High Voltage Technician
CurrentResponsibile for the operations and maintenance of one 345 KV – 34.5 KV substation and two 230 KV - 34.5 substations, the associated underground collection system and 45 miles of transmission line for all the stations. These stations serve to supply power to and collect power from 350 wind turbine generators that produce a total of 600 MW. My.