Project Engineer
Dallas/Fort Worth Area
During my time with Beck I was a Project Engineer on a six person team working to resurrect a stalled out project that had fallen victim to the 2008 economy crash. The end result was the Sheraton McKinney hotel (http://www.sheratonmckinney.com/) located in McKinney, TX. My project engineering responsibilities included: developing steel shop drawings around existing piers and inconsistent anchor bolt patterns, reviewing shop drawings for post-tensioned concrete floors and procuring material/manpower, quality control of rebar and post-tensioning cable placement in elevated slabs, creating a steel lintel and relief angle plan with the mason and structural engineer, and implementing a punch list system powered by Field360 and QR codes. My management responsibilities included: the door and hardware scope of work including access controls, the elevator scope of work for both hydraulic and electric elevators, working with high-end craftsmen for the custom millwork features designed by the interior designer, the operable partition scope of work, and all other interior finishes including paint, vinyl wallcovering, carpet, tile, and finish carpentry.