Costi Cucu
AeroLeads people directory · profile

Costi Cucu Email & Phone Number

Commissioning and Start-Up at Crescent Petroleum
Location: Central Luzon, Philippines 16 work roles 1 school
1 work email found @crescent.ae LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email c****@crescent.ae
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Commissioning and Start-Up
Location
Central Luzon, Philippines
Company size

Who is Costi Cucu? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Costi Cucu is listed as Commissioning and Start-Up at Crescent Petroleum, a with 381 employees, based in Central Luzon, Philippines. AeroLeads shows a work email signal at crescent.ae and a matched LinkedIn profile for Costi Cucu.

Costi Cucu previously worked as Commissioning Supervisor at Crescent Petroleum and Commissioning Engineer at Air Liquide. Costi Cucu holds Diploma, Petrochemical Operation from Diploma In Petrochemical Operation.

Company email context

Email format at Crescent Petroleum

This section adds company-level context without repeating Costi Cucu's masked contact details.

{first_initial}{last}@crescent.ae
89% confidence

AeroLeads found 1 current-domain work email signal for Costi Cucu. Compare company email patterns before reaching out.

Profile bio

About Costi Cucu

• I have a demonstrated history of working in the oil and gas industry more than 30 years, the last 25 years being overseas in process commissioning, start-up and operation for LNG, Sulfur Recovery Unit, gas plant and refinery.• Please check detailed CV in the featured section of my Linkedin profile• Fully aware, following and re-enforce industry safety rules when working inside confined spaces, excavation, height, cold and hot work in green and brown field areas• Completely familiar with the SIMOPS and Electronic Permit to Work System (MAXIMO and E-PTW-Australia), I was part of the Incident and Injury Free Leadership Team of Cabinda Gas Plant Enhancement Project in Angola• Able to plan and deliver on the job training in multicultural environments • Diploma in Petrochemical Operation – 1986, Romania• LNG training course – 2002; Constanta, Romania• Kongsberg Maritime K-Chief 700 DCS - May 2017, Singapore• OPITO - BOSIET - June 2017, Singapore• OPITO - MEMIR - June 2017, Stavanger, Norway• OPITO - On Scene Commander - September 2017, Johor Bahru, Malaysia• Quantity Surveying Building Estimation with AutoCAD and Excel - October 2020, online certification• AutoCAD Certified Professional preparation - October 2020, online certification• Valve testing training, using METRUS MPU 600 - January 2022, Calamba, Philippines• Computer literate – Microsot Office, OSIsoft PI, Active Factory, Kongsberg K-Chief 700-1 and K-IMS, Autodesk Navisworks• Language abilities: English - Professional Working Proficiency• Driving licenses: Romania, Nigeria, Oman, Philippines======Health status: double vaccinated with Moderna and Pfizer booster dose

Listed skills include Commissioning, Gas, Refinery, Lng, and 45 others.

Current workplace

Costi Cucu's current company

Company context helps verify the profile and gives searchers a useful next step.

Crescent Petroleum
Crescent Petroleum
Commissioning and Start-Up
sharjah, sharjah, united arab emirates
Website
Employees
381
AeroLeads page
16 roles · 41 years

Costi Cucu work experience

A career timeline built from the work history available for this profile.

Commissioning Supervisor

Current

Kurdistan

· Initially based in UAE at main contractor's office to review and develop commissioning and start-up procedures for a 250 MMSCFD gas plant/LPG recovery, located in Kurdistan· Electronic P&ID mark-up of project systems and sub-systems· Created high quality electronic PFD for the project, using Visio· Supervise the short and long term preservation activities· Perform as Area Authority for issuing the daily PTW

Jul 2022 - Present

Commissioning Engineer

Calamba, Calabarzon, Philippines

Commissioning and start-up of one MAC then FULL MODE Performance Test for the initial project - completed=========== Investigation of Nitrogen generation unit upset and spurious trips (different project/location) - Done

Jan 2022 - Mar 2022

Commissioning Engineer

Calamba, Calabarzon, Philippines

· Commissioning and start-up of a Nitrogen generator unit - Completed· MS towers for the air purification unit inspected prior to first fill with catalyst, then filled with Alumina and Molecular Sieve, completed vessels closure· Cold Box filled with Perlite, completed vessel closure· Systems taken over from construction, prepared and performed the air blowing, final reinstatement and tightness test· Reviewed DCS pages, evaluate Alarm Management System - SCADA Centum VP by Yokogawa· DCS sequence simulation and validation· Main Air Compressors, made by IHI Sullair, surge points testing - completed· Alumina / Molecular Sieve towers exceptional reactivation - completed· Recycle Air Compressor, made by Ingersoll Rand, surge points testing - completed· Nitrogen Generator Unit HALF mode performance test - completed

Jul 2021 - Oct 2021

Searching For A Job

Around The World

· Since February 2020 I have taken the opportunity to raise my level of knowledge meanwhile searching for a new assignment· I have completed the training for Digital Transformation, Quantity Surveying with AutoCAD and Excel, as well Essential Training and preparation for AutoCAD Certified Professional

Feb 2020 - Jun 2021

Automotive Technician

Thony Auto Electronics

San Fernando, Philippines

· While searching for a job, I was doing maintenance, diagnose and troubleshoot electrical, electronics and mechanical parts of light vehicles and heavy equipment· Injectors removal, cleaning, repair, testing and reinstalling· Sensors, control panels, dashboards, ECU repair and spare parts replacement· Excavators: Hitachi, Kobelco, Caterpillar, Komatsu· Heavy trucks: Isuzu, Hino, Mitsubishi Fuso, Hyundai· Light vehicles: Toyota, Mitsubishi, Nissan, Honda

Mar 2021 - May 2021

Commissioning Engineer - Mozambique Lng

San Donato Milanese, Lombardy, Italy

· Based in San Donato Milanese at Saipem headquarter office to develop pre-commissioning and commissioning documentation, assist discipline Engineering department when requested· 3D model review· P&ID review· HAZOP study

Sep 2019 - Jan 2020

Liquefaction Supervisor - Hilli Episeyo

Norway, Singapore, Cameroun

World's first converted floating LNG production facility· Based in Oslo at Golar LNG headquarter to develop marked-up P&ID and operating procedures, using Simplified Technical English – ASD-STE 100, performed process simulator Cause & Effect testing· Relocated to Singapore for pre-commissioning and commissioning, I have witnessed the installation of Sulzer Mellapak and completed internal inspections for torque and cleanliness of Amine Contactor, Amine Stripper, Heavies Fractionator for the final closure, Cold Box internal inspection and final closure prior to Perlite filling· Offshore assignment, sailed with FLNG Hilli Episeyo to Cameroun, completed commissioning activities on the way, refrigerant offloading to make-up drums, system first fills, dynamic runs and initial operations· Hilli Episeyo FLNG safely arrived and has been stationed offshore near Kribi, I have participated in the hookup activities, pipeline de-watering, tightness testing and Oxygen freeing before bringing the gas in· Prepared documentation and final dossier for equipments and units handover as part of the Operational Readiness and Assurance program· Carried out unit PSSR prior to startup· Flare start-up and First Gas IN – all A-OK, LNG rundown from the world’s first converted Floating LNG production facility, based on PRICO® single-mixed refrigerant process, developed by Black & Veatch USA· Prepare electronic marked-up P&IDs, upload documentation for Lock-Out/Tag-Out and Isolation Confirmation Certificate ready for review & approve in MAXIMO 7.6 then confirm Isolation Completed status and field safe condition in preparation for Hot or Cold Permit To Work to be issued· Set-up K-IMS trends and dashboards: Kongsberg Information Management System for process monitoring from remote computers· On Scene Commander in case of emergency

Oct 2016 - May 2018

Project Team Lead - Personal Greenhouse

Digital Green Thing Solution

Filipesti, Onesti, Romania

I have fitted my personal greenhouse with Arduino and Raspberry Pi automation in order to open/close the louvers based on inside/outside temperature, as well controlling the water tank level with a HC-SR04 ultrasonic sensor and provide the right amount of water to the plants using soil humidity sensor

Jul 2016 - Oct 2016

Operation Team Lead - Chuandongbei Gas Project

Nanba, Sichuan, China

· Reviewed Sulfur Forming Unit Standard Operating Procedures and perform field validation together with the Operation team, done On the Job Training and conduct final assessment review before handover.· Participated in construction completion walk down and commissioning activities, PSSR, raised punch list and clear them, performed internal inspection for equipment before final closure, prepared Sulfur Granulating Process units Sandvik & Sunup to receive liquid Sulphur.· Prepared documentation For Sulfur Forming Unit and carried out Operational Readiness walk down with the ORA team· Developed user-friendly interface displays and hook-up all units using OSIsoft PI and Process Book software for remote access and real-time data monitoring of Sulfur Forming Unit and utilities.· Start-up, shut down and prepare units for maintenance

Sep 2014 - Jul 2016

Commissioning Engineer - Oman North Projects

Safah & Wadi Latham, Oman

· Developed pre-commissioning, commissioning and start-up systems, strategy and procedures in various OXY Oman North expansion projects: 2x10 MW Solar Turbine Titan 130 power supply with all associated utilities, Condensate Stabilization Units, Glycol Dehydration Units, Instrument Air Supply Atlas Copco GA45+, field supervision of commissioning and start-up activities of crude oil heaters, glycol bath, de-salter heater, three phase oil separators, various types of pumps and compressors· Coordinated all activities of oil heater repair, ASME re-certification, prepare Scope of Work for contractors, function test and preparation for re-commissioning and start-up, schedule and advise contractors· Early involvement in Front End Engineering & Design and HAZOP reviews· Witnessed Factory Acceptance Tests as needed, participate and complete Site Performance Tests· Prepared PSSR, documentation and final dossier for projects handover to Operation.

Sep 2011 - Sep 2014

Field Engineer - Cabinda Gas Project Enhancement

Malongo, Cabinda, Angola

· Act as single point of contact for Site Execution Team and Contractor's personnel in final preparation of Work Packs for Work Authorization and coordinated with the Lead QA/QC department to ensure red-line mark-ups of Issued for Construction drawings, weld-maps and material traceability documents are completed by the Contractor and submitted to CGPe Document Control· Provided support and assistance to Commissioning and Start-up teams· Maintained a photographic record of project progress for use in weekly and monthly reports

Sep 2010 - Sep 2011

Commissioning Specialist - Cabinda Gas Project

Malongo, Cabinda, Angola

· Based in Houston at CB&I headquarter to develop pre-commissioning and commissioning procedures for Cabinda Gas Plant Project in Angola· Moved to Malongo, Angola, to implement all procedures for pre-commissioning and commissioning, performed vessels and columns internal inspections for torque, cleanliness and conformity to project design, rotating equipment preservation check until start-up, conduct Pre-Start-up Safety Reviews (PSSR) and yellow lining the systems prior to start-up.· Taken regular trips to offshore facilities (Takula Gas Processing Platform) for pipeline de-watering, pigging, tightness test and Oxygen freeing· Commissioning and start-up of all utilities, tightness test and air freeing the process systems, load runs for rotating equipment, complete first fills and establish systems dynamic circulation for the Dresser-Rand Feed Gas Compressor, TEG system, Gas Sweetening (Amine) system, Propane Refrigeration system (Toromont) and Hot Oil system, performed refractory dry-outs for Hot Oil heater, Acid Gas Incinerator and NGL dehydration regeneration heater

Dec 2008 - Sep 2010

Sulphur Recovery Unit Team Lead

Tengiz, Kazakhstan

· Procedures review, vessels, towers and reactors inspections· Verification and working off of punch items. Assisting with safety reviews, operability audits and engineering issues for the client to ensure project completion as per safety in design criteria according to the project specification. · Commissioning and start-up of Claus Air Blowers (KK&K blower driven by Siemens high pressure steam turbine and KK&K blower driven by electrical motor· Commissioning and start-up of Claus Combustion Chambers provided with HEC burner management system, Waste Heat Boilers for heat recovery, Boiler Feed Water pumps driven by both Dresser Rand high pressure steam turbine and electrical motor· Commissioning and start-up of Hydrogenation Reactor with HEC burner management system and a Thermal Oxidizer Unit - PCC Sterling BMS with Allen Bradley control · Work progress reporting to Construction manager and Sulphur Recovery Unit coordinator.

Sep 2007 - Oct 2008

Commissioning And Start-Up Supervisor

Bonny Island, Nigeria

· Pre-commissioning, commissioning & startup of Nigerian LNG, a 12.000 tons/day each train 4, 5 & 6, also a Jetty LNG/LPG ship loading facilities, systems preparation for tie-in connection between existing three running trains with new ones, punch listing, mechanically cleaned pipe inspection, hydro-testing, flushing, air blowing, Nitrogen purging, tightness testing, run-in test for rotating equipment, Soda ash wash on the Amine unit, Nitrogen drying and defrosting the Cold End units before start up, start-up Amine circulation unit with filtration package for CO2 removal, pre-coating of activated MDEA filtration unit, start-up a chilling system with propane Siemens compressor· Participated in commissioning and startup of Mixed Refrigerant & Propane Refrigerant helper motors and compressors (Frame 7 turbines with Nuovo Pignone compressors and Mark VI control), start-up of electrically driven reciprocating gas compressor for molecular sieves dryer’s regeneration· I was trained in flawless start-up initiative; I have gathered all equipment data, forms and documents to create a data base with a click & go user friendly interface, to be used in train 6 start-up activities.

Jan 2005 - Oct 2007

Shift Supervisor - On The Job Trainer

Soku Gas Plant, Nigeria

· Pre-commissioning, commissioning, start up and operating a 700 MMSCFD gas plant located offshore on an artificial island in the middle of Niger Delta.· Activities included: cleaning, flushing, purging, venting, draining, air-freeing, leak tests, hydraulic tests, blowing, tightness testing and punch-listing of condensate storage tank, condensate stabilization units, glycol regeneration packages and Associated Gas/Flash gas turbine compression units, blow down and shut down valves stroking, OSD, ESD & Fire and Gas systems loops testing, run-in testing of rotating equipment (Instrument/Utility Air Compressor, glycol pumps, condensate export pumps, fin-fan coolers, flare blower, methanol injection, anti-foam, pH adjuster, scale inhibitor pumps), energizing and de-energizing LV rotating equipment from Main Sub-station, commissioning and start-up of heating medium furnaces. · Ensuring proper functioning of the gas dehydration and glycol regeneration, managing 3 gas turbine power generators (Solar Turbine - Taurus 60) and 3 gas turbine compressors (Alstom Gas Turbine - LM 1600 - Demag - Delaval). · Taken daily trips offshore to the Niger Delta to inspect and perform first line maintenance for the gas wells · I have spent also one year in an offshore flow station platform for startup and operating Waukesha - Dresser-Rand Compressor, On the Job Training of the Nigerian trainees in flow stations operation and first line maintenance. · Both gas plant and flow station are ISO 14001 certified.

Jul 1999 - Nov 2004

Foreman

Rafo Sa Onesti

Onesti, Bacau, Romania

1995-1999Gasoline Hydro-fining Plant & Catalytic Reforming Plant - Rafo S.A. Onesti, RomaniaPosition: Foreman1993-1995Catalytic Reforming Plant - Rafo S.A. Onesti, RomaniaPosition: Chief Operator1990-1993Gasoline Hydro-fining Plant - Rafo S.A. Onesti, RomaniaPosition: Chief Operator1987-1990Catalytic Reforming Plant - Rafo S.A. Onesti, RomaniaPosition: Panel Operator1986-1987C.D.U. - V.D.U. and Catalytic Reforming Plant - Rafo S.A. Onesti, RomaniaPosition: Field Operator

1986 - 1999 ~13 yrs
Team & coworkers

Colleagues at Crescent Petroleum

Other employees you can reach at crescent.ae. View company contacts for 381 employees →

1 education record

Costi Cucu education

  • Diploma In Petrochemical Operation
    Diploma In Petrochemical Operation
    Petrochemical Operation
FAQ

Frequently asked questions about Costi Cucu

Quick answers generated from the profile data available on this page.

What company does Costi Cucu work for?

Costi Cucu works for Crescent Petroleum.

What is Costi Cucu's role at Crescent Petroleum?

Costi Cucu is listed as Commissioning and Start-Up at Crescent Petroleum.

What is Costi Cucu's email address?

AeroLeads has found 1 work email signal at @crescent.ae for Costi Cucu at Crescent Petroleum.

Where is Costi Cucu based?

Costi Cucu is based in Central Luzon, Philippines while working with Crescent Petroleum.

What companies has Costi Cucu worked for?

Costi Cucu has worked for Crescent Petroleum, Air Liquide, Around The World, Thony Auto Electronics, and Saipem.

Who are Costi Cucu's colleagues at Crescent Petroleum?

Costi Cucu's colleagues at Crescent Petroleum include Arez Xabat, Sarwar Omer Abdalrahman, Rajagopal Asokan, Santhosh Varghese, and Onofre Dumaguing.

How can I contact Costi Cucu?

You can use AeroLeads to view verified contact signals for Costi Cucu at Crescent Petroleum, including work email, phone, and LinkedIn data when available.

What schools did Costi Cucu attend?

Costi Cucu holds Diploma, Petrochemical Operation from Diploma In Petrochemical Operation.

What skills is Costi Cucu known for?

Costi Cucu is listed with skills including Commissioning, Gas, Refinery, Lng, Petroleum, Hazop, Oil And Gas, and Pumps.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Costi Cucu you were looking for.

View similar profiles