Engineer 1 (Dsbn)
CurrentDesigned and drafted underground electrical distribution facilities to satisfy expansion requirements as well as replace, as necessary, collapsing infrastructure. Both were done in support of providing Florida Power & Light customers with unparalleled, uninterrupted reliable electrical service.• Completed over seventy new Plan and Profile drawings for large-scale Duct Bank projects in the heavily congested underground streets of Miami Beach. These completed initiatives provided detailed placement of more than 27,500 feet (5.2 miles) of new duct bank and identified an anticipated expenditure of 77,500 construction man hours.• Enhanced and created new processes and strategies that better contain design costs and allow more timely production of permit drawings. Results leveraged a combination of As Built drawings requested from the city, existing FPL drawings, Google EC, Google Maps and inputs from the Miami-Dade property appraiser’s office all brought seamlessly together through the application of enhanced AutoCAD functionality.