Lean Production Engineer
Responsible for lead time reduction in manufacturing, SPTS process improvements resulted in an increase in turnover of 70% (2009-2011). MSc in Lean Operations (Manufacturing) 2009-2011; gaining experience at McLaren, Johnson and Johnson, Moog, Spirax Sarco, Vector Aerospace (UK) De Beers-Venetia mine and SABMiller (South Africa) Instrumental in SPTS employing a MBOM for operations. Introduced the Operation group to Lean and its toolsets, A3, VSM, visual management of KPI, Kaizen events, 5S and… Show more Responsible for lead time reduction in manufacturing, SPTS process improvements resulted in an increase in turnover of 70% (2009-2011). MSc in Lean Operations (Manufacturing) 2009-2011; gaining experience at McLaren, Johnson and Johnson, Moog, Spirax Sarco, Vector Aerospace (UK) De Beers-Venetia mine and SABMiller (South Africa) Instrumental in SPTS employing a MBOM for operations. Introduced the Operation group to Lean and its toolsets, A3, VSM, visual management of KPI, Kaizen events, 5S and continuous improvement activities; achieving a 30% reduction in both build and test cells with some work centre’s doubling their capacity. Show less