Dan Lloyd

Dan Lloyd Email and Phone Number

Change Order, Estimator, Cost and Schedule, Auditor - Remote Consultant @ Laguna Woods, CA, US
Laguna Woods, CA, US
Dan Lloyd's Location
Laguna Woods, California, United States, United States
Dan Lloyd's Contact Details

Dan Lloyd work email

Dan Lloyd personal email

Dan Lloyd phone numbers

About Dan Lloyd

NOT AVAILABLE

Dan Lloyd's Current Company Details
Freelance

Freelance

Change Order, Estimator, Cost and Schedule, Auditor - Remote Consultant
Laguna Woods, CA, US
Dan Lloyd Work Experience Details
  • Freelance
    Change Order, Estimator, Cost And Schedule, Auditor - Remote Consultant
    Freelance
    Laguna Woods, Ca, Us
  • Los Angeles Metro - As Consultant With Kkcs
    Sr. Estimator
    Los Angeles Metro - As Consultant With Kkcs May 2022 - Oct 2024
    Senior Lead Estimator for METRO (LACMTA) for future LINK US (Union Station Renovation) Phase A and Phase B for CAHSR. Each of these is 35% Engineering level and is a Class 4 estimate at over 2 billion dollars each. Led estimating team of 5 to estimate all disciplines including environmental issues, Right-of-Way, Engineering, SWPPP, retaining walls, demolition, coordination of new and existing utilities, retained fill, major train bridge over US 101 at Union Station in congested downtown LA, including 14 foot diameter CIDH piles down to 150 feet (dry and wet method) with rebar and columns, girders on top, falsework and shoring, excavation (hazardous and contaminated), and backfill. Customized Excel cost database and pivot tables with coding per CSI and SCC (10-100) (FRA) and worked with CalTrans cost documents. The summary sheet includes the construction costs, soft costs, allocated and unallocated contingencies, compound escalation, and the Risk Management system to finalize the detailed budget to submit to Metro management. Daily meetings with the project manager, the scheduling department, and the design engineering team to estimate and discuss Value Engineering and Best Practices reports. Also involved in change order estimating via daily reports and Primavera Unifier on the $150 million Rosecrans-Marquardt Grade Separation bridge over BNSF tracks. Involved in estimating high level parametric budgets for future work.
  • Freelance
    Change Order, Estimator, Cost & Schedule, Auditor - Remote Consultant
    Freelance Dec 2016 - May 2022
    Pursuing full time PMO work while remotely auditing construction change orders including estimating, scheduling, cost controls from monthly pay applications and reports for material, labor, equipment, and subcontractors, financials, PM, CM, logistics, contracts, take-offs, and logs.Audited 700+ change orders and put into matrix format by subcontractor, discipline, location, and value with graphs for each. Audit hotel room by room and facilities maintenance punch lists. Program wide equipment rental analysis and bid tab analysis. Used Excel, PROCORE, MS Project and Primavera P6 scheduler.
  • Entergy
    Cyber Security Estimator
    Entergy Sep 2016 - Dec 2016
    Corporate Cyber Security Estimator of nine Eastern US Nuclear Power Plants for Entergy, Mississippi. $40,000,000 estimate for Cyber Security project for 9 Entergy power plants.
  • Entergy - Waterford 3 Nuclear Power Plant
    Estimating Manager
    Entergy - Waterford 3 Nuclear Power Plant Feb 2014 - Jul 2016
    Chief (and only) estimator in support of the 29 tab Excel estimating template, Project Delivery System, Contracts, Life Cycle Stage Gate Processes, KPI / COGNOS, Monte Carlo, and Risk Registers. Developed 150 multi-discipline estimates (far more than previous estimators) and maintained 15-year PMO project log. Projects included large nuclear power plant systems, water damage, remediation, field walk-downs and inspections, tower siren systems, HVAC, plant cooling systems, electric generation, transmission, and distribution systems. Million-dollar estimates for all disciplines, equipment, MEP, and systems upgrades, Capital and O&M projects from Class 5 (ROM) to Class 1 (detail) with nuclear WBS. Electronic data transfers with cost engineers, P6 schedulers, and Project Managers. Two refuel shutdowns (STO) using Outlook, Syntempo for TAR scheduling, cost control tracking, load-board analysis, and tracking daily nuclear dose reports for immediate feedback.Grandchildren brought me back to California.
  • Navfac Sw Mci West - Camp Pendleton
    Construction Schedule Analyst - Primavera P6
    Navfac Sw Mci West - Camp Pendleton Jun 2013 - Feb 2014
    Navy representative analyzing and reporting on contractor monthly construction Primavera P6 schedules using Claim Digger, comparing baseline and multiple targets, from over 50 contractors. Microsoft Project and Excel conversions to Primavera P6. Review estimates, claims, and field inspections including airport facilities and systems, structures, roads, & MEP.
  • San Onofre Nuclear Generating Station (Songs)
    Estimating Manager
    San Onofre Nuclear Generating Station (Songs) Nov 2011 - Jun 2013
    Senior Estimator, manager of 3, for NRC regulated Units 2 & 3. Estimated the 2015 General Rate Case working with SCE and SDGE. Strong Nantel, SAP, and ERP skills. Estimated over 50 construction projects from Class 5 (ROM) to Class 1 (Detail) for PMO (Project Management Office), all with written Basis of Estimate (BOE). Developed root cause analysis on repair projects.Maintained 900 item Long Range Planning Log with responsibility columns.The plant closed for the decommissioning phase.
  • Metro Consultant  - Kkcs
    Senior Estimator
    Metro Consultant - Kkcs Sep 2010 - Nov 2011
    METRO (LACMTA) estimator for oversight and audit of contractor change orders on the very large I-405 Widening Project. This included civil and environmental issues, Right-of-Way Engineering, multi-level ramps, SWPPP, retaining walls, soil nail walls, utilities (third party interferences), duct banks, pipelines, piles, bridges, shoring, excavation, backfill, and MOT (Maintenance of Traffic) for the day and night time crews. Customized cost database integrating CalTrans, DWP, and contractor codes and excellent at Excel pivot tables and sumifs. I left since SONGS was only a 12 mile commute against traffic compared to 55 mile commute in traffic.
  • Consulting And Business Analyst
    Self Employed
    Consulting And Business Analyst Jun 2009 - Sep 2010
    Alyeska Alaska Pipeline Project Controls estimating tanks, pipeline, and controls, MEP change orders, teaching pivot tables, baseline scheduling, and auditing utilizing digitized Planswift, Primavera P6, Timberline, and Microsoft Office. Cost Analysis included cost and commitment, full reconciliation, PMBOK tracking, and Life Cycle Costing.
  • Fluor
    Senior Estimator
    Fluor Oct 2006 - Jun 2009
    Irving, Texas, Us
    International EPC company estimating refineries and oil and gas industrial projects. Streamlined the estimating process into Excel , incorporating FEED (Front End Engineering Design), Fluor pipe and fitting manuals, lookups and databases, Fluor Code of Accounts, and CSI codes. All disciplines including Structural, Civil, Architectural, Mechanical, PL/HVAC, Instrumentation, Electrical, (SCAMPHIE) and all indirects. Aspen Tech KBase (ICARUS) parametric modeling expert.Fluor had big layoff, 23 of 25 estimators.
  • Total Western - Oil And Energy
    Lead Estimator
    Total Western - Oil And Energy Mar 2006 - Oct 2006
    Estimator and inspector for THUMS, Port of Long Beach islands, and Los Angeles basin refineries for oil, gas distribution, and pipeline projects. Project presenter at General Electric New York headquarters for all the stainless steel piping for the IEEC-HRSG power plant (Inland Empire) in Perris, California, to win $5,000,000 project. Created the initial Primavera schedule until they hired a scheduler to take over. I left, since Fluor was 2 miles from my house.
  • Bed And Breakfast - Cooperstown
    Owner And Operator
    Bed And Breakfast - Cooperstown Mar 2001 - Mar 2006
    Backyard fence was the third baseline bleachers of famous Doubleday Field in Cooperstown, NY - the home of baseball and just 8 buildings from the Baseball Hall of Fame. In a day, grasped all aspects of running a 6 bedroom B&B and all the internet marketing aspects to go along with staying 100% booked from May to November every year. Made all decisions of a very successful B&B. Thoroughly enjoyed meeting new people daily and and sharing our common bond of baseball, music, and tours of the Baseball Hall of Fame.Grandchildren brought me back to California.
  • Bechtel, Aecom (Holmes & Narver), Brinderson, Carrier, Disney, A.O. Reed, B Of A, Wells Fargo
    Estimator, Scheduler, Cost Engineer, Project Manager
    Bechtel, Aecom (Holmes & Narver), Brinderson, Carrier, Disney, A.O. Reed, B Of A, Wells Fargo Jan 1988 - Mar 2001
    Orbital ATK rocket launch team of three schedulers using Primavera.Bechtel - Disney (France) estimator of amusement venues.Bechtel - lead Primavera P6 scheduler for 15 billion dollar project Eastside Access Subway to Grand Central in New York City for initial resource-loaded schedule.Bechtel Chevron (El Segundo) estimator.Bechtel Morongo Valley 75 mile long 84”/54” UG pipeline with easements right-of-way engineer. Bechtel Engineering week speaker (4 times).Bechtel/LACMTA Red Line Telecommunications Contract - all PMO tasks - estimating, Primavera scheduling, cost engineer using pay apps and PFSR financials to progress the project, and Assistant Manager at closeout.US Army Industrial Hygienist Aberdeen Proving Grounds.US Army Basic Training in charge of 120 men.

Dan Lloyd Skills

Project Control Primavera P6 Change Orders Cost Engineering Construction Construction Management Process Scheduler Cost Management Contractors Bridge Cpm Scheduling Project Estimation Subcontracting Estimates Ms Project Value Engineering Rfi Design Build Microsoft Project Cost Control Scheduling Tenant Improvement Nuclear Project Management Strategic Negotiations Team Leadership Project Planning Contract Management

Dan Lloyd Education Details

  • California Polytechnic State University-San Luis Obispo
    California Polytechnic State University-San Luis Obispo
    Mechanical Engineer Emphasis (Environmental And Hvac)

Frequently Asked Questions about Dan Lloyd

What company does Dan Lloyd work for?

Dan Lloyd works for Freelance

What is Dan Lloyd's role at the current company?

Dan Lloyd's current role is Change Order, Estimator, Cost and Schedule, Auditor - Remote Consultant.

What is Dan Lloyd's email address?

Dan Lloyd's email address is da****@****ail.com

What is Dan Lloyd's direct phone number?

Dan Lloyd's direct phone number is (800) 332*****

What schools did Dan Lloyd attend?

Dan Lloyd attended California Polytechnic State University-San Luis Obispo.

What skills is Dan Lloyd known for?

Dan Lloyd has skills like Project Control, Primavera P6, Change Orders, Cost Engineering, Construction, Construction Management, Process Scheduler, Cost Management, Contractors, Bridge, Cpm Scheduling, Project Estimation.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.