More than 18 years experience in the field of temporary works working mostly for large challenging projects in Europe and Middle East.With a strong focus on scaffolding and formwork, and worked with SGB, DOKA, PERI, RMD, ACROW, SATECO, HUSSOR, JALMAT and others.

Cornel Popa's Current Company Details
CPO Engineering

Cpo Engineering

View
Managing Director at CPO Engineering
iasi, iasi, romania
Employees:
6
Cornel Popa Work Experience Details
  • Cpo Engineering
    Managing Director
    Cpo Engineering Feb 2017 - Present
    Iasi County, Romania
    www.cpoengineering.com
  • Besix
    Head Office - Methods Engineer / Temporary Works Engineer
    Besix Sep 2015 - Nov 2016
    Brussels Area, Belgium
    • Preparing projects for tendering phase including site planning, tower cranes layouts and logistic planning, quantities and presentations for various types of buildings.The high profile projects studied were:• Cairo City Gate, Egypt• Gare de Namur, Belgium• BNP Paribas HQ in Brussels• Agro ParisTech, France• Qatar Foundation Stadium• Al Wasl Tower Sheikh Zayed Road, DubaiProviding/Giving Scaffolding and Formwork trainings together with my manager for BESIX employees in Dubai and Brussels (April 2016)
  • Besix
    Methods Manager / Temporary Works Manager
    Besix Apr 2013 - Sep 2015
    Cairo
    Mall of EgyptProject value: 300 million €• I was promoted manager starting November 2013.• Managing and monitoring the site methods team comprising of 6 Engineers and several subcontractor designer teams located in Egypt and UAE.• Oversaw the selection scaffolding/formwork systems for Ski Slope, Suspended Slabs and Access Scaffolding (Hanging, Bridging and Birdcage)• Set, implemented and monitored adherence to the budget for the formwork and scaffolding equipment.• Planned, prioritized and delegated workloads in alignment with project timeline while managing logistical issues associated with methods works.• Controlled and checked the design of formwork and scaffolding.• Coordinated access scaffolding shop drawings with all trades involved.• Reviewed, compared and approved subcontract offers.• Proactively identified, troubleshot and resolved site issues.• Defined and selected equipment for handling materials and systems mostly involving steel structure erection and MEP equipment installation.• Introduced and supervised a system of loading/striking permits for the load bearing scaffolding site wise.• Prepared methods of dismantling the tower cranes.• Prepared various method statements, risk assessments and calculation notes according to site requirements.
  • Besix
    Methods Engineer / Temporary Works Engineer
    Besix Feb 2012 - Apr 2013
    Abu Dhabi, United Arab Emirates
    Yas Mall ProjectProject value: 420 million €Defining and preparing work sequences for 2 Car Parks (~40.000m² each) and 3 other smaller buildings (~7.000m² each).Defining and selecting equipment for handling materials and systems.Identifying and establishing detailed equipment lists.Introducing and supervising a system of loading/striking permits for the load bearing scaffolding site wise.Preparing methods of dismantling the tower cranes.Proactively identified, troubleshot and resolved site issues.Prepared various method statements, risk assessments and calculation notes according to site requirements.Coordinating the temporary works with related suppliers and subcontractors.
  • Besix
    Methods Engineer
    Besix Jun 2010 - Feb 2012
    Abu Dhabi, United Arab Emirates
    Cleveland Clinic Abu DhabiProject value: 1.3 billion € Responsibilities: • Defined and prepared formwork phasing drawings.• Designed and prepared various formwork (straight walls, single sided, retaining walls, climbing• formwork) and scaffolding drawings including the related statical checks• Identified and established detailed equipment lists.• Proactively identified, troubleshot and resolved site issues.• Designed and prepared site installation drawings including crane location/relocation/bracing to the main structure and dismantling, hoists elevations and bracings to the main structure, loading decks, etc.• Designed and prepared various temporary works drawings and the related statically checks (load bearing scaffoldings, access / working platforms, etc)• Preparing various material comparisons.• Coordinated with 3D BIM team to analyze eventual clashes of the temporary works with the different trades (i.e. between hoists bracings and outer façade skin).• Closely supervised the erection of the steel structure for the 2 tower cranes on top of the building and the dismantling.
  • Doka
    Formwork Design Engineer
    Doka Mar 2008 - May 2010
    Bucharest And Iasi, Romania
    • Produced and insured drawings indicate the proper use of Doka forming equipment and that the drawings represent safe, economical and efficient design.• Provided analysis and design/price calculations as required.• Provided material lists for quotations and shipments to the site.• Conducting site visits to check the correct use of the formwork and the assembly procedure on sites.• Worked with sales to produce AutoCAD drawings during proposal stage and finalizing working drawings for site use, using DOKA forming systems.• Controlled and checked the design of formwork.• Conducted an AutoCAD trainings for my colleagues in the Technical Department at DOKA Romania.• Starting September 2009 I was appointed DokaCAD/TIPOS Key User for Romania for the before mentioned software troubleshooting across the country.• Formwork systems used: Frami, Framax Xlife, Top50, Dokaflex 1-2-4, Dokaflex Optimized, Load bearing towers Staxo, Doka supporting construction frames (for single sided walls), climbing formwork K,climbing formwork MF 240.• Types of projects: residential, industrial, office buildings, commercial complexes, water engineering, bridges.
  • Bouygues Construction
    Methods Engineer / Temporary Works Engineer
    Bouygues Construction Nov 2006 - Mar 2008
    Bucharest, Romania
    The Oaks – Residential ProjectProject value: 80 million € • I was working on site for a luxury residential complex in which the first phase consisted of 8 buildings with basement, ground floor and 4 levels.My main responsibilities were: • Preparation of the method statements, formwork phasing for concrete walls and floor slabs (DOKA Framax Xlife, Dokaset, Dokaflex 1-2-4), cranes elevation and updating the site management plan, under the supervision of the experienced methods engineer.• Document Control (Structural, Architectural and MEP drawings).• Shop drawings for the architectural department.
  • Mihul
    Structural Design Engineer
    Mihul Jul 2006 - Nov 2006
    Iasi County, Romania
    • Structural design (masonry and concrete), technical expertise and rehabilitation projects for old buildings.• Software used: AutoCAD and ROBOT.
  • -
    Technical Office Engineer
    - Jul 2005 - Jul 2006
    Iasi County, Romania
    • Bills of quantities for civil, bridges and railways constructions• Preparation of tender documents for civil, bridges and railways constructions.• Quantity surveying for civil, bridges and railways constructions.• AutoCAD drafting for civil constructions• I was preparing the bills of quantities and the tender documents with my hierarchical superior.• I collected the information from the field from the site engineers for all the departments in order to prepare the monthly statements for each site.

Cornel Popa Skills

Civil Engineering Concrete Autocad Engineering Construction Project Estimation Structural Analysis Steel Structures Bridge Earthworks Highways Road Surveying Engineering Design Contractors Microsoft Project Ms Project

Cornel Popa Education Details

Frequently Asked Questions about Cornel Popa

What company does Cornel Popa work for?

Cornel Popa works for Cpo Engineering

What is Cornel Popa's role at the current company?

Cornel Popa's current role is Managing Director at CPO Engineering.

What is Cornel Popa's email address?

Cornel Popa's email address is co****@****hoo.com

What schools did Cornel Popa attend?

Cornel Popa attended Gheorghe Asachi​ Technical University Of Iași, Vlerick Business School, Doka.

What skills is Cornel Popa known for?

Cornel Popa has skills like Civil Engineering, Concrete, Autocad, Engineering, Construction, Project Estimation, Structural Analysis, Steel Structures, Bridge, Earthworks, Highways, Road.

Who are Cornel Popa's colleagues?

Cornel Popa's colleagues are Carmen Elena Bitere, Vadim Timoșco, Marius Mosneagu.

Not the Cornel Popa you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.