Project Manager
CurrentResponsible for cost control, document control, development of project schedule, contract negotiations, material and equipment procurement, coordination of suppliers and subcontractors and project conformance of all project documents during the Construction Phase of projects. Assist Preconstruction Manager with estimating, proposals, budgeting and value engineering for Preconstruction Phase of projects.Berthoud WTP Expansion - $3.4 Million - Expansion of existing 2MGD Water Treatment Plant to 4.2MGD. New Flocculator Basins, Conversion of a Clarifloculator Basin to Plate Settler Basins, New Filters, addition of a PAC System and associated site piping and electrical upgrades and modifications.Nunn Booster Pump Station - $500,000 - Installation of an underground, self contained pre-fab pump station and associated site piping.Berthoud WWTP - $2 million - Replacement of existing diffuser system in Aeration Basins, replacement of existing UV System, new diffusers and air system for digesters, replacement of grit system.Dodd Hydroelectric - $2.6 million - New Hydroelectric Facility to convert influent flow to the existing Dodd Water Treatment Plant into electricity utilizing a Hydroturbine Generator and associated site improvements.Platteville Wastewater Treatment Facility - $6.8 million - New Wastewater Treatment Facility for the Town of Platteville. Headworks, Two Sequencing Batch Reactor Basins. Aerobic Digester. New UV Building and new Process and Admin Building. Decommissioning of Sludge Lagoons and various site improvements.Johnstown Central WWTP - $52.8 million - New 2.5 MGD Wastewater Treatment Plant utilizing an MBR system. New Headworks Facility, Process and EQ Basins, MBR Basins, Process Building, Sludge holding Tank, Electrical Building, pump station and associated yard pipe and site work. Decommissioning of existing Headworks, Lagoons and MBBR system.