts for an Owner-as-Construction-Manager self-performed construction execution strategy on a Pratt & Whitney 55Mw dual-fuel gas turbine FT8 swift pack unit. Project was completed on time with a slight overrun, which was the result of the FDNY imposing new fire safety requirements in the design of the plant. The project cost was $60M, and executed in five months. Bayswater Peaking Facility, NYC, Project Control Manager – Resumed control over management of EPC contractor’s project controls department to determine real time costs and assisted FPLE management team in scheduling the project to a fast track recovery mode construction execution for a Pratt & Whitney 56MW natural-gas fired dual turbine FT8 twin pack unit. Project was executed by working closely with the subcontractors and union labor seven days per week, two shifts, which accelerated the project by ten weeks. The project cost of $58M was maintained, six months to construct and commission. RISEP, RI – 560Mw 2x1 configuration natural gas power plant, 2 – CT’s Westinghouse 501 FD2, 1- STG GE D11, duct firing on the Vogt HRSG’s. Project Control Manager – Assisted in the scheduling of the start-u Show less

Oct 2001 - Oct 2005

Project Controls Manager - Constructors

Perryville, Nj

Foster Wheeler Constructors, Inc., and Foster Wheeler USA, Project Control Manager (1993 – 2001) Jacksonville Electric Authority, Jacksonville, FL – Project controls manager for two-297MW CFB circulating fluidized bed boilers on pet coke, the two largest in the world at that time. Managed two specialists in the Home Office and a team of five in the field. Executed project estimate into control budget and initiated project controls systems and procedures at site. Project budget… Show more Foster Wheeler Constructors, Inc., and Foster Wheeler USA, Project Control Manager (1993 – 2001) Jacksonville Electric Authority, Jacksonville, FL – Project controls manager for two-297MW CFB circulating fluidized bed boilers on pet coke, the two largest in the world at that time. Managed two specialists in the Home Office and a team of five in the field. Executed project estimate into control budget and initiated project controls systems and procedures at site. Project budget $340M. Bay Shore Power Company, Toledo, OH – Project controls manager for a fluidized bed boiler and material handling systems. Initially the home office project control manager re-assigned to the field for 12 months to mitigate subcontract claims, and poor labor productivity. Assisted in the preparation and execution of detailed weekly schedules, assigned work lists, progress analysis of construction activities and system turnovers to the client. Prepared cost and schedule claims analysis for company. Project budget $200M. Advanced Silicon Materials, Inc., Butte, MT – Project controls manager for a Polysilicon/Silane Production Facility on a fast-track schedule. Supervised three home office staff and five site personnel with a project budget $500M. ISLA Refinery Upgrading Program, Curacao, SA. – Home office project controls manager for basic engineering on eight-margin improvement process units, ten environmental units, three safety units and offsite units. Detailed engineering and design accelerated on the FCCU unit for a March 1996 turnaround. Field assigned during the turnaround for scheduling support.  The Uno-Ven Co., 1994 Crude/Coker Turnaround Project - Senior EPC Project Scheduler to support a three-month, two-shift, seven days per week - capital improvement and maintenance upgrade. Maintained integrated project schedule and monitored daily subcontract schedules and progress during the plant shut down Show less

Jun 1993 - Sep 2001

Project Controls

H-R International Inc

Jamaica West Indies

H-R International Inc., Senior Scheduling/Cost Engineer in Jamaica, W.I. (1991 – 1993) Lurgi/Alpart – Jamaica Calciner/Filtration Relocation, Jamaica, West Indies. – Developed and implemented an EPC project schedule for a process plant which was dismantled in Baton Rouge, LA, and reassembled at the Alpart plant in Jamaica. Field assignment included scheduling, cost forecasting, change order control, material coordination, field supervision, quality control, safety and daily liaison with… Show more H-R International Inc., Senior Scheduling/Cost Engineer in Jamaica, W.I. (1991 – 1993) Lurgi/Alpart – Jamaica Calciner/Filtration Relocation, Jamaica, West Indies. – Developed and implemented an EPC project schedule for a process plant which was dismantled in Baton Rouge, LA, and reassembled at the Alpart plant in Jamaica. Field assignment included scheduling, cost forecasting, change order control, material coordination, field supervision, quality control, safety and daily liaison with owner and government officials. The project cost was $200M. Show less

Jun 1991 - May 1993

Project Engineer

Somerset, New Jersey

Turner Construction, Project Controls, Field Engineer, Superintendent, Procurement/Subcontracts (1987 – 1991) Project Controls Engineer on the following projects: $20M Proprietary Production Facility for Ortho Pharmaceutical $12M Grass Roots Postal Service Facility $24M Grass Roots 100 Rooms, Six Story Luxury Hotel for Claremont Associates $10M Renovation Work for the Newark City Museum. Field Engineer, Superintendent, Procurement Engineer on the following… Show more Turner Construction, Project Controls, Field Engineer, Superintendent, Procurement/Subcontracts (1987 – 1991) Project Controls Engineer on the following projects: $20M Proprietary Production Facility for Ortho Pharmaceutical $12M Grass Roots Postal Service Facility $24M Grass Roots 100 Rooms, Six Story Luxury Hotel for Claremont Associates $10M Renovation Work for the Newark City Museum. Field Engineer, Superintendent, Procurement Engineer on the following projects: $24M Grass Roots Three-Building/Four Story Interconnected Office Complex for the Sammis Company $12M Tenant Fit-Up for Dun and Bradstreet. Show less

Mar 1987 - May 1991
Team & coworkers

Colleagues at MBP (McDonough Bolyard Peck)

Other employees you can reach at mbpce.com. View company contacts for 331 employees →

2 education records

Christopher Barnas education

Bs, Construction Engineering

Activities and Societies: ASCE - American Society of Civil Engineers, Vice President Student Section I worked 32 hours per week during.

Education record

Stevenson High School, Livonia Michigan

Activities and Societies: Track & Cross Country

FAQ

Frequently asked questions about Christopher Barnas

Quick answers generated from the profile data available on this page.

What company does Christopher Barnas work for?

Christopher Barnas works for MBP (McDonough Bolyard Peck).

What is Christopher Barnas's role at MBP (McDonough Bolyard Peck)?

Christopher Barnas is listed as Project Manager / Senior Scheduler George Washington Bridge Program at MBP (McDonough Bolyard Peck) at MBP (McDonough Bolyard Peck).

What is Christopher Barnas's email address?

AeroLeads has found 1 work email signal at @mbpce.com for Christopher Barnas at MBP (McDonough Bolyard Peck).

What is Christopher Barnas's phone number?

AeroLeads has found 7 phone signal(s) with area code 908, 734, 570, 919, 703 for Christopher Barnas at MBP (McDonough Bolyard Peck).

Where is Christopher Barnas based?

Christopher Barnas is based in New York, United States while working with MBP (McDonough Bolyard Peck).

What companies has Christopher Barnas worked for?

Christopher Barnas has worked for Mbp (Mcdonough Bolyard Peck), Arcadis, Nyc Department Of Design And Construction, Ppl Corporation, and Fpl.

Who are Christopher Barnas's colleagues at MBP (McDonough Bolyard Peck)?

Christopher Barnas's colleagues at MBP (McDonough Bolyard Peck) include Jarrod Chafin, John Landrum, Pe Vma, Ellie Pang, Ronda Clark, and Henry Ong.

How can I contact Christopher Barnas?

You can use AeroLeads to view verified contact signals for Christopher Barnas at MBP (McDonough Bolyard Peck), including work email, phone, and LinkedIn data when available.

What schools did Christopher Barnas attend?

Christopher Barnas holds Bs, Construction Engineering from Lawrence Technological University.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Christopher Barnas you were looking for.

View similar profiles