Dale Blake Email and Phone Number
Dale Blake work email
- Valid
Dale Blake personal email
Dale Blake phone numbers
Dale Blake is a Sargent and Lundy Site Project Coordinator at Duke Energy / NOVA Technical Services. He possess expertise in power plants, project engineering, engineering, power generation, energy and 40 more skills.
-
Sargent And Lundy Site Project CoordinatorSargent And Lundy Engineering Apr 2017 - PresentCoordinate Project development, engineering and implementation of Sargent and Lundy projects at Surry Nuclear Power Station. Projects include large transformer replacements and Cyber Security projects.
-
Sargent & Lundy Site Project Coordinator - Surry Power StationSargent & Lundy Engineering Apr 2017
-
Electrical & I&C EngineerDuke Energy / Nova Technical Services Jan 2016Charlotte, North Carolina, UsLead Electrical & I&C Engineer for Head Replacement Project and IDS Replacement Project for Shearon Harris Nuclear Power Station. -
Re And Site CoordinatorDominon / Sargent & Lundy Aug 2014 - Jan 2016Responsible Engineer (RE) and Site Coordinator for a large transformer replacement project for Surry Power Station.
-
Project AssociateSargent & Lundy / Dominion Power Apr 2013 - Jan 2014Responsible Engineer for the large transformer replacement project for Surry Power Station and North Anna Power Station.
-
Electrical & I&C EngineerProgress Energy Aug 2011 - Mar 2013Raleigh, Nc, UsElectrical & I&C EngineerResponsible Engineer for ISFSI Project Engineering Changes. Responsible for electrical design and field implementation of ISFSI facility security systems, Temperature Monitoring and power systems, removal and reinstallation of electrical interferences for Auxiliary Building structural upgrades and design and installation of a new fuel handling crane designed for elimination of single failure issues.Responsible Engineer for Spent Fuel Pool Level Instrumentation design and installation for Fukushima upgrades. -
Project Site Manager – North Anna Unit 3 Site SeparationDominion Oct 2009 - Aug 2011PROJECT SITE MANAGER – NORTH ANNA UNIT 3 SITE SEPARATIONWork with North Anna Unit 3 Project on Site Separation phase to oversee preparation of design changes and commercial packages for construction of new facilities for North Anna Nuclear Site Services personnel and a new telecom and security system. Set up site facilities and coordinate and manage site construction and contractors. Retired from Dominion.
-
Supervisor Of Construction EngineeringDominion Dec 2005 - Oct 2009Manage a group of ten Construction Engineers and QA Personnel. Responsible for Nuclear Site Services document control, NSS project control, engineering reviews and approvals, NSS Quality Assurance, NSS training, management of miscellaneous plant upgrade and repair projects, Human Performance for NSS and development of engineering for station projects and repairs outside of the power block.Managed multiple projects for Surry Power Station including installation of a new Safety Building, an upscale executive conference room, a new paint oven facility and a new paint shop HVAC system.
-
Electrical / I&C Project ManagerDominion Nov 2004 - Dec 2005Security upgrades and modifications for Surry, North Anna and Millstone Power Stations. Manage design and installation of a fast track, fifty million dollar security power and camera / alarm system upgrade to meet NRC regulations. Successfully completed within NRC mandated time line.
-
Electrical & I&C Project EngineerDominion Jun 2002 - Nov 2004ELECTRICAL & I&C PROJECT ENGINEERElectrical and I&C Project Manager for Reactor Head Replacement Project for Surry and North Anna Power Stations. Responsible for complete electrical installation modifications for head replacements and project Facility setup at Surry and North Anna Power Stations including electrical, communications and data systems and networks. Was responsible for all Photography and Video for project.
-
Electrical SpecialistBrandt Engineering Jun 2000 - Apr 2002Electrical design and project coordination for supermarkets, industrial, commercial, agricultural and telecom facilities.
-
Electrical Project EngineerLee Tedhnologies, Inc. Aug 1999 - Jun 2000Develop emergency power system designs for 24-7 operation for new and existing facilities. Perform field surveys and document reviews required to interface new emergency equipment with existing systems. Review vendor drawings for accuracy, content and compliance with design requirements. Assure that vendor drawings correctly interface equipment supplied by Lee Technologies with the client facility. Coordinate design requirements with client, vendors, contractors and Project Managers. Manage and coordinate field installation of critical power systems provided by Lee Technologies.
-
I&C EngineerVirginia Power Feb 1999 - Aug 1999Y2K reviews for Surry & North Anna Power Stations.
-
Senior EngineerStone & Webster Engineering Dec 1998 - Feb 1999Millstone Power Station; assigned to color separation and redundancy issues group for startup effort.
-
Senior Facilities EngineerGateway Computers, Hampton, Va Aug 1997 - Nov 1998Responsible for all building systems and structures in a 400,000 sq. ft. manufacturing facility. Developed and implemented an Electrical PM Program for the facility. Designed and installed a 2000KW Diesel Generator and a building management system to control load and provide for load shedding. Responsible for supervising the plant electrician and three maintenance technicians. Update facility drawings using AutoCadd. Managed, completed and closed out a 6.5 million-dollar expansion project for the facility. Develop and maintain maintenance and operating budget.
-
Electrical I&C EngineerVirginia Power Sep 1996 - Aug 1997Develop Design Packages for Surry and North Anna Power Stations. Perform RG 1.97 Audit for Surry and North Anna Power Stations. Complete review of Surry Annunciator System for development of a design change package to replace this system with a new annunciator system. Led team and completed Type 1 Study for rework and repair of the Oxygen Monitoring System for the Surry Power Station Waste Gas Decay System.
-
OwnerUnderwater Adventures, Inc., Oct 1994 - Dec 1996Managed and operated a full service SCUBA sales, service and training facility. Employed 3 full time employees and 4 part time employees.
-
Associate Senior Principle EngineerStone & Webster Engineering Dec 1995 - Aug 1996Develop Design Packages for Salem Restart Effort. Packages include Condensate Pump Trip Circuit Modification, Fuel Rod Hoist Modification, Heat Trace Panel Replacement, Rod Position Indication System Modification, Diesel Start Modification, Turbine Vibration Monitoring System and Control Room HVAC Modification.
-
Senior Staff EngineerVirginia Power Oct 1984 - Sep 1994Develop Design Changes and provide Field Support. Appendix R Coordinator and Fire Protection Engineer for Surry Power Station. Provide resolution for station electrical system and component problems. Positions Held:>Supervisor of Electrical Engineering>Senior Staff Electrical Engineer>Supervisor of Construction Engineering>Senior Staff Electrical DesignerAccepted Voluntary Separation Package to pursue Self-Employment.
-
Senior Electrical DesignerStone & Webster Engineering Feb 1984 - Sep 1984Provide field support for electrical installation of Appendix R and RG 1.97 modifications. Develop DCP's on site and follow to completion.
-
Senior Electrical DesignerSpiers And Waltz Consulting Engineers Feb 1983 - Feb 1984Complete electrical design for commercial and industrial projects, including lighting, power, controls, communications and distribution.
-
Senior Electrical DesignerStone & Webster Engineering Aug 1981 - Dec 1982Provide electrical support for field installation of Design Change Packages for TMI Modifications.
-
Electrical SupervisorNewport News Shipbuilding & Drydock Co. Feb 1976 - Sep 1981Design and install large electrical projects for support of shipyard activities. Completed design and project installation for Carrier Outfitting Pier and Computer Center Power Modification.
-
OwnerBlake'S Electrical Service Sep 1973 - Jan 1976ELECTRICAL CONTRACTOR, HAVC & REFRIGERATION
-
Master ElectricianNewport News Shipbuilding & Drydock Co. Jan 1971 - Sep 1973
-
Electrical ApprenticeNewport News Shipbuilding & Drydock Co., Sep 1967 - Jan 1971Completed an Electrical Apprenticeship with Newport News Shipbuilding which included installation of shipboard electrical systems, plant electrical systems design installation and maintenance and Facilities Design.
Dale Blake Skills
Dale Blake Education Details
-
Newport News Shipbuilding And Drydock Apprentice SchoolElectrical
Frequently Asked Questions about Dale Blake
What company does Dale Blake work for?
Dale Blake works for Duke Energy / Nova Technical Services
What is Dale Blake's role at the current company?
Dale Blake's current role is Sargent and Lundy Site Project Coordinator.
What is Dale Blake's email address?
Dale Blake's email address is da****@****rgy.com
What is Dale Blake's direct phone number?
Dale Blake's direct phone number is +175788*****
What schools did Dale Blake attend?
Dale Blake attended Newport News Shipbuilding And Drydock Apprentice School.
What skills is Dale Blake known for?
Dale Blake has skills like Power Plants, Project Engineering, Engineering, Power Generation, Energy, Electricians, Electrical Engineering, Power Systems, Instrumentation, Project Management, Construction, Factory.
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial