Project Manager - Capital Projects Group Crude Terminals And Pipelines
Houston, Texas, Us
As Project Manager, I directed end-to-end construction of important capital projects valued at $10M+. I managed safety, construction, and commissioning for the projects by implementing appropriate ASME/API standards, PSM, and DOT regulations along with company specifications and best practices: Projects I managed in this role:• Wink Pipeline, Wink, TX, (09/2018 – 12/2019): Directed construction of pipeline of 7 mi of 20” with DRA skid and clamp meter for project valued at $13.7M• Wink Exxon Pump Station, Wink, TX, (09/2018-12/2019): Managed project valued at $19.5M to be owned and operated by Exxon. Oversaw installation of 2X 1,500 HP pumps, PEC building, PD meter skid, and surge skid. • Bryant G Phase 2 Pump Station, Midland, TX, (09/2017 – 08/2019): Supervised installation of 75K bbl crude oil tank, two 200 HP booster pumps, two 1K HP mainline pumps capable of generating 85K bbl per day and associated control systems. Project was worth $16.3M. • Devon Phase 2 Gathering System, Lea County, NM, (02/2017-09/2020): Managed fitting of 16 mi of 8” gathering lines, 12 LACT measurement skids, and storage tank of 30K bbl on land jointly owned by private parties, State of New Mexico, and BLM authorities for project valued at $36M. • Bryant G. to Midland Phase 1, Midland, TX (09/2016-05/2017): Supervised project worth $22M to install16.2 mi of 10” 1,440 PSIG MOP pipeline, four 1K bbl API 12-F storage tanks, and PD pump modifications.• Beaumont Manifold Project, Beaumont, TX, (12/2014 – 04/2016): Led project worth $40M to automate, install, and actuate ~240 valves, six pumps, 6,100 combined HP, PCR building, and VFD building, 1,114 flange bolt ups, and 3,263 welds.• Beaumont Tank Project, Beaumont, TX, (12/2014 – 04/2016): Led project worth $114M to install 12 Crude oil tanks for 4,100,000 barrels of storage, 6.8 miles of piping, and fire suppression system.