Constantin Beldiman Email and Phone Number
Constantin Beldiman work email
- Valid
- Valid
Constantin Beldiman personal email
- Valid
Experienced Senior Structural Engineer with a demonstrated history of working in the construction industry. Skilled in Software Aided Design, Communication, Design Management, Structural Engineering and Modern Methods of Construction. Strong engineering professional with a MEng focused in Civil Engineering from "Gh. Asachi" Technical University - Iasi, Romania.
Parmarbrook
View- Website:
- parmarbrook.com
- Employees:
- 22
-
Senior AssociateParmarbrook Jun 2023 - PresentEuropean Economic Area -
AssociateParmarbrook Jan 2021 - Jun 2023Gwgc+Xc London, United Kingdom -
Senior EngineerParmarbrook Mar 2017 - Jan 20214-8 Whites Grounds, London Se1 3La, United Kingdom -
Structural EngineerClancy Consulting Sep 2013 - Mar 2017London, United KingdomHounslow Civic Centre – Project manager and design team leader responsible for overall structural engineering design, co-ordination, and liaison at detailed stage for a new £60 million build Civic Centre Building. The scheme comprises a basement and seven upper floors, with a terrace amenity space at the fifth floor and plant on two levels at roof. Mapleton Crescent, Wandsworth – Project manager and design team leader for a 26 storey, 89 unit, residential tower for Pocket Living in the centre of Wandsworth. Stafford – Riverside, Bridge Street and Kingsmead – Structural Team Leader responsible for engineering consultancy services on 3 sites in Stafford - at Riverside, Bridge Street and Kingsmead.Cator Street - Extra Care and Centre of Excellence – Lead project engineer responsible for project development at detailed stage for two buildings located on same site. The Extra Care is a new development comprised of approximately 42 units including 39 single bedrooms and 3 two bedroom units. The proposed accommodation is generally 4 stories in height with no basement. The Centre of Excellence covered the refurbishment and extension of an existing building in order to meet the client requirements.Plaistow Hospital – Project lead engineer for a £40 million-pound redevelopment of site into various residential units including low rise and multi storey concrete framed buildings. Garage Sites – Project lead engineer on design and construct contract for a number of commercial and residential redevelopment schemes across London. Responsible the project progressing from concept to construction stage, involved in the immediate project management and taking a fast-track approach to design and detailing die to programme constrains, specifications and coordinating the production of structural drawings for a number of reinforced concrete frame structures. -
Assistant Structural EngineerMott Macdonald Jan 2012 - Sep 2013Croydon, United KingdomVictoria Station Upgrade (VSU) – A £700 million pound project aims to extend the existing South Ticket Hall (STH) and construct a brand new North Ticket Hall (NTH). VSU is a joint venture between Vinci and Bam Nuttal (VBN) with Mott MacDonald appointed as lead designers. Design engineer responsible for design and production of construction information of concrete structural elements to LUL and Highway’s Agency Codes of Practice, site engineer assisting the construction stage of the project.London 2012 Park and Ride Site Manager – Site Manager for Olympic Delivery Authority (ODA) Park and Ride Thurrock (Lakeside) site facilities. Duties included site setting-up based on the construction plans, ensuring the site performed as required by operation plans previously set in place by the management team, reporting the daily activities to MT, overseeing the activity of all subcontractors present on site and for H&S and incident report.Industrial Facility, Volgograd Russia – Engineer responsible for superstructure design for an extension to an existing industrial facility in Volgograd, Russia Doha Metro, Qatar – Part of a multidisciplinary team providing the tender design of the largest underground packages for Doha Metro project. The packages, Red Line North comprise over 13km twin-bore tunnels and seven underground stations in addition to two major flagship interchange stations up to 40m deep in highly urban environment. Design Lead Engineer responsible for structural design of three new underground railway stations. -
Assistant Structural EngineerMott Macdonald Jun 2011 - Jan 2012Hong KongP260 Midfield Concourse, Hong Kong International Airport (HKIA), Hong Kong – Six month assignment for Mott MacDonald Hong Kong; as structural engineer involved in the detailed design of the superstructure and foundation of Midfield Concourse, comprised 19 fixed link bridges and ancillary buildings. -
Graduate Structural EngineerMott Macdonald Sep 2010 - Jun 2011Croydon, United KingdomHeathrow Terminal 2 Concourse B Phase 2 – Project comprises a new satellite pier to be connected to the new Terminal T2A, which is replacing existing T2 and the Queen’s Building as part of the £2bn Eastern Campus programme of development. Assistant engineer responsible for detailed design of the internal substructure comprised in 3 sub-structure levels for TTS systems, flight connections and baggage handling basements. -
Graduate Structural EngineerMott Macdonald Aug 2007 - Aug 2010Belfast, United KingdomSecondment to Doosan Babcock Energy, Ratcliffe Power Station – SCR – Project engineer involved in the design of the structural supports for a new Selective Catalytic Reduction (SCR) system attached to an existing boiler house. Work included detailed steel design using Staad-pro software. Belfast Schools Public Private Partnership (Ashfield Girls School, Girls Model School, Grosvenor Grammar School) – Project structural engineer responsible for modelling three new secondary schools as part of the Belfast Schools Phase 1 public private partnership (PPP). The schools range from 650–950 pupils and two to three storeys high. The structures comprise steel frames with pre-cast hollowcore slabs. The schools were modelled using CSC Building Designer. The construction value for the three schools is approximately £60million. NWP Glenside, Recycling Facility – Structural lead engineer responsible for the detailed design of the superstructure. The frame comprised a single story steel structure approximately 120x50m on plan. Also responsible for the design and preparation of drawings for the reinforced concrete floor slabs, push walls, tunnel walls and associated suspended slabs, that support the 1550m2 self-contained bio-filter structure. Approximate value of development is £7.5 million. Musgrave Street Police Station and Multistorey Car Park – Structural engineer responsible for the detailed design of the superstructure. The building is a five-storey hardened structure (the building was hardened using concrete panels, which resist will a blast in the event of an explosion). The building was supported on CFA piled foundations, which were also used to provide geothermal heating and cooling via heating loops in the piles.Belfast Metropolitan College at Titanic Quarter – Project structural engineer involved in the design of the superstructure of a new five-storey college campus at Titanic Quarter in Belfast. The approximate cost of the building is £45 million. -
Graduate Structural EngineerSc Mihul Srl Apr 2006 - Jul 2007Iasi County, RomaniaMain duties and responsibilities included the design of new reinforced concrete framed buildings, and refurbishment of old masonry structures in order to meet current seismic requirements for Romania. Palas Development (Buildings A5 and E5) – Graduate structural engineer, part of a team involved in the design of several reinforced concrete buildings part of the Palas Commercial/Retail Development. The buildings comprised offices, residential accommodation and underground parking. Responsible for the design of the foundations using Prokon and superstructure using Robot Millenium. Prepared floor layout drawings and detailed the reinforced concrete elements. The A5 building was a four-storey structure with underground parking. The structure comprised reinforced concrete diaphragms mixed with precast girders that in turn support pre-stressed hollow core slabs. The E5 building was a two-storey structure, comprising two levels of car parking below ground level and two floors occupied by commercial and leisure facilities on upper floors. The structure comprises a reinforced concrete frame supported on piled foundations. The total cost of the development was £220 million. Romanian Ministry of Education, Research and Innovation – Graduate engineer involved in the structural analysis of several existing masonry structures, for the purpose of refurbishment and to meet current seismic requirements. Commercial Complex Niciman, Iasi – Graduate engineer involved in producing general arrangement drawings and structural details for a three-storey building. The structure was a reinforced concrete frame supported on ground beams/piles. Several Residential Buildings, Romania – Graduate engineer involved in carrying out the hand calculations for structural members and the preparation of drawings for a number of small residential buildings. The structures typically comprise reinforced concrete frames with masonry infill panels.
Constantin Beldiman Skills
Constantin Beldiman Education Details
-
"Gh. Asachi" Technical University - Iasi, RomaniaCivil Engineering -
National College "Mihai Eminescu", Iasi, RomaniaMathematics And Physics In English
Frequently Asked Questions about Constantin Beldiman
What company does Constantin Beldiman work for?
Constantin Beldiman works for Parmarbrook
What is Constantin Beldiman's role at the current company?
Constantin Beldiman's current role is Senior Associate at Parmarbrook.
What is Constantin Beldiman's email address?
Constantin Beldiman's email address is co****@****ail.com
What schools did Constantin Beldiman attend?
Constantin Beldiman attended "gh. Asachi" Technical University - Iasi, Romania, National College "mihai Eminescu", Iasi, Romania.
What skills is Constantin Beldiman known for?
Constantin Beldiman has skills like Structural Engineering, Staad, Steel Structures, Steel Design, Reinforced Concrete, Project Management, Autodesk Robot Structural Analysis, Tekla Structures, Design Management, Sustainable Design, Communication.
Who are Constantin Beldiman's colleagues?
Constantin Beldiman's colleagues are Amir Parmar, Ben Paterson, Rob Delahunty, Claire Washington, Jorge Ribeirinho Soares, Euan Napier, Sidney Sai Yin Leung.
Not the Constantin Beldiman you were looking for?
-
-
-
1gmail.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial