Project Coordinator, Energy Management
Current•Developed project schedule, budget and played an integral role in the development of a proposal to access $15.7 million from Infrastructure Canada (GICB) to implement the Zero Carbon Retrofit of Susan Fennell Sportsplex •Provided guidance as technical committee member to develop a public RFP to recruit an ESCO to design and implement the Zero Carbon Retrofit of Susan Fennell Sportsplex, reviewed design documents and guided selection of GHG reduction measures and development of M&V plan to verify savings •Developed RFPs and reviewed consultant proposals, contracts, LCCA, project plans, design/specifications documents, as-built drawings, shop drawings, energy models, parametric analysis, M&V plans for multiple construction projects •Provided technical/professional knowledge advice/guidance for development and implementation of several net-zero, net zero ready (LEED, ZCB Design and Performance), new/retrofit, state of good repair or expansion construction/engineering projects implemented by the Building Design and Construction, Recreation or Facilities Operation and Maintenance departments•Coordinated and Administrate the City’s Building Automation Systems (BAS) portfolio (JCI Metasys, Delta EnteliWEB, Siemens, Web Control, etc.) to implement new systems, upgrades, support operations, business continuity and ensure that BAS/HVAC systems are up to date, secure, efficient, accessible (onsite/remotely) and in a state of control 24/7 at the City’s facilities•Conducted site visits to support installation, commissioning, inspections of BAS/HVAC/EVSE equipment, conduct root cause analysis and resolved operational issues in coordination with other stakeholders as necessary•Worked collaboratively with internal departments, clients/vendors/stakeholders and provided technical/professional recommendations to senior management to ensure projects were in alignment with the City’s standards, GHG reductions strategy and Federal/Provincial Codes/Standards/Targets