Various Positions
Various Engineering Positions 1977-1984
Various
1983 to 1984 PULLMAN POWER PRODUCTS Perry Nuclear Power Plant, Perry, OHLead Field Engineer/Mechanical Supervised (15) Field Engineers engaged in resolution of pipe support installation problems. Implemented a "3-phase" inspection program, and an "accelerated" hanger installation program which was based on teams composed of: a Design Engineer, a Field Engineer, a Q.C. Inspector, and a Craft Foreman.1981 to 1982 STUBBS OVERBECK AND ASSOC., INC.Texas City, TXProject Civil/Structural Engineer Provided Design and Project Engineering functions on various Petro-Chemical projects. Supervised group of (5) designers and draftsmen. Designed pipe/equipment supports and support structures, foundations, building additions and plant roads.1977 to 1981 PULLMAN POWER PRODUCTS (assignments below)Field/Construction Engineer (Indiana and Michigan Generating Station, Rockport, IN) during construction of a 1037' slip-form chimney. Provided technical direction to craft, responsible for configuration/quality control, lines/grades, inspection and safety program. Field/Construction Engineer (Sequoyah Nuclear Plant, Soddy-Daisy, TN)During construction of (2) 460' natural draft cooling towers. Responsible for planning/scheduling construction activities, field changes, inspection/material testing, and technical direction to subcontractors (> 100-man craft work force). Mechanical/Piping Engineer (Home Office, Williamsport, PA)Provided Engineering support for fabrication of piping systems for the Perry Nuclear Power Plant. Responsibilities included: preparing Design Engineer's drawings for fabrication, checking fabrication assembly drawings, and review, revision and approval of field isometric (installation) drawings.