Piping Superintendent
CurrentCoordinated the piping fabrication, erection, and handover of various units, including the PPU Unit, Area 3, Spherical Tank Farm, and Fire Water network with installation of 54,000-inch diameter Phase 2 and the replacement of 50,000-inch diameter existing pipelines. Review isometric drawings and Material Take-Off (MTO) lists, prepare material requests to ensure timely availability of resources. Coordinating with the engineering team for necessary revisions to meet site requirements.Checked and coordinated the preparation of test packs to verify the integrity and safety of piping systems.Attended weekly meetings with three different subcontractors to discuss work fronts, manpower allocation, and prioritize issues to maintain project momentum to ensure seamless project execution and adherence to project timelines and quality standards.