Geotechnical Engineer
Current- Detour Lake Mine Cell 2 (Kirkland Lake Gold Ltd.; 2018-Present): o Provided quality assurance monitoring for our client during the construction of a tailings storage facility to ensure the contractor(s) were building.
- Diavik A21 Dike (Rio Tinto/DDMI; 2017): o Provided quality assurance support during construction of an in-lake perimeter dike. Verified and processed submittal data from the contractor to ensure the technical.